The first bid section of Xubi Railway starts from Longfeng Town, xuyong county → leads from the vicinity of the existing Xu Na Railway Longfeng Town → enters Dahe Township, Xingwen County via Baila Township → returns to Baila Township, xuyong county from Qilin Township, Xingwen County → ends at Gao Feng Temple and enters the second bid section of Xubi. There are two intermediate stations in Xuyong North and Jin 'echi along the line, and two concession stations in Jingui and Caisangping. The line is expected to be completed and opened to traffic in 2022. The newly-built Xuyong-Bijie Railway (Sichuan-Yunnan section), with a total length of 1.5 1.8km, is a single-track passenger and freight railway with a design speed of 1.20km, which belongs to the last section of Longhuang Railway. The first bid section of the Syrian-Belgian railway is about 45 kilometers long with an investment of 65.438+65 billion yuan.