Summary of Grade B contents of geodetic surveying and mapping qualification

There are 30 sets of geodetic satellite positioning survey, satellite navigation and positioning reference station network position data service, leveling survey, triangulation survey, astronomical survey, gravity survey, baseline survey, geodetic data processing 6047 1336GNSS receiver (choke antenna), total station, level and gravimeter.

Have obtained Grade B surveying and mapping qualification of corresponding professional category for 2 years. The total value of surveying and mapping services of various professional categories applied for in the past two years is not less than 6 million yuan, and at least one surveying and mapping project with an amount of not less than 500,000 yuan has been completed. 15 GNSS receivers, total stations and leveling instruments are not allowed to engage in second-class or above leveling, triangulation and astronomical survey; Shall not engage in satellite positioning survey above Grade B; Not engaged in professional gravity measurement; Shall not undertake the construction of satellite navigation and positioning reference stations and coordinate reference frame services.

Basic requirements: 1. Establish a surveying and mapping geographic information security agency.

2. Personnel engaged in classified surveying and mapping business shall have People's Republic of China (PRC) nationality, sign a letter of confidentiality responsibility, and receive confidentiality education.

3. Establish and improve the safety management system of surveying and mapping geographic information. Clarify the requirements for the management of confidential personnel, key departments, confidential equipment and storage media, the whole process of confidential surveying and mapping results, and self-inspection of confidentiality.

4. Clear the approval process and responsible person for the use of classified surveying and mapping results. Without approval, the results of classified surveying and mapping shall not be taken away from the key departments of classified.

5. Secret storage media should be managed by special personnel, and a ledger should be established; Confidential equipment and storage media should be labeled with confidential identification; Confidential computers and confidential storage media are not allowed to access the Internet or other public information networks; Physical isolation between classified networks and the Internet or other public information networks; Closed management of external ports of classified computers.

6. Establish and improve the security and confidentiality management system of classified surveying and mapping field work, implement the supervisory personnel and confidentiality responsibilities, and incorporate the classified computers used in the field work into the classified single machine for management.

7. The acquisition, holding, provision and utilization of geographic information belonging to state secrets shall be registered and preserved for a long time, and traceable management shall be implemented.

8. Engaged in surveying and mapping activities, shall abide by the confidentiality laws, regulations, rules and other relevant provisions.

B, technology and quality assurance system requirements

Institutional personnel:

1. Establish technical and quality management institutions.

2 clear technical and quality management work in charge of leadership, technical and quality management institutions. The person in charge of the technical and quality management institution shall have the title of surveying and mapping technology at or above the intermediate level.

3 equipped with quality inspection personnel to adapt to the business. Quality inspection personnel should be professional and technical personnel of surveying and mapping.

Management system:

1. Establish and improve the technical management system, and specify the requirements for technical design, technical treatment and technical summary. Among them, simple and routine surveying and mapping projects can formulate "work instructions".

2. Establish and improve the quality inspection management system, and specify the requirements for process inspection, final inspection, quality evaluation, inspection records and inspection reports.

3. Establish and improve the system of personnel training and post management, and clarify the requirements of post responsibilities, pre-job training and assessment, and continuing education.

4 establish and improve the management system of surveying and mapping instruments and equipment verification and calibration, and clarify the requirements of surveying and mapping instruments and equipment verification and calibration and daily management.

Others:

Surveying and mapping technology and quality assurance system shall comply with the relevant provisions of laws, regulations and rules.