Management Innovation of Longyuan Electric Power Group Co., Ltd.

As the core platform of China Guodian Corporation's wind power development, Longyuan Power has started its third venture in an all-round way since 20 13, under the strong leadership of the new leadership team of China Guodian and in accordance with the overall deployment of the strategic system of "one goal, five articles and five Guodian", striving to build a profitable, managed and innovative enterprise.

Carry out world-class top-level design;

Since 20 14 years, Longyuan Electric Power has carried out the top-level design of the company in depth, and conducted a full investigation on the international first-class typical enterprises for 9 months, and extracted 7 major elements, 23 standards and118 indicators, formed 6 special reports, and formulated the management standard system for building a world-class new energy listed company.

Comprehensively deepen the reform of the assessment mechanism;

Longyuan Electric Power innovates the assessment mechanism, emphasizes the value creation orientation, strengthens the dynamic incentive and constraint of the process, and implements the cash management of monthly performance appraisal in the company headquarters and grass-roots units. 20 14, 1 1, longyuan power performance management case won the first prize of national power industry management innovation.

Innovative cooperative development model:

Longyuan Electric Power has strengthened cooperation with branches (subsidiaries) of Guodian and well-known local enterprises, and given full play to the advantages of each other's territorial location and Longyuan Electric Power professional platform. It has signed 33 cooperation projects in Shandong, Chongqing and other provinces1/kloc-0, with a total capacity of 2.87 million kilowatts, achieving win-win development.

Establish a new wind power transportation and detection system;

Longyuan Power took the lead in establishing a new patrol system for wind power operation, and compiled the Guide Manual for Standardization of Patrol Mode for Wind Farm Operation. According to the characteristics of wind farm scale, mode and environment, the patrol mode was scientifically designed, and standardized management of operation and maintenance was implemented in more than 200 wind farms in the company system. Standardize spare parts management, innovate and build a new spare parts management system with reasonable layout nationwide, and establish an integrated and information management system.

Promote regional centralized monitoring management mode;

The National Wind Power Operation Monitoring Center was built in Beijing headquarters to monitor every wind turbine generator set distributed by the company in all wind farms in China in real time, and at the same time, it was the first to promote the regional centralized monitoring management mode in nine provinces, which laid the foundation for realizing unattended and few people on duty in wind farms.

Build a multi-channel and low-cost financing platform at home and abroad;

Longyuan Power set up the domestic headquarters company of Xiong Ya Company in Shanghai Free Trade Zone to build a cross-border two-way fund pool, effectively open up domestic and foreign capital channels and further reduce the cost of capital. Improve the financing capacity in an all-round way, establish cooperative relations with more than 50 large financial institutions at home and abroad, and sign financial strategic cooperation agreements, totaling more than 200 billion yuan.