Nowadays, the public's legal awareness is constantly increasing, and many occasions are inseparable from the contract. Signing a contract can balance the equal status of both parties. So what are the common contracts? The following is the contract template (5 selected) for painting the interior and exterior walls, which I compiled, hoping to help you.
1 Internal and external wall painting construction contract (Party A): _ _ _ _ _ (hereinafter referred to as Party A)
Contractor (Party B): _ _ _ _ _ (hereinafter referred to as Party B)
In order to ensure the engineering quality, ensure the safe and civilized construction, and complete the subcontract construction task on schedule, both parties sign this subcontract through consultation on the principle of equality and voluntariness.
I. Overview of the Project
1, project name: Jincheng Garden Community, Wuzhishan City
2. Project Location: Huanshi West Road, Wuzhishan City
3. Contract scope of project content: exterior wall paint and interior wall putty powder (part).
4, construction technology:
1, external wall
(1) Scrape off the waterproof layer
(2) scrape two outer wall putty.
③ polishing
④ Scoring grid
⑤ Wash the external wall with water-based primer.
⑥ Wash the second exterior wall water-based topcoat.
⑦ Wash the top coat of frame joints.
2, interior wall ① scrape two interior wall putty, and polish it by calendering.
Second, the project cost and contracting methods
1, contracted amount
The total brush area of this project is calculated according to the actual working face. Exterior wall per square meter 10.5 yuan, indoor area of 7 yuan, outdoor line (horizontal line) per meter 1.5 yuan. Except for the design changes signed by Party A and the projects agreed by both parties, the settlement price will not be adjusted.
2, the way of contracting
Contract the project according to the construction quotation, that is, the contracted project does not contain materials, and at the same time ensure the construction period, quality and safety issues.
Third, the construction cycle
1, the total duration of the project is _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
1, the construction period shall not be postponed unless the following circumstances occur
1. The construction drawings are modified due to Party A's proposal.
Encounter an irresistible event
C, due to power failure for 4 consecutive hours or more than 12 hours in a week.
D, due to rain and other reasons. Not suitable for coating construction.
3. Once the situation affecting the construction period is eliminated, Party B shall immediately resume work.
Four. Responsibility of both parties
1, Party A's responsibility
A. Provide Party B with construction drawings and related materials before construction.
B, provide construction site.
C, provide living places, water, electricity and external wall construction frame.
D. Cooperate with Party B to handle matters related to local projects.
2. Party B's responsibilities
A, according to the construction drawings for construction, do a good job of self-inspection, to ensure the engineering quality and contract time limit for a project.
B, according to the provisions of the construction safety accident prevention measures, to ensure the construction safety and the safety of the third party.
C, completes the construction organization, management and maintenance of site cleaning, and timely removal of garbage and unused temporary facilities.
D the one-year warranty period from the date of completion belongs to the construction quality problem, and Party B is responsible for free maintenance. The warranty period of the project is one year.
E in case of safety problems, all responsibilities shall be borne by party b. ..
Verb (abbreviation of verb) payment and settlement of project funds
1, every 10 day, according to the on-site person in charge's certificate, 80% of the project payment can be paid at most for the completed project amount, 95% of the project payment can be paid within 2 months after the coating project is completed, and 5% can be used as the warranty payment, and the warranty period is one year. If there is any quality problem within one year from the date of completion acceptance, Party B shall carry out unconditional maintenance by itself; If Party B fails to carry out maintenance, Party A may send someone to carry out maintenance, but all maintenance costs will be deducted from the warranty fund.
Six, engineering requirements and punishment measures
Party B must ensure that the number of construction workers meets the needs of the project progress and that the construction tasks are completed on schedule or ahead of schedule. If the determined progress cannot be completed on schedule, the following penalties will be imposed:
1. If each construction period fails to meet the requirements, the liquidated damages for this construction period shall be 1000 yuan.
