Brief introduction of Huaneng Qinling power plant
Huaneng Shaanxi Qinling Power Generation Co., Ltd. is located at the foot of Huashan Mountain in Xiyue, with Qinling Mountain in the south and Weihe River in the north. Longhai Railway and Lianhuo Expressway pass through both sides of the factory. The company has a beautiful environment and convenient transportation. The company was formerly known as Qinling Power Plant of Northwest Electric Power Administration, with total installed capacity. The first unit was built in&; lt; 1968 preparation, completed in three phases. In the first phase of the project, two turbine-generator sets produced by Shanghai Electric Group were installed, which were completed and put into operation in February 1972 and September 1974 respectively. Four 200MW turbo-generators produced by Dongfang Electric Group were installed in the second and third phases, and construction started in March 1978. 1October 165438, all four stations were completed, ranking first in the northwest and fourth in the country.