House demolition is a very important matter, which naturally needs contract to guarantee. The following is the house demolition contract compiled by, welcome to read. For more articles about the house demolition contract, please pay attention to the column of contract template.

House Demolition Contract (I) Party A:

Party B:

Party A will contract the existing house located atNo. Tang Zhong Town 1, Lane 10, Xialu Village, central and southern Dongguan to Party B for demolition. In order to ensure the smooth completion of the house demolition work and not harm the interests of both parties, the following terms are hereby made through consultation between both parties:

1. Demolition scope: civil works and foundation of Tang Zhong Town 10 Lane 1 House and Xialu Village in central and southern areas, with cement blocks and brick residues partially removed and transported abroad.

Two. Ownership of materials: The steel bars and scrap iron in this project are owned by Party B, and the bricks are purchased by Party A from Party B at the price of 20 cents each.

3. Demolition cost: Party A shall pay Party B RMB 1,600 (65,438+0, 600 yuan) for the labor cost of demolition.

Four. Safety responsibilities: All safety responsibilities shall be borne by Party B. ..

Verb (abbreviation of verb) payment method: After the construction site is completed, Party A pays the subsidized labor cost and red brick money in one lump sum on the spot.

6. This contract is made in duplicate, one for each party, and both parties shall abide by it. This contract shall come into effect after being signed by both parties.

Signature of Party A: Signature of Party B:

Date 20 12

two

Employer (hereinafter referred to as Party A)

Contractor (hereinafter referred to as Party B)

In accordance with the Contract Law of People's Republic of China (PRC), Regulations on Construction and Installation Contract, laws and regulations on construction and lighting, and following the principles of equality, voluntariness, fairness and good faith, the following agreement is reached on matters related to the construction of this project through consultation between both parties:

Article 1: Project Overview

Project name, project location and project content Article 2: Contract scope: buildings, etc.

Article 3: Project Date

Entry date:

Last month, according to Party A's relocation, it was decided to demolish a room, and the demolished renewable resources such as steel bars and bricks were owned by Party B. ..

Article 4: Obligations of both parties

I. Party A's responsibilities:

Be responsible for cutting off water, electricity, gas and communication during house demolition, and coordinate with Party B in all aspects.

Ensure the integrity of the internal decoration of the demolished buildings, structures, doors, windows and wires.

Responsible for the supervision and inspection of the demolition construction site.

Responsible for the acceptance of the demolished plots.

Two. Party B's responsibilities:

1. Enter the construction site on time as required by Party A to ensure the smooth completion of the construction period.

2. Be responsible for the demolition, removal and cleaning of all buildings and accessories listed in this agreement.

3. All responsibilities and expenses such as accidents and administrative penalties caused by Party B shall be borne by Party B itself.

4. Prepare a safe demolition construction plan, adhere to the civilized construction of the demolition site, and arrange personnel to clean up the access roads at the construction site in time. The standard code of recycled materials should have strict designated areas, and it is forbidden to pile any materials on roads and pavements.

Article 5: Liability for breach of contract

If either party breaches the contract, the breaching party will bear all economic losses and related responsibilities caused by the breach.

Article 6: Safe construction:

1. Party B shall take strict safety protection measures in accordance with relevant regulations, and bear the responsibility for accidents caused by its own ineffective safety measures and the expenses arising therefrom.

Second, machinery and personnel should be insured before entering the site. The insurance premium is considered in the quotation, and Party A will not pay it separately. All safety accidents caused by Party B shall be borne by Party B. ..

3. Before Party B starts construction in the vicinity of power equipment, high-voltage lines, underground passages, inflammable and explosive areas and street traffic arteries, Party A shall arrange professionals to cooperate.

Article 7: Disputes

Any dispute between Party A and Party B shall be settled through consultation for the purpose of friendly cooperation.

This contract is made in duplicate, each party holds one copy, and the signature and seal have the same legal effect.

Date of signing this contract:

Employer: Contractor:

Address: Address:

Legal representative:

Authorized Agent: Authorized Agent:

Tel: Tel:

House Demolition Contract (II) Employer (full name): Chongqing Chang 'e Real Estate Development Co., Ltd. (hereinafter referred to as Party A) Contractor (full name): the third branch of Chongqing Tongnan Fourth Construction Engineering Company (hereinafter referred to as Party B). According to the Contract Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, both parties negotiate on the construction of this house demolition project on the principles of equality, voluntariness, fairness and good faith.

I. Overview of the Project

Name of the demolished house: temporary office building of Chongqing Chang 'e Real Estate Development Co., Ltd.

Project location: Hua Gang Road, dadukou district, Chongqing (left side of the People's Armed Forces Department)

Construction content: house demolition

Second, the project contracting scope:

Scope of contract: house demolition and construction waste loading.

Form of contract: Party A collects the residual value of Party B's house of 3,000.00 yuan. Demolition of building materials for houses

Belongs to Party B and moves out of the construction site by itself.

III. Term of the contract:

Commencement date: 20 1 1 May 23rd, 2008.