2, the total time limit for a project can not meet the requirements, in addition to a time limit for a project according to each time limit for a project fine, the total contract unit price of quantities will be reduced by 20%.
3. If Party B fails to complete the contract on schedule, Party A has the right to unilaterally terminate the contract, and the completed workload shall be settled at 60% of the contract unit price, and the rest shall be used as compensation for Party A's delay in re-employing the subcontracting team or Party A's own supplementary implementation personnel, and the unit price shall be calculated at twice the contract unit price and deducted from Party B's settlement.
Seven. Insurance treatment
The purchase of labor insurance during the construction period shall be handled by Party A, and the expenses shall be borne by Party B. ..
VIII. Handling of documents
When Party B's personnel work on the site, they need ID cards, family planning certificates and other documents. Every worker must bring the original ID card to the clerk of Party A on the first day of entering the site to buy work-related injury insurance and handle relevant documents. Otherwise, Party B shall be responsible for all safety accidents. If Party B's employees violate the safety operation rules and the safety production ban, Party B shall be responsible for the safety accidents. Other safety regulations shall be implemented according to the labor safety agreement signed by Party A and Party B, and both parties have no objection. Attachment: one copy of the labor safety agreement.
9. The safety helmet worn by Party B's workers must be purchased by themselves. If not, Party A can buy it for it, and the expenses shall be borne by Party B. ..
X. liability for breach of contract
1. After this contract comes into effect, Party A and Party B shall perform all the terms stipulated in this contract (including the contract annexes confirmed by both parties) and shall not change or terminate it without authorization, otherwise, the breaching party will pay the other party 10% of the labor cost of the construction content as liquidated damages and bear other economic losses caused thereby.
2. If the decoration project undertaken by Party B fails to pass the appraisal or does not meet the requirements, Party B shall rework it, and the expenses arising therefrom shall be borne by Party B. ..
XI。 Arbitration and mediation
In case of labor disputes and economic disputes, both parties agree to mediate by the labor department or the people's court.
Once this contract is signed, both parties shall consciously perform their contractual obligations and shall not go back on their words. This copy is made in duplicate, one for each party. It will take effect after being signed and sealed by both parties, and will automatically become invalid after the project payment is settled.
Party A: _ _ _ _ _ _ Party B: _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Internal and external wall painting construction contract II Party A: _ _ _ _ _ (hereinafter referred to as Party A)
Party B: _ _ _ _ _ _ (hereinafter referred to as Party B)
In order to ensure the project quality and complete the construction task on time, the following contract is reached through friendly negotiation between Party A and Party B in accordance with the relevant provisions of the Contract Law and on the principle of voluntariness and equality:
1. Project location: Pu Xian Village, Dongsheng Town, Shuangliu County.
Second, the project content:
In the interior wall putty, latex paint and exterior wall coating project of Sanhe Aitingfu Building, firstly, the higher part and other sundries are knocked off indoors with a chisel, then filled with cement, white powder and glue, and then closed twice with putty powder. Indoor and outdoor walls and ceilings shall be flat and smooth, and the lines at the corners of Yin and Yang shall be clear and straight. Stairwell practices are the same as indoors, except that white latex paint (common latex paint Nippon or Bauhinia brand) is brushed twice.
3. Contracting method: Party B contracts the project and materials.
Fourth, the project price:
1. Indoor putty is _ _ _ _ _ _ _ yuan per square meter.
2. Latex paint for stairwell basement is RMB _ _ _ _ _ _ _ per square meter (provided by Party A).
3. The high-rise exterior wall coating is _ _ _ _ _ _ yuan per square meter (latex paint is provided by Party A).
4. Multi-layer exterior wall coating is RMB _ _ _ _ _ _ _ yuan per square meter (latex paint, provided by Party A as Nippon or Bauhinia brand).
5. Fire retardant coating for the ceiling of the elevator hall is _ _ _ _ _ _ _ yuan/square (the ceiling is crack resistant, excluding fire retardant coating).
