Brief introduction: The total planned capacity of Jinzhou Thermal Power Project is 4×300MW coal-fired power generation and heating unit, which is constructed in two phases and located in Daqi Village, Yingpan Township, Taihe District, Jinzhou City. The first phase of the project (2×300MW) covers an area of 30. 1 1 hectare, and facilities for flue gas desulfurization, denitrification and sewage treatment are also built. It is a lignite heating unit, which has the characteristics of chimney-tower integration, desulfurization without bypass, suction fan and booster fan integration, and the water source is all reclaimed water. This project has been included in the "Eleventh Five-Year" energy and urban infrastructure construction projects in Liaoning Province and the overall planning of thermal power development in Jinzhou City. It has the advantages of energy saving, consumption reduction and high heating quality. At the same time, it can replace Jinzhou 1 15 high energy consumption decentralized small boilers. This project is not only a livelihood construction project, but also will improve the regional power grid structure, ensure the reliability of electricity consumption and the stability, safety and sufficiency of power supply, and meet the requirements of the 11th Five-Year Development Plan of Liaoning Electric Power Industry and Jinzhou Cogeneration Plan, which will play a positive supporting role in promoting the structural adjustment of Liaoning electric power industry and the development of energy conservation and emission reduction. At the beginning of 2005, the preliminary work of the project started. In April 2007, the compilation of the implementation plan of "smaller but bigger" was completed, and the replacement capacity was finally determined in mid-June, which became the first "smaller but bigger" project of Datang International Power Generation Co., Ltd. and the only project in China to implement inter-provincial capacity replacement. On June 6, 2008, the project was officially approved by the National Development and Reform Commission. On June 3rd, 2008, 165438+ 10, Liaoning Datang International Jinzhou Thermal Power Co., Ltd. was formally incorporated. Units # 1 and # 2 of the first phase project of Liaoning Datang International Jinzhou Thermal Power Co., Ltd. were officially handed over to production in April and May, 2009 respectively. At present, the two units have been put into production in strict accordance with the requirements of "putting into production, stabilizing and reaching the design value" stipulated by Datang International Power Generation Co., Ltd. Liaoning Datang International Jinzhou Thermal Power Co., Ltd., under the correct leadership of China Datang Group Corporation, Datang International Power Generation Co., Ltd. and Datang Liaoning Branch, fully implemented the strategy of Datang International Power Generation Co., Ltd. to focus on electricity and cooperate in many ways, and built a resource-saving and environment-friendly thermal power plant in an all-round way, and achieved remarkable results in establishing Datang brand in Liaoning Province!
Legal Representative: Guo.
Established: 2008-11-13.
Registered capital: RMB 368 million.
Industrial and commercial registration number: 2 10700004054878
Type of enterprise: limited liability company (wholly owned by a legal person invested or controlled by a natural person)
Company address: No.41,Section 4, Ma Jiali, Taihe District, Jinzhou.