The main equipment of Phase I is:
1 and UG 130/9.8-M5 circulating fluidized bed boilers produced by Wuxi Boiler Factory;
2. C25-8.83/0.98 1- 1 25MW extraction steam turbine produced by Nanjing Turbine Motor (Group);
3. QFW-30-2A generator produced by Nanjing Turbine Electric Machine Factory;
The second phase project of Suzhou Susheng Thermal Power Co., Ltd. is a 2×260t/h circulating fluidized bed boiler and a 2×50MW steam turbine generator set. The supervision unit is Jiangsu Xingyuan Electric Power Construction Co., Ltd., the design unit is Jiangxi Electric Power Design Institute, and the construction is contracted by Jiangsu Suyuan Jiangnan Electric Power Industry Co., Ltd.
The main equipment of Phase II is:
1 and UG260/9.8-M2 high temperature and high pressure circulating fluidized bed boilers produced by Wuxi Boiler Factory;
C50-8.83/0.98 1-4 50MW extraction steam turbine produced by Nanjing Turbine Motor (Group);
2. QFW-60-2 generator produced by Nanjing Turbine Motor Factory.