Verb (abbreviation for verb) Terms of payment:
Pay according to the construction progress, 70% of the completed project amount will be paid on 25th of each month, and 75% of the project payment will be paid after the project is completed. The remaining amount shall be paid to 95% of the project payment within two months after the completion acceptance, and the remaining 5% shall be paid in one lump sum after one year as the quality guarantee.
Six, the project duration:
This project starts on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Seven, quality and construction technical requirements:
1, the grade and product variety of coating engineering should meet the design requirements and the provisions of current national standards.
2, paint comes into play should have product quality certificate (certificate), should use industry recommended products and environmental protection products.
3. Moisture content of matrix or base of coating engineering: When water-based and emulsion coatings are applied to concrete and plastering surfaces, the moisture content shall not be greater than 10%.
4. Before the paint is dried, it should be protected from rain, dust and hot air.
5. The putty used in painting works shall be solid and firm, and shall not be pulverized, peeled or cracked. Putty should be polished flat after drying and cleaned up. Exterior walls, bathrooms and other parts that need painting and coating should use water-resistant putty.
6. The working viscosity or consistency of the coating must be controlled so that it does not sag or brush lines during construction, and it shall not be diluted arbitrarily during construction.
7. Two-component or multi-component coatings should be mixed in batches according to the mixture ratio specified in the product description before use, and used up within the specified time. All coatings should be fully stirred before and during coating.
8. When mechanical spraying is used, the parts not sprayed should be covered to prevent pollution.
9. Finished products or semi-finished products (including those prepared at the site of use) shall have product names.
10, the exterior wall coating should use alkali-resistant and light-resistant pigments, and the putty is dry powder. The mixture ratio of two-component putty should comply with the provisions of national standards.
1 1. When the exterior wall coating project is constructed in sections, the dividing line shall be the frame joints, the internal corners of the wall or the downpipe, and the same batch of coatings shall be applied to the same wall.
12. Construction process: cleaning → mending gaps → scraping putty → smoothing → sealing bottom → polishing → first brush → second brush → until acceptance.
13, coating before the formal construction, should first make a model room (block) by the construction, supervision and construction of the three parties * * * acceptance rear can formal construction.
Eight. Party A's responsibilities:
Party A shall provide normal water supply, power supply and coordination, ensure the funds are in place and pay wages on time. Party A shall be responsible for the delay in the construction period if the project payment cannot be put in place on time.
Nine. Party B's responsibilities:
Party B's personnel obey the management of Party A, abide by the rules and regulations of the construction site, do not cut corners, ensure the project quality according to the specifications, and complete the construction tasks on time. If the quality and progress can't meet the requirements, Party B shall be responsible for all losses caused by rework and impose corresponding fines.
X. Safety responsibilities:
According to relevant regulations, Party B shall regularly educate and learn safety knowledge for employees, make safety disclosure before shift seriously, and take strict safety protection measures. If Party B's own safety measures are not effective, all responsibilities and expenses arising from safety accidents shall be borne by Party B (safety helmet and safety belt shall be provided by Party B). Other reasons, according to who is responsible for the violation, the size of the responsibility to deal with.
XI。 Matters not covered in this contract shall be settled by both parties through consultation.
This contract is made in duplicate, each party holds one copy, which shall come into force after being signed and have legal effect.
Party A: _ _ _ _ _ _ Party B: _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Three parties to the internal and external wall painting construction contract (hereinafter referred to as Party A): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Construction party (hereinafter referred to as Party B): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Based on the principle of equality, voluntariness and consensus, Party A and Party B have reached the following agreement on matters related to Party B's contracting of Party A's home painting and decoration project (hereinafter referred to as the project):
Project address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Project content: See Annex 1 for details.
Entrusting method: Party A provides the materials and Party B guarantees the work.
