Development of Industrial Park in Shiyan Economic and Technological Development Zone

Longmen Industrial Park is a key mountain improvement project in Shiyan Economic Development Zone and the main battlefield for the future economic development of the Development Zone. The park has a total planned area of 6,000 mu, with a planned total investment of 654.38+0 billion yuan. After the completion of the industrial park, it can accommodate more than 50 large, medium and small enterprises, with an additional output value of 30 billion yuan and an additional tax revenue of 6,543.80 billion yuan.

At present, the first phase of Longmen Industrial Park has developed 4000 mu of mountainous area, and Jilin Road, Longmen Avenue and Hangkong Road are planned to connect with Dongfeng Avenue and Bai Xu Road respectively. At present, 25 enterprises above designated size have been arranged in the park, including 2 projects with over 100 million yuan/kloc-0. At present, we are fully promoting the construction of 654.38+10,000 car bodies, 654.38+10,000 special vehicles, modified vehicles and 500,000 mini-cars. Most of these projects will be completed and put into operation in the first half of this year. After all these projects are completed, the goal of rebuilding a development zone can be achieved. The planned land area of Hong Kong, Macao and Taiwan Industrial Park is 1.500 mu, and the planned total investment is1.500 million yuan, with a construction period of two years. The whole park is divided into Hong Kong, Macao and Taiwan-funded enterprise park, military vehicle project park, foreign trade industrial park and vehicle and parts project park. The mountain consolidation and development of this project adopts the mode of "village group development and government redemption".

Hong Kong, Macao and Taiwan Industrial Parks adhered to the principle of "high starting point planning, high standard construction and high efficiency management" and completed the tasks of mountain consolidation and "three links and one leveling". The industrial park has signed contracts to settle in Dongfeng Songaluminum Heat Exchanger Co., Ltd., Hubei parfitt Construction Machinery Co., Ltd., Shiyan Songfutong Automobile Air Conditioning Compressor Co., Ltd., Shiyan Thunderstorm Industry and Trade Co., Ltd., Shiyan Xianlong Real Estate Co., Ltd. and Foreign Trade Industrial Park. Now it has entered the stage of planning, design and plant construction, and four of them have been completed and put into operation. After all these projects are completed and put into operation, the output value will increase by 3.2 billion yuan, the foreign exchange will be 654.38+0.2 billion dollars, and the tax revenue will be 654.38+0.2 billion yuan. The planned area of Shen Ying Industrial Park is 1.400 mu, with an estimated total investment of 2 billion yuan and a workshop area of 520,000 square meters. After the completion of the industrial park, the new output value will be 23.3 billion yuan, the new tax revenue will be 550 million yuan, and more than 8,000 new jobs will be created.

The park is divided into three parts: Shen Ying Special Purpose Vehicle Production Area, Shaanxi Automobile Baohua Special Purpose Vehicle Production Area and Parts Processing Area. The design capacity of the first phase is 654.38+10,000 vehicles and chassis, and the second phase will form 250,000 vehicles and chassis. At present, the planning and design of the park has been completed, the mountain improvement has been steadily advanced, and some projects are under construction and will be completed by the end of 20 1 1. After completion, the products in the whole park will form five series: dump trucks, semi-trailers and storage trucks, tank cars, municipal sanitation vehicles and spare parts products, and the production scale of some products will reach the domestic and even international advanced level. Wenzhou Auto Parts Industrial Park is one of the "Double Billion Project" enterprises of Shiyan Municipal People's Government, specializing in the production and research and development of auto parts. The project is located on the hillside and river bend, with 97 mu of barren slope and 177 mu of river course, and 49 scattered residents occupy the homestead, with a total project area of about 475 mu. In order to make full use of this land, the Development Zone * * * invested 32 million yuan to excavate the original 2 million cubic meters of earth and stone mountain into a 80-meter ×730-meter straight river course and a 35-meter ×730-meter high-grade highway subgrade, backfill the old river course of 1.800 m110 million cubic meters, and backfill the residential land of 300,000 cubic meters. The project has a total investment of 500 million yuan, covering an area of 330 mu, and has now settled in 16 enterprise. Products cover castings, hydraulic parts, car bodies, plastic processing, seals, stamping parts, molds, seats and other 20 kinds of auto parts. Most enterprises have been put into production in February this year, and the projects under construction are expected to be completed and put into production in June this year at 65438+ 10. The whole park is expected to realize annual sales income of 2 billion yuan and tax revenue of 50 million yuan.