What kind of enterprise is Lianyungang Xinsu Port Terminal Co., Ltd.? Where is the address? Do you have a contact number?

Lianyungang Xinsu Port Terminal Co., Ltd. was established by Jiangsu Xinsu Port Investment Development Co., Ltd., Wanbang Industrial Port Development Management Co., Ltd. and Jiangsu Shagang Group Co., Ltd., and was formally established on February 22, 20 10. The company is responsible for the operation and management of the 300,000-ton ore wharf in Qitai Port Area of Lianyungang Port and the 654.38+ 10,000-ton general bulk berth in Qitai Operation Area of Lianyun District of Lianyungang Port. Among them, the 300,000-ton ore terminal in Qitai Port Area of Lianyungang Port is the largest bulk cargo loading and unloading terminal project built and under construction in Lianyungang and even Jiangsu Province so far.

The company is located in the coastline of the old port area of Lianyungang in the east of Baodi, with the specific geographical location: the eastern end point: B34 44 ′ 06.1″ east longitude and L119 28 ′ 52.6 ″ north latitude; West end point: B34 44 ′15.3 ″ east longitude, L119 28 ′ 25.1″ north latitude. The company's wharf is 755 meters long and 38 meters wide (two berths), covering an area of 0.0287 square kilometers. It is connected with the rear land area by three approach bridges, with a length of 934m, a depth of 859m and an area of 0.8023 square kilometers. The dock can dock a 300,000-ton bulk carrier and a 6,543,805-ton bulk carrier for unloading operations, or dock a 300,000-ton bulk carrier for unloading operations and two 6,543,800-ton bulk carriers for loading operations.

Lianyungang Xinsu Port Terminal Co., Ltd. * * is equipped with large-scale loading and unloading equipment 16, including 4 grab unloaders, 7 stacker-reclaimer turbines, 4 mobile shiploaders 1 set and 4 rail-type mobile shiploaders. The total yard area of the wharf is 0.3792 square kilometers, including 0. 163 square kilometers of front temporary yard and 8 rear yards.

The wharf and the revetment are connected by three approach bridges, with a length of 63m and a width of 12- 19m. The main facilities on the wharf land include 3 substations, maintenance workshops, sewage treatment stations, sampling and preparation buildings (for commodity inspection), 24 transfer stations and 54 belt conveyors, of which 1 # substation is the central substation (central control room). 2 # substation mainly supplies power for backyard loading equipment, and 3 # substation mainly supplies power for dock surface equipment.