Construction period:
1. Commencement date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
2. Completion date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
5. Total project cost: _ _ one million and fifty yuan.
Rights and obligations of party a:
Party A is responsible for purchasing building materials by itself. The purchased materials shall meet the relevant standards stipulated by the state, and the materials must be purchased in the member stores of the Association. If the paint is not purchased in the store of the association member, the contract may be invalid.
The materials purchased by Party A shall be kept by Party B. Party B shall be responsible for compensating the losses caused by improper keeping.
Party A shall go through the construction procedures (passes, etc.). ) for the use of construction personnel. Provide water, electricity and scaffolding needed for construction. If it is necessary to use the public parts temporarily during the construction period, Party A shall greet its neighbors.
During the construction process, when Party A needs to change or add construction projects, it shall promptly and truthfully inform Party B, and both parties shall sign an engineering change order and negotiate the cost.
Party A shall cooperate with Party B's construction personnel.
Seven. Rights and obligations of Party B:
Party B's construction personnel shall carry out the construction in strict accordance with the process regulations.
Party B shall take protective measures against other items purchased by Party A. ..
Supervise according to the construction procedure, and report the supervision and construction progress to Party A in time.
Party B shall complete the project on time. If the construction period is delayed due to force majeure, it shall be settled through consultation with Party A. ..
Eight, grassroots inspection:
When Party B checks the grass-roots situation at the project site, if it finds factors that may affect the painting effect, it shall put forward rectification opinions in time, and Party A shall implement them ... After rectification, Party A and Party B shall make written confirmation. If it cannot be changed with paint due to objective reasons, both parties shall make records and confirm in advance.
Nine, engineering construction and acceptance criteria:
Annex II
X. payment terms:
1. After the contract is signed, Party A shall pay the down payment 600 yuan first.
2. Five days after Party B's personnel enter the site for construction, Party A shall pay 25% of the total project cost, namely _ _ _ _ _ _.
3. After the wood paint is completed, Party A shall pay 50% of the total project cost, namely _ _ _ _ _ _ _ _.
4. After the interior wall latex is completed, both parties shall conduct acceptance according to the acceptance criteria within 3 working days. After the acceptance, Party A shall pay off the balance of the project, namely _ _ _ _ _ _ _ _ _.
If the project changes, Party A shall pay the price agreed by both parties to Party B..
XI。 Warranty commitment after renovation:
Party B shall undertake the warranty responsibility within the quality scope of the decoration project, and the warranty period shall be 2 years from the date when the project is completed and accepted.
During the warranty period, Party B shall be responsible for the coating construction expenses caused by improper construction of Party B. ..
The warranty content is in the form of maintenance. And only responsible for the quality of the coating, and do not bear other joint and several responsibilities.
During the warranty period, Party B shall confirm that it belongs to the warranty scope after receiving the notice, and send someone to repair it within 5 working days.
During the warranty period, it is caused by improper use of Party A, non-decorative external forces or irresistible factors (natural aging, structural degradation, temperature difference shrinkage, carbonization shrinkage, etc.). ) is not covered by the warranty. If Party B wants to repair, Party A shall be responsible for the maintenance materials and labor costs.
Twelve. Liability for breach of contract:
After the contract comes into effect, the party who cancels the contract without authorization shall pay the other party 10% of the total contract amount as liquidated damages.
If Party A fails to make payment on schedule without justifiable reasons, and Party B has the right to stop the construction after being urged by Party B, and the consequences arising therefrom shall be borne by Party A.. ..
If Party A fails to make payment as stipulated in the contract, or delays the completion due to Party A's reasons, it shall pay Party B 1‰ of the contract project price for each day overdue.
If Party B fails to complete the project according to the contract period or the construction quality fails to meet the requirements, Party B must rework and repair it. If the construction period is delayed due to rework, Party B shall pay Party A 1‰ of the contract project cost for each day of delay.
Thirteen. Dispute settlement: friendly negotiation between the two parties. If negotiation fails, it may be decided by the people's court where Party B is located.
