2. Environmental pollution process and control technology of endocrine disruptors in drinking water in Shanghai. Sponsored by Shanghai Science and Technology Commission in 2005 (05JC 14059), 2005+00-2007.09.
3. Occurrence characteristics of typical persistent toxic substances in strategic water sources in Shanghai. Supported by Shanghai Science and Technology Commission in 2005 (05DZ22330), 2005.12-2006.11.
4. Study on the evolution law of water environment and water quality improvement technology in Chongming Island. Sponsored by Shanghai Science and Technology Commission in 2006 (06DZ 12307), 2006.438+00-2007.438+02.
5. Construction of water environment laboratory of Chongming R&D base. Sponsored by Shanghai Science and Technology Commission in 2006 (06DZ22 109), 2006+08-2008.438+02.
6. Study on the release law and remediation technology of sediment pollutants along the South-to-North Water Transfer Project. Project of Shandong Provincial Environmental Protection Department, 2007.438+0-2008.05.
7. Study on water color anomaly of Chongming North Lake in spring. Consulting Project of Shanghai Tidal Flat Reclamation Company, April 2007-April 2007.438+02.
8. Research and demonstration on comprehensive regulation technology of typical canals in Chongming Island. Sponsored by Shanghai Science and Technology Commission in 2007 (07DZ 12052), 2007.4438+02-2009.4438+00.
9. Research on key technologies of water remediation of polluted source water in small towns —— research and development of aeration technology and equipment, supported by national science and technology in the 11th Five-Year Plan (2006baj00b0 1), 2008+0-205438+02.5438+02.
10. Demonstration scientific research project of phosphorus and nitrogen removal and upgrading technology in sewage treatment plant. Jiangsu Provincial Construction Department Project "Research on Constructed Wetland Treatment Technology" (08JSJ346), August 2008-August 2009+02.
1 1. Characteristic pollutant detection system and technical integration of major environmental pollution incidents. The second-level subproject is responsible for the National 863 Plan (2009AA06A4 17-0 1), 2008.10-201.06.
12. integration and demonstration of pollutant reduction and water quality improvement technology in Pingyao-Gan Yuan section of Tiaoxi River. Subproject of National Water Project (Lake Theme), (2008zx0710/-006), 2008.10-2012.
13. Water ecological evaluation and system construction of typical waters in Taihu Lake Basin. Chinese Head of Sino-Japanese International Cooperation Project (2008ZR0 1-002), April 20, 200914.03.
14. Research and demonstration of comprehensive river regulation technology in Yingdong village, Chongming. Sponsored by Shanghai Science and Technology Commission in 2009 (09DZ 1205 100), and 2009.06-20 12.06.
15. Study on the response mechanism of inland primary productivity and eutrophication threshold of Chongming Island under the action of Yangtze River passenger water and surface runoff. Responsible for the general project of Key Laboratory of Yangtze River Water Environment Education Department (YRWEY 1004), 2009+438+00-205438+02.438+02.
16. Study on low-carbon river construction technology and standard compilation. Responsible for subprojects, supported by Ministry of Science and Technology and Shanghai Science and Technology Commission, 2010 (2010bak69b16-1-3), 2010/2.65438+.
17. Study on harmless utilization of biogas residue and preparation technology of low-pollution organic fertilizer. Responsible for the international cooperation project of Shanghai Science and Technology Commission, 2011.12-2013.08.