Second, the main construction content and technical standards
(1) Main construction contents. The line leads from Yangquan North Station of the existing Shitaike Special Railway Station, passes south through Yuxian County, suburb and Pingding County of Yangquan City, and reaches Dazhai, Xiyang County, Jinzhong City. The main line is 79.026 kilometers long and has 9 stations. This project is realized in two ways: building new railways and using existing railways. Among them, the new line is led out from the existing Yangquan North Station of Shitai Passenger Dedicated Line, passing south through Yuxian, Suburb and Pingding County of Yangquan City, and the new line from Yangquan North (inclusive) to Yangquan East (inclusive) is 4 1.98 km long, with 6 stations, namely Yangquan North Station, Yuxian East Station, Hedi Station, Suburb Station and Yangjiazhuang Station. From Pingding to Xiyang Dazhai, the existing Yangshan Railway was used for electrochemical transformation to increase the passenger transport function. Yangshan Railway is 35. 1 14 km, with three stations, namely Pingding Station, Ning love stand Station and Xiyang Dazhai Station. Related projects include: Baiyinyang tie line 2.522km, Yangquan East bus line 0.923km, Yangquan East truck line 0.963km and Yangquan North bus line 3.625km.. ..
(2) Main technical standards. Railway grade: National Railway Class I, mixed passenger and freight transportation. Number of main lines: single line. Minimum curve radius: 800 meters in general and 400 meters in difficulty. Restricted gradient: uphill 13.5‰, downhill 15‰. Passenger design speed: 120km/h traction type: electric power. Type of locomotive: cargo SS4 (twin-engine), passenger EMU. Freight traction quality: 5000 tons. Effective length of arrival-departure line: 1050m, double machine 1080m. Block type: block between automatic stations from Yangquan North to Yangquan East, and block between related tie lines. Train control mode: the main line from Yangquan North to Yangquan East adopts CTCS-0.