Fourteen Validity of the contract: This contract is made in duplicate, with each party holding one copy. It comes into effect after being signed and sealed by both parties, and the supplementary contract has the same legal effect.
Party A: _ _ _ _ _ _ Party B: _ _ _ _ _ _
ID number: _ _ _ _ _ Representative: _ _ _ _ _ _
Contact information: _ _ _ _ _ _ Contact information: _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Internal and external wall painting construction contract 4 Party A: _ _ _ _ _ _ _ _
Party B: _ _ _ _ _ _
In order to successfully complete the agreed construction project and clarify the mutual rights and obligations of the employer and the contractor, the following contract terms are reached through repeated consultations between Party A and Party B in accordance with relevant laws and regulations and in combination with the actual situation of the project:
I. Name and location of the project:
Project location:
Project name: huaxin cement (Zigui) Co., Ltd. Material Spare Parts Warehouse Roof Coloring, Spare Parts Warehouse Wall Coatings, Clinker Conveyor Belt Lower Wall Exterior Wall Coatings, Cement Factory Wall Exterior Wall Coatings, Administrative Building Exterior Wall Coatings, etc.
Second, the content and scope of the project labor contract:
Contract content: cleaning the base, exterior wall paint, scaffolding, cleaning the site, etc.
Third, the contracting method and project settlement: contracting for work and materials.
Settlement price: Party B's labor and materials, exterior wall coating 16.5 yuan /m2 (excluding tax).
Fourth, the time limit for a project requirements:
Party B must organize the construction in strict accordance with Party A's reasonable project schedule requirements.
Five, the project quality:
Make the contracted project meet the requirements of construction specifications and quality evaluation standards of construction and installation projects. Lapping of each working procedure must be accepted by Party A's technical personnel or project manager before entering the next working procedure. After construction, peeling and hollowing shall be immediately and unconditionally reworked.
Six, the project price payment:
Party A shall pay Party B 70% of the progress payment of the completed project according to the monthly progress, and pay 95% of the contract amount within one month after the project is completed and accepted; The remaining 5% will be used as the quality deposit, and the project will be paid in one lump sum within one year from the date of acceptance, with no quality problems. (Note: Sporadic minor works are not covered by the warranty)
Seven. Obligations of both parties:
(1) Party A is responsible for:
1. Construction water and electricity are introduced to the construction site.
2. Responsible for on-site technical disclosure and quality tracking inspection, and timely point out the rectification of existing problems.
(II) Party B is responsible for:
1, according to Party A's quality requirements, construction period requirements and technical requirements.
2, according to the safety requirements of Party A, civilized construction. The expenses caused by man-made quality and safety accidents caused by Party B shall be borne by Party B, and Party A shall not be liable.
3. Obey the leadership and command of Party A and abide by the relevant rules and regulations of Party A. ..
Eight. Liability for breach of contract:
1. If it is not completed according to the construction progress of the project department, it will be fined 3‰ of the total contract price for each day of delay.
2. If Party B fights, steals or gambles in the venue, depending on the seriousness, one of them will be fined 50-200 yuan.
3. If Party B subcontracts the project to others without Party A's consent, Party A has the right to terminate the contract and pursue its civil liability. If the responsibility is caused by Party A, it shall be borne by Party A..
4. If Party A's finished products or semi-finished products are damaged due to Party B's artificial reasons, it will be fined according to the circumstances (100- 10000 yuan).
5. If Party A damages Party B's materials or finished products without reason, it shall compensate the price.
6. If the project fails to meet the acceptance criteria after completion, Party B must rework unconditionally and bear the rework losses.
Nine, safety responsibility:
1. Party B shall accept the supervision and inspection of Party A and the on-site safety inspector at any time, obey the arrangement of Party A's leadership, and take necessary safety protection measures to eliminate potential accidents.
2. Party B must set up a full-time security officer at the site to be responsible for the construction safety at the site, and no safety accidents may occur. In case of safety accidents caused by Party B's violation of safety operation regulations or his own paralysis and negligence, Party B shall be responsible.
