How about Rizhao Lanqiao Port Co., Ltd.?
Not bad! ! Lanqiao Group established Rizhao Lanqiao Port Co., Ltd. in the first half of 2005 to invest in the construction of Lanqiao Port and build the strategic development layout of port logistics industry. Lanqiao Port is located in the northern shore of Haizhou Bay in the Yellow Sea and the southernmost part of Shandong coast. Its geological and natural conditions are the most rare and good place to build a deep-water port. Waterway, highway and railway traffic extend in all directions. According to the master plan of Rizhao Port approved by the State Council, Lanqiao Port Area will be built into a comprehensive deep-water port area for bulk cargo transportation such as crude oil, refined oil, liquid chemicals and ores. The planned annual throughput is 200 million tons. The port area is planned as three operation areas, namely, liquid chemicals operation area, central operation area and deep-water berth operation area. There are 0/9 planned berths/kloc, among which 7 berths of 5000-50000 tons will be built in the liquid chemical operation area; Construction of 7 berths for 50,000-654.38+500,000 tons of refined oil and crude oil in the central operation area; Five general cargo and bulk cargo berths of 654.38+10,000 tons to 300,000 tons will be built in the deepwater berth operation area. Backfilling in the sea area can form the foundation of liquid chemicals storage and transportation tank farm with an area of 4,000 mu and a storage and transportation capacity of more than 6 million m3. The total investment of the project is tens of billions of yuan, and the accumulated investment is 3.8 billion yuan. At present, 1# and 2# liquid chemical berths have been put into trial operation on June 30, 2009; Other berths have made rapid progress, among which 3# and 4# liquid bulk berths (with a construction scale of 2 50,000 tons) have been approved by the Provincial Development and Reform Commission, and construction started in the first half of this year; The preliminary work of 1# and 2# general berths (with construction scales of 70,000 tons and 65,438+10,000 tons respectively) has been basically completed. Construction is expected to start in the first half of this year and the main berth will be completed before the end of the year. The main body of the 200,000-ton bulk cargo berth has been completed, and six 40-ton gantry cranes have been installed. It is expected to have a simple production capacity by the end of this year, with an annual throughput of100000 tons. The 300,000-ton ore berth (designed to berth a 400,000-ton bulk carrier) is undergoing foundation trench excavation, caisson prefabrication and installation, and it is expected to have a simple production capacity and a throughput capacity of 20 million tons by the end of next year. With the rapid development of hinterland economy, the demand of port logistics market is also growing rapidly. After Lanqiao Port is put into production, the huge market demand will provide a broad development space for the port logistics industry of Lanqiao Group.