In today's developing world, there are more and more types of contracts, which is also the link to realize professional cooperation. Do you know what the main contents of the contract are? The following is a simple contract template (5 commonly used) I collected for you in 202 1 year. Welcome to read, and I hope you will like it.
Labor Contract 1 Party A: (hereinafter referred to as Party A) _ _ _ _ _ _ _ _
Party B: (hereinafter referred to as Party B) _ _ _ _ _ _ _
For the project undertaken by Party A, Party A and Party B are willing to sign a plastering project contract agreement due to work needs. Based on the principle of fairness and mutual benefit, both parties agree on the following terms for their compliance.
First, the scope and content of contracted projects.
The materials required for this project are transported horizontally and vertically at the site, and the materials are tiled, bricked, plastered, bricklaid, hung, hung straight, pre-embedded pipeline slots are reserved for coordination, installation and joint repair. Wall cleaning, floor ash treatment, slag transportation, backstage loading and sand screening, stone cleaning and weighing, cement bag recycling, backstage and yard cleaning. Installation and disassembly of simple operating frame and material handling runway. Concrete walls, beams, columns, etc. Self-propelled ladder shall be used for punching holes, with the thickness of 1.5cm and the width of 0.5m2, and the pull-tab shall be treated.
1. Plastering: cleaning, repairing, wetting the base, blocking the wall hole, hanging the net, concrete wall column, slurry throwing, kitchen and bathroom, secondary plastering, repairing, installing the trunking, dispatching the mortar, cleaning the ground dust, plastering and leveling in layers, watering and wetting, and trimming.
2. Tiling the external wall: cleaning the working face, throwing slurry, scraping rough dust, leveling and plastering; Clean up the working face, throw slurry, scrape rough dust, level and plaster, stick bricks, tick off joints, and clean up the working face to meet the completion conditions.
3. External wall calendering and plastering: cleaning the working face, throwing slurry, scraping rough ash, leveling and plastering, calendering and closing the face, and cleaning the working face.
2. Project progress requirements: Organize the construction according to the construction tasks and plans issued by the owner.
Third, the project quality requirements: to ensure the accuracy of the height and width of the hole. The thickness of plastering shall be implemented according to the specifications to ensure the visual quality of plastering. The concrete with plastering thickness less than 15ram bulge shall be stepped by itself, strictly in accordance with relevant national codes, and inspected and accepted according to the inspection standards of subdivisional works.
Four. Party B shall provide tools such as hopper car, ash basin, ash bucket, guiding rule, driving rod, fixture, wide wire, impact drill, drainage pipe, safety belt, safety helmet, broom, shovel and qualified safety and labor protection articles.
5. Contract unit price: All expenses within the scope of the project contracted by Party B are composed of base price, quality, safety, construction period and civilized construction unit price. The comprehensive unit price of indoor plastering is calculated as _ _ _ _ _ yuan/square meter according to the figure, the comprehensive unit price of external wall plastering is calculated as _ _ _ _ _ _ yuan/square meter according to the figure, and the comprehensive unit price of external wall calendering plastering is calculated as _ _ _ _ _ _ yuan/square meter according to the figure. (The above three items all include the quality unit price of _ _ _ _ _ Yuan/m2; Civilized construction unit price _ _ _ _ _ yuan/m2; Time limit for a project progress unit price _ _ _ _ _ yuan/m2; Safety unit price _ _ _ _ _ Yuan/m2)
Terms of payment for intransitive verbs
Party B shall pay 80% of the completed amount in advance before the Spring Festival, 70% every month thereafter, and the balance shall be paid after half a year of project completion. Before this, Party B can borrow food stamps from Party A's canteen and deduct them from the amount received, and the remaining 20% will be used as the project security deposit to ensure the project quality, safety, construction period, civilized construction, labor security and rational use of mechanical materials. After the deposit and other projects are delivered to the construction unit for use, Party A will pay the balance to Party B at one time within half a year, and the wages of Party B's workers will be paid by Party B itself, which has nothing to do with Party A. ..
Seven. Responsibilities of Party A and Party B
(I) Party A's responsibilities
1. Provide living facilities: dormitory, canteen, water and electricity lighting.
2. Jacquard equipment and materials: mixer and gantry crane.
3. Provide on-site foreman to manage Party A's on-site foreman, conduct technical disclosure and safety technical disclosure according to the progress of the project, and be responsible for the coordination between various types of work; Acceptance of engineering quality.