X this contract is made in duplicate, one for each party. Matters not covered shall be settled by both parties through consultation. After the completion acceptance and liquidation, this contract shall become invalid.
Party A (seal): _ _ _ _ Party B (signature): _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Internal and external wall painting construction contract 5 Party A: _ _ _ _ _ _ _ _
Party B: _ _ _ _ _ _
According to the Contract Law of People's Republic of China (PRC) and relevant laws and regulations, Party B shall undertake the construction of paint for the interior wall and ceiling of BuildingNo.. Party A _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 1: Project Overview
1. Project name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
2. Scope of work: according to the requirements of Party A, responsible for the sample making, material supply, construction, acceptance and maintenance of interior wall coatings;
3. Contracting method: the contractor's material package is qualified;
4. Quality grade: Acceptance shall be conducted according to relevant specifications, and Party B promises that all projects will reach the qualified grade of national acceptance standards.
Article 2: Construction Period
This contract project is divided into two projects, the building _ _ _ _ _ _ _ _. The construction period of Party B shall not affect the overall progress of decoration construction. If the project cannot be completed within the contract period, Party B shall bear the liability for breach of contract. Party B shall submit the materials before May 30th, 20xx.
Article 3: Contract Price
Maximum comprehensive lump sum unit price _ _ _ _ _ _ _ (yuan/m2), remarks:
(1) The comprehensive lump sum unit price includes all expenses incurred by Party B, such as materials, labor, machinery and shelf use fees;
(2) Party B shall carry out the construction according to the construction drawing, calculate the engineering quantity according to the actual construction area, and settle the accounts according to the comprehensive lump sum unit price agreed in the contract.
Article 4: Method of Payment
1. Party A shall pay _ _ _ _ _% of the engineering quantity completed by Party B, and _ _ _ _ _ _ _ _% of the total contract price of the construction section after Party B completes the construction of the corresponding construction section and is accepted by Party A, and the remaining _ _ _ _ _ _ _ _ _ _ _ _% shall be paid in one lump sum after the acceptance of the project, and the project settlement shall be determined according to this contract.
Article 5: Project Quality
65438+
2. Party B must carry out the construction in strict accordance with the requirements of the model and national and local building engineering codes and standards, and accept the supervision of Party A's on-site representative. The quality standard is the same as that of Building 2. _ _ _ _ _ _. Party B shall purchase materials (not dry powder) that meet the standards stipulated by relevant countries as agreed. The purchased materials can only be used for construction after being checked and confirmed by Party A. If they do not meet the requirements, Party B shall be responsible for transporting them out of the construction site and purchasing them again. If the putty layer or paint layer has quality problems such as cracking, peeling, discoloration, flooding and sagging, Party B shall be responsible for repairing according to Party A's requirements until it is qualified.
Article 6: Work of both parties
1, Party A works; Party A shall provide the construction requirements related to this project and determine the color number. Provide water and electricity for Party B's construction; Materials can be left on site. Assist in coordinating the relationship between the main construction parties and the overall schedule of the project process. The on-site representative of Party A is responsible for supervising the project constructed by Party B, and Party A has the right to order the unqualified project (process) to be reworked or stopped, and the economic losses caused thereby shall be borne by Party B. ..
2. Work of Party B: During the construction process, Party B shall ensure safe production and civilized construction, and put an end to safety accidents. Party B shall bear all the responsibilities caused by the accident and the expenses arising therefrom. If the project quality does not meet the requirements of the contract, it shall be responsible for free repair or rework. Before the completed project is delivered to Party A, Party B shall be responsible for the finished product protection of the completed project, and if there is any damage during this period, Party B shall repair it. Party B's building materials shall be stacked in the area designated by Party A and constructed according to the requirements of the model room; Responsible for all kinds of horizontal and vertical transportation and shelf construction on site. Storage of materials.
Party A: _ _ _ _ _ _ Party B: _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
;