2), responsible for the experimental plan, and organize the drafting, modification, supplement and implementation of the plan and a series of technical organization and management work.
3) Instruct and deal with the technical problems during the experiment in time to ensure the normal operation of the experiment.
4), do a good job of docking with Wangtaipu Mine and Tiandi Company, so that the two sides can maximize data interoperability and complement each other.
5), check the test results every day, in order to determine the material ratio of filling the next day, and issue a mud certificate to Wangtaipu Mine.
6) Review the inspection results of each batch of raw materials, and contact the safety dispatching department for filling after ensuring that the raw materials are qualified.
7) Organize technicians to compare the technical achievements and economic benefits every month, and assess the monthly work of technicians.
8) Be responsible for preparing the technical development plan of the project department, and introduce and train professional and technical personnel in a planned way.
Thereby further improving the work of the technology research and development department.
9) Actively carry out technical exchanges with scientific research institutes such as University of Science and Technology Beijing, and do a good job in technical docking.
10), and complete other related matters assigned by the leaders of the project department on time.