4. Requirements of quality, safety, progress and civilized construction: Technical disclosure and quality control shall be carried out in strict accordance with excellent engineering standards, construction shall be organized and construction progress shall be checked in strict accordance with the agreed time limit, and admission and on-site supervision and management shall be organized in strict accordance with safety management regulations and civilized construction 12 standards. If Party B fails to meet Party A's time limit and quality requirements, Party A has the right to terminate the contract and ask Party B to leave unconditionally.
(II) Party B's responsibilities
1. Submit the construction quality, safety, progress, civilized construction and public security and fire control guarantee of the contracted project to Party A..
2. The construction quality must meet the excellent standards required by the quality supervision station, supervision unit and construction unit. Do a good job in the protection of finished products.
3. Construction safety guarantee: strictly implement the construction specifications to ensure that safety accidents do not occur. In case of a safety accident, the team shall bear the expenses below xx yuan, and the responsibilities above xx yuan shall be clear and settled through negotiation. All personnel entering Party B's site must wear qualified safety helmets and safety belts according to Party A's requirements. Admission personnel who don't wear safety helmet 1 time will be fined xx yuan, and those who don't wear safety belt 1 time will be fined xx yuan. It was found that fines were strictly enforced in the form of turnover for many times.
4. Civilized construction: This project is a standardized project, and it is not allowed to urinate in the floor. If found once, this person will be fined xx yuan. After the floor is completed, the floor will be cleaned immediately and the remaining materials will be transported. Stacking should be carried out according to the specifications, and the civilized construction management regulations of the project department should be strictly implemented. It should be cleaned during construction and must be cleaned after work. The floor is often kept free of residual mortar. Otherwise, Party A will send someone to collect it at home, and Party B will pay the labor fee, and Party A will punish it according to its situation.
5. Public security and fire protection: no public security and fire accidents will occur. Abide by the laws and regulations of the construction site. No fighting. If there are any violators, both sides of the fight will be punished by xx yuan first, and then handed over to the project department for settlement. It is forbidden to gamble uncivilized, and it is forbidden to steal. If there is any violation, in addition to deducting a fine of xx yuan from the settlement list, it will also be expelled from the construction site, and serious cases will be investigated for criminal responsibility.
6. Use of machinery and equipment: The machinery and equipment provided by Party A shall be used with care, and it is forbidden to damage the machinery and equipment. Violators will be fined according to the value of 1-2 times.
7. Material saving: This project belongs to the cross operation of internal and external walls. Every day, there is a special person to collect ground ash, which must be used x times. The floor was dusty all night, and there was no leftover material. Strengthen material saving, limit the use of materials in the construction process, and put an end to material costs and excessive consumption. If excessive consumption occurs, a fine of 1-5 times will be imposed.
8. Party B has the responsibility to review Party A's construction plan, construction procedures and technical disclosure, and has the obligation to put forward reasonable suggestions on the imperfections and irrationalities in Party A's construction plan, construction procedures and technical disclosure, and strictly implement them after being approved by Party A..
9. Labor force guarantee: the labor force necessary to ensure the progress of the project, especially in the busy farming season. If Party A is unable to complete the delivered work due to insufficient labor force, Party B must bear all the responsibilities, except that the work expenses are collected by the third party, and bear the economic compensation. The remuneration will be calculated at 20% of the cost required for the work. If the circumstances are serious, Party A has the right to order Party B to leave the site and deduct Party B's deposit in Party A. ..
10. Handling the employment permit and temporary residence permit for foreigners shall be handled uniformly by Party A according to the regulations. Admission personnel must bring their ID cards, and it is strictly forbidden to use them without ID cards.
1 1. The luggage and boxes of the personnel leaving Party B shall be handed over to the doorman for inspection.
12, when entering the site, Party B's personnel must be familiar with the ten musts, ten prohibitions and twelve civilized constructions on the construction site.
Eight. If there are any matters not covered in this agreement, both parties shall settle them through friendly negotiation based on the principle of seeking truth from facts. Other matters not covered shall be implemented in accordance with the company's management measures.
Nine. This agreement shall come into force as of the date of signature by both parties, and shall automatically expire on the date when all the money is paid after the project is completed.
Party A (official seal): _ _ _ _ _ _
Party B (official seal): _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Simple labor contract. Agreement unit:
Party A (company name):
Address:
Party B (company name):
Address:
In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and relevant laws and regulations, and in combination with the specific conditions of this project, the following agreement is reached on the labor contract of this pavement concrete face carving project through full consultation between both parties:
Article 1: project name and scope
Project name:
Scope of work:
Article 2: Construction Period
Article 3: Unit Price of Engineering Services
Bill of quantities and unit price table
Contract terms: Currency unit: RMB.
project name
unit
amount
Unit price (RMB/m2)
Total amount (yuan)
Article 4: Project Quality
4. 1 Organize the construction in strict accordance with the current national highway construction specifications and the construction design drawings and supplementary technical specifications of this project.
4.2 In the process of construction, abide by the relevant regulations of the construction unit, accept the supervision and guidance of the supervision engineer, and ensure the engineering quality meets the design requirements.
Article 5: Project Acceptance and Measurement
5. 1 Measure the engineering quantity once a month, and measure it on the premise of qualified quality. The quantities shall be measured on site and signed by the resident supervision engineer and the headquarters at all levels.
5.2 Unqualified projects will not be accepted, and labor costs will not be paid. Party B must rework within the time limit specified by Party A, and the expenses shall be borne by Party B. ..
Article 6: Project progress
6. 1 party b must complete the corresponding engineering quantity according to the time required by the construction unit and party a. ..
6.2 If it is necessary to extend the construction period or change the schedule due to design changes, the consent of Party A's representative must be obtained and approved.
6.3 In the process of construction, if the engineering quantity cannot be completed on schedule for other reasons, it must be reported to the representative of Party A for approval to extend the construction period.
Article 7: Engineering Materials
All machinery, tools and materials used in this project are provided by Party B, but they must be inspected by Party A and the supervision engineer and meet the engineering requirements.
Article 8: Payment of Price
Party A shall pay Party B 90% of the completed works; The remaining 10 shall be used as quality deposit, which shall be paid by Party A in one lump sum after the project acceptance.
Article 9: Responsibilities of both parties
1, Party A's responsibility
1. 1 is responsible for reporting to the construction unit and relevant government departments about the project construction, handling and coordinating various matters in the project construction, and paying close attention to the construction progress of each construction unit so as to inform Party B to enter the site in time.
1.2 Be responsible for the technical management and guidance of the whole project, prepare the construction organization plan, implement the management objectives of the construction unit, report the actual number of projects completed by Party B and the engineering change data, and keep the engineering drawings and related technical data.
1.3 Provide Party B with necessary construction drawings and technical specifications, and make technical disclosure.
1.4 Each working procedure in the construction shall be inspected regularly or irregularly.
1.5 is responsible for the intermediate pricing on a monthly basis, reporting the pricing list, pricing the single project once it is completed, and paying the project payment to Party B as agreed by both parties.
2. Party B's responsibilities
2. 1 Responsible for organizing the mobilization of equipment and personnel suitable for the construction of this project, and the expenses for mobilization, evacuation and mobilization of construction machinery shall be borne by itself.
2.2 Go through various formalities with the local government and relevant departments in time, abide by the labor law and other laws and regulations, respect national customs and habits, and bear the civil liability caused to others by the fault of its employees.
2.3 Carefully organize the construction in strict accordance with Party A's requirements, accept the supervision, guidance and inspection of the resident supervision engineer, Party A's technicians and site management personnel, and be responsible for all safety work.
2.4 In the process of construction, Party B shall ensure the quality and continuity of each working procedure and complete the construction of each working procedure within the stipulated allowable time; otherwise, it shall compensate Party A according to the actual loss.
2.5 Party B shall not subcontract, subcontract or transfer the project to a third party. All civil liabilities arising from subcontracting, subcontracting or transferring the project shall be borne by Party B, and Party A has the right to terminate this contract.
2.6 Party B shall ensure that the operators of special jobs have corresponding qualification certificates or operation certificates.
Article 10: Agreed matters
10. 1 The project contracting method adopts the "unit price contract system", and the unit price includes all the work procedures and expenses needed to complete the project.
10.2 When Party B's project schedule lags behind and affects Party A's overall construction period, Party A has the right to divide the project or even terminate the contract, and all losses caused thereby shall be borne by Party B..
Article 1 1: Disputes and breach of contract
1 1. 1 Any dispute arising from this contract shall be settled through negotiation. If negotiation fails, a lawsuit may be brought to a people's court with jurisdiction.
1 1.2 If it fails to perform its obligations as agreed in the contract, it shall bear the liability for breach of contract, and the defaulting party shall pay the other party the liquidated damages of 10 for the project payment and compensate the other party for the losses caused by breach of contract.
Article 12: Other
12.65438+
12.2 damage to party b's equipment and machinery and shutdown losses caused by force majeure shall be borne by party b. ..
12.3 Party B must insure the life, property and mechanical equipment of its personnel on the construction site. If it fails to be completed on time, Party B shall bear the expenses arising from the accident.
12.4 Party B has the obligation to keep Party A's business secrets, and shall not disclose the project labor price to a third party. Party B shall bear all losses caused to Party A due to the disclosure of business secrets.
Article 13: This contract shall come into force as of the date of signature by both parties.
Article 14: This contract is made in duplicate, each party holds one copy, which has the same legal effect.
Party A: Authorized Agent:
Legal representative:
Party A: Authorized Agent:
Legal representative:
Date of contract signing:
Simple Labor Contract 3 Party A:
Party B: Gender:
ID number:
History:
Form of employment: employment.
Party A employs Party B as an employee of hancheng city Ruixiang Construction Labor Service Engineering Co., Ltd. due to the needs of engineering production and work. According to the relevant labor laws and policies of the state, the Contract is concluded by both parties through negotiation:
1. Party A employs Party B as the information officer (post) of this project; The term of the labor contract is three years, from August 1 day of 20xx to July 3 1 day of 20xx (that is, until the project is completed and accepted).
Second, the basic rights and obligations:
(1) Party A:
1. Manage Party B according to the production (work) needs, the rules and regulations of the unit and the provisions of this contract;
2. In order to protect the legitimate rights and interests of Party B, Party B shall be paid wages, bonuses, allowances, insurance benefits and other policy subsidies according to relevant regulations;
3. Do a good job in safety education before Party B takes up his post, and provide working conditions that meet the safety and health requirements;
4. Reward and punish Party B according to relevant national regulations.
(2) Party B:
1. Workers under the labor contract system enjoy the rights, obligations and various treatments of the regular employees of the unit.
2. Abide by national policies and laws, and abide by the rules, regulations and disciplines formulated by Party A according to law;
3. Strictly abide by the operating rules to ensure safety in production;
4. Complete the production (work) tasks and economic indicators assigned by Party A. ..
III. Both parties shall specify specific matters:
1.2. Labor insurance and welfare benefits:
3 according to the characteristics of the unemployment agreement, the labor contract deposit and personal insurance:
4. Others: According to the IOU, Party A will settle all wages for Party B at the end of the year.
Four. After the Contract comes into effect, Party A and Party B shall not terminate the Contract in advance without justifiable reasons. Either party must notify the other party to terminate the contract 7 days in advance and go through the relevant formalities.
5. If one party violates this contract and causes economic losses to the other party, the breaching party shall be responsible for compensating the losses according to the size of the responsibility.
Party A (signature): Party B (signature):
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Simple Labor Contract 4 Party A:
Party B: ID number:
Party A and Party B have reached the following agreement on labor employment, which is convenient for both parties to abide by and implement:
1. Labor location: Party A has a park, and Party B is engaged in temporary work in the park.
Two. Content and mode of labor service: determine the time and content of labor service according to Party A's business needs.
Three. Duration of labor service: determined according to Party A's operating conditions, but both parties may notify the other party to terminate the labor service contract three days in advance.
Four. Settlement of labor remuneration: Party B shall pay RMB yuan per day.
Verb (abbreviation of verb) settlement method: according to Party A's assessment and Party B's working days, it shall be paid before the 20th of each month.
6. During the labor service period, Party A shall handle the employer liability insurance for Party B in China Life Insurance Company, and the insurance premium shall be paid by Party A. If Party B suffers economic losses due to accidental injuries during the employment period, both parties agree that the insurance premium settled by the insurance company shall offset the compensation liability (including compensation liability for work-related injuries) that Party A should bear.
7. Party B shall engage in employment activities in strict accordance with the rules and regulations and work requirements of Party A's unit. In case of disobedience to management, Party A may terminate the labor contract at any time and deduct 5- 10 days' remuneration according to Party B's performance.
Eight. Party B shall ensure good health and no diseases or family genetic history factors that affect its normal work. In case of accidental illness or injury during work due to the above reasons of Party B, Party B voluntarily assumes all responsibilities and agrees that Party A will not assume any responsibilities.
Nine. This contract is made in duplicate and shall come into effect after being signed and sealed by both parties.
Party A (seal): _ _ _ _ _ _ _ _ _ _ Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Representative (signature): _ _ _ _ _ _ _ _ _ ID number: _ _ _ _ _ _ _ _ _ _ _ _ ID number: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Simple Labor Contract 5 Party A (Employer): _ _ _ _ _ _ _ _ _ _ _ _
Party B (contractor): _ _ _ _ _ _ _ _ _ _ _ _
According to People's Republic of China (PRC) Contract Law, People's Republic of China (PRC) Construction Law, People's Republic of China (PRC) Labor Law, People's Republic of China (PRC) Construction Project Management Regulations and Construction Project Management Regulations, Party A will _ _ _ _ _ _
1, contract scope
(1) Pouring and curing of all concrete in this project (including indoor waterproof protective layer and basement waterproof leveling layer).
(2) Party B shall take over and dismantle the pipeline.
(3) Party B is responsible