Completion date: 20 1 1 June 13.

The total calendar days of the contract duration is 20 days.

Four, safety responsibility:

Verb (short for verb) Other:

Where possible, Party A shall provide Party B with water and electricity interfaces for construction, and Party B shall bear the required materials and usage fees. This contract is made in duplicate, one for each party, and shall come into effect after being signed or sealed. If one party breaches the contract, it shall bear all the losses of the observant party.

Party A: Representative:

Contact telephone number:

Party B: Representative:

Tel: 20 1 1 mm/DD/YY.

two

Employer (hereinafter referred to as Party A):

Contractor (hereinafter referred to as Party B):

According to the Contract Law of People's Republic of China (PRC), Regulations on Construction and Installation Contract, Regulations on Construction Project Contract and other relevant laws and regulations, and following the principles of equality, voluntariness, fairness and good faith, the following agreement is reached on labor services in the construction of this project through consultation between both parties:

Article 1: Project Overview

1. Project name: private residence.

2. Project Location: No.72, Commune Road, Jingchuan County.

Three. Project content: Demolition of old houses (see attached figure for the scope of demolition).

Article 2: Scope of Contract

Demolition of the whole old building (including foundation) within the scope of drawings provided by Party A (see attached drawings for details). The house was demolished to the terrace, and the foundation was demolished? All masonry and cushion below 0.000. After the demolition, Party B shall, according to Party A's requirements, restore the demolition site to a state that will not affect the construction of new buildings.

Article 3: Construction Period

1. Entry date: 20 1 1 year, and completion date: 20 1 1 year.

2. The total construction period is days, and the project progress will vacate all the demolished houses according to the relocation of Party A, so as to ensure the smooth progress of the demolition project. Party A shall deliver all the demolished houses to Party B within () days after the signing of this contract.

Article 4: Contract Price, Payment and Settlement of Project Funds

1. The expenses paid by Party A to Party B shall be calculated at five yuan per vehicle (each vehicle shall be loaded with no less than cubic meters).

Second, when the project is completed, Party A will pay all the project funds.

Article 5: Responsibilities of both parties

I. Party A's responsibilities:

1, responsible for water, electricity, gas, communication, etc. of the demolished houses.

2. Cooperate with Party B to coordinate all aspects.

3. Ensure the integrity of the buildings and structures to be demolished.

4, responsible for the supervision and inspection of the demolition of the construction site.

5. Responsible for the acceptance of demolition plots.

Two. Party B's responsibilities:

1. Enter the demolition site on time as required by Party A to ensure the smooth completion of the construction period.

2. Be responsible for the demolition, removal and cleaning of all buildings and accessories listed in this agreement.

3. All responsibilities and expenses such as accidents and administrative penalties caused by Party B shall be borne by Party B itself.

4. Prepare the demolition environmental protection scheme and safety construction scheme, adhere to civilized construction at the demolition site, arrange personnel to clean up the roads in and out of the construction site in time, and pile up recycled materials in strict areas. It is forbidden to pile up any materials on roads and passages.

5. Any materials and unearthed objects on Party A's construction site belong to Party A, and Party B and construction personnel have no right to dispose of or take them away. Otherwise, Party A has the right to deal with the breach of contract, and Party B (the contractor) is responsible for restoring the original state, and Party A will not bear any negative impact.

Article 6: Liability for breach of contract Party A shall deliver the construction site within the time stipulated in the contract, and if Party B fails to complete the demolition task within the time stipulated in the contract, a fine shall be calculated according to 50 yuan for each day of delay.

Article 7: Safe construction

1. Party B shall take strict safety protection measures in accordance with relevant regulations, and bear the responsibility for accidents caused by its own ineffective safety measures and the expenses arising therefrom.

Second, strictly check whether the machinery can enter the construction site before entering the site, and the operators must be insured. Party A will not pay separately. Party B shall abide by the operating rules and carry out the construction on the premise of ensuring safety, and it is strictly forbidden to operate illegally. Party B shall take full responsibility for the safety accidents caused by Party B. ..

Three. In case of major accidents, Party B shall immediately report to relevant departments and notify Party A's representative according to relevant regulations. At the same time, according to the relevant requirements of the government.

4. Before Party B starts construction in the vicinity of power equipment, high-voltage lines, underground passages, lots and street traffic arteries, it is necessary to repeatedly demonstrate that it is correct before construction; Meanwhile, Party A shall arrange professionals to cooperate.

Article 8: Disputes

Any dispute between Party A and Party B shall be settled through consultation for the purpose of friendly cooperation. This contract is made in quadruplicate, each party holds two copies, and the signature and seal have the same legal effect. Date of conclusion of this contract: year month day.

Employer: Xu, Contractor:

Address: Address:

Legal representative:

Authorized Agent: Authorized Agent:

Tel: Tel:

Signature of Party B (handprint): Signature of Party B (handprint):

ID number: ID number:

More information is available at:

I recommend it carefully.