What is the ride process of Guangzhou BRT?

1, look at the stop sign and choose the route. There is a stop sign at the entrance of the station to show the station settings of each line, and citizens can choose the corresponding line according to their destination before entering the station.

2. After choosing a good route, citizens can enter the platform and reach the gate through tunnels, footbridges and zebra crossings. Citizens can choose to swipe their cards or coin at the gate. After entering the gate, you should wait at the corresponding platform.

After entering the gate, citizens can follow the corresponding signs to enter the BRT platform and wait for the bus. When waiting for the bus, citizens should not cross the yellow safety line set on the platform, but should follow the instructions of the on-site staff. Passengers can get on the bus from the front and rear doors of the vehicle, and at the same time, they must get on the bus in a way of getting on first and then getting off, so as not to cause congestion.

Extended data

trait

1, domestic

(1) The peak passenger flow is more than twice that of other BRT systems in China; The first platform design includes bicycle parking spots and public bicycle rapid transit system;

(2) The first bus rapid transit system operated by several bus companies; The largest BRT bus fleet, with 8 1 1 brand-new BRT buses at the initial stage of operation, will purchase more vehicles.

2. International

(1) The first large-capacity "flexible" BRT system, BRT vehicles can enter and leave the corridor; The first BRT system to realize the direct physical connection between BRT platform and subway station;

(2) The longest BRT platform in Asia; According to the design specification, BRT platforms have the largest number of passengers in the world, and these stations will have more than 4,000 passengers per hour.

Baidu encyclopedia-Guangzhou BRT