According to the advantages and disadvantages, the final results or scores are given, and perhaps the evaluation opinions can be considered separately. As the name implies, judging opinions is to point out the advantages and disadvantages of the other party first, then give the final result or score according to the advantages and disadvantages, and finally give some guidance and suggestions to the other party as an expert.
The evaluation experts should be highly responsible and realistic, and make an appropriate and fair evaluation according to the actual level of the representatives and the declared professional and technical positions.
If the evaluation opinions in the process of bid evaluation can be led by the team leader, all the judges will discuss and write together. If the work evaluation of the bid evaluation experts is issued by the tenderer or an agency.
Model essay on the evaluation opinions of the expert group:
With regard to the expert evaluation opinions of Jinan Zhihua Consulting Co., Ltd. entrusted by Jinan Municipal Development and Reform Commission on the energy-saving evaluation report form of technical transformation project of watershed waterworks of xx Water Co., Ltd., according to the requirements of the State Council's Decision on Strengthening Energy-saving Work (Guo Fa [20xx] No.28) and Interim Measures for Energy-saving Evaluation and Review of Fixed Assets Investment Projects (No.6 in 20xx),
Experts in electrical, water supply and drainage, energy management and other aspects were organized to review the energy-saving evaluation report form of technical transformation project of Fenhe Waterworks of Jinan Quancheng Water Co., Ltd. (hereinafter referred to as "energy-saving evaluation report form") compiled by Jinan Municipal Engineering Design and Research Institute Co., Ltd.
In the spirit of being scientific, objective, fair and responsible, experts have carefully reviewed this energy-saving assessment report form and formed the following opinions:
I. Evaluation basis
1. It is forbidden to adopt the relevant planning outline of "xx".
2. Update outdated standards, such as GB50335-20xx Code for Design of Wastewater Reuse Engineering. Update the Code for Design of 3- 1 10kv High Voltage Distribution Equipment to the version of GB50060-20xx.
3. Delete the standards and specifications not covered in this report, such as the Feasibility Study Report of Fixed Assets Investment Projects and General Rules (Chapter) for Preliminary Design of Energy Conservation (Q/CNPC64-20xx).
Second, the project location energy supply conditions
The specific distribution station unit, the distance and orientation from the plant area should be defined, and its power supply capacity and existing load should be analyzed to explain whether the power supply conditions can meet the energy demand of the later operation of the project.
Three. Process flow and technical scheme
1. For the reconstruction and expansion project, the original process and technical scheme should be explained, but this section is mainly about the impact of the reconstruction and expansion process and technical scheme on energy consumption, and relevant contents should be added;
2. The height difference between the east and the west of the project site is large. The Energy Saving Report Form should supplement the plane and elevation layout of the original and new water purification facilities of the project, and analyze the measures and effects of how to reduce energy consumption by using natural height difference.
It also explains how to deal with the relationship between the original facilities and the new facilities, so as to achieve the requirements of energy saving and consumption reduction under the premise of maintaining normal operation as much as possible during the project construction period.
Four, the main energy-consuming technology, energy-consuming equipment, auxiliary production system:
1. Check the annual running time of the production process and improve the calculation process of annual power consumption of main electrical equipment.
2. Supplement the data of membrane water production, and compare it with the same industry to analyze its advanced nature.
3. For membrane filters with high power consumption, it is suggested to increase monitoring facilities to determine reasonable power consumption conditions.
4. The calculation and statistics of power consumption of the main pump are not perfect, and the missing equipment should be supplemented.
5, supplement the industrial added value and energy consumption index of 10 thousand yuan industrial added value, and compare with the relevant energy consumption indexes of provinces and cities.
6. Make clear whether the heating mode of the project is centralized heating or self-designed air conditioning heating, and calculate the actual annual power consumption of air conditioning operation.
7, supplementary water-saving measures, supplementary water reuse rate.
Verb (abbreviation of verb) Analysis and evaluation of energy-saving technical measures and management measures;
1. This project consumes a lot of energy, so an energy management system must be established.
2. Increase the configuration of energy metering devices such as energy statistics and monitoring in this project.
Other intransitive verbs:
1. Please supplement the report with the corresponding content "Total energy consumption indicators (energy consumption per unit product, energy consumption per main process, energy consumption per unit building area, energy consumption per unit output value or added value, etc.). ) According to the compilation requirements of "Energy Conservation Assessment Report Form" in Interim Measures for Energy Conservation Assessment and Review of Fixed Assets Investment Projects (Order No.6 of the National Development and Reform Commission).
2. In the analysis of energy efficiency index of the project, try to compare the energy consumption index of similar water plants in Shandong Province and Jinan City, and analyze the energy efficiency level of the project.
3. According to the improved and adjusted energy consumption, the report analyzes and evaluates the energy consumption of each unit of the project. The content of the energy-saving assessment report of this project is relatively complete, and the depth basically meets the requirements. After review, we passed the energy-saving review of Energy-saving Assessment Report of Technical Renovation Project of Watershed Waterworks by Jinan Quancheng Water Co., Ltd. in principle.
For the problems existing in the energy-saving assessment report, please report to the preparation unit and the construction unit for further revision and improvement according to the expert review opinions, and report to the review unit for re-review.