Shenshuo Group has several railway branches.
There are four branches. According to Shenshuo Group, Shenshuo Group is a subsidiary of Shenhua Group and has four branches. Shenmu-Shuozhou Railway starts from Daliuta, ends in the west of Shuozhou, is connected with Shen Yan Railway, and is connected with Beitongpu Railway, Huang Shuo Railway and Baoshen Railway. The main line is 266 kilometers long with a total investment of 2.3 billion yuan. It is a part of Huang Shen Line, the second great channel for transporting coal from west to east in China. It mainly undertakes the task of transporting coal from Shenfu Dongsheng Coalfield, with a designed transportation capacity of 35 million tons. In March, 2002, the construction of the double track started. After the completion of the whole line of the double track, the transportation capacity was1.400 million tons/year. In recent years, the transportation volume has been maintained at more than 200 million tons, and the 20 14 year plan will affect 300 million tons. Shenshuo Railway is the key construction project of China's eighth five-year plan.