Fenghe Ecological Scenic Area Management Project

The comprehensive regulation project of Fenghe River (Xi 'an section) starts from G3 10 national highway in the south, reaches Yanjiaqu rubber dam in the north, reaches the backwater side of the left bank flood control dike in the west, and reaches Fenghe East Road (Planning Road) in the east. The total planned construction area is about 8506 mu (including river water area 1, 39 1 mu), and the land is in a north-south strip layout, with a length of about 6.8 kilometers from north to south. The project started construction in March 20165438+and is expected to be completed by the end of October 20 14. Under the unified command and leadership of Fengdong New Town Management Committee, Xi Anfengdong Development Group Co., Ltd. and Fengdong New Town Urban Construction and Development Co., Ltd., the project agent, joined hands with China Water Resources and Hydropower Construction Co., Ltd., the project investor, and with the strong assistance of Fengdong City Reconstruction Office, Doumen Sub-district Office and Gao Qiao Sub-district Office, they overcame many difficulties and worked hard to realize the long-term plan of comprehensive management of Fenghe River.

The comprehensive management project of Fenghe River (Xi 'an section) mainly includes the following projects: building new flood levees 13.3km on the left and right banks to raise the flood control standard of the river to once in a hundred years; The new rubber dam located in Yanjiaqu will form a waterscape with a length of 6.5 kilometers and a width of 80-240 meters in the upstream; Build a new waterfront landscape belt along the river to improve the living environment on both sides of the Fenghe River and enhance the quality of life; New wetland parks and social squares will be built to provide residents with places to rest, exercise and understand.

The planning and construction of the comprehensive regulation project of Fenghe River (Xi 'an section) has created a new bright spot of the comprehensive regulation project of Fenghe River: through the topographic design on both sides of the river, the flood dike and the greenway system are integrated; By setting a lock to connect the upstream and downstream water surfaces, it is convenient for navigation in the future and experience the southern customs; Through landscape greening, the business district, cultural and sports center, ecological green space and other supporting facilities will be organically integrated; Advocate low-carbon environmental protection by using new technologies such as wetland system, permeable road and spray cooling; By introducing traditional elements such as Zhou and Qin culture into the design of lamps and chairs, the long history of Fenghe River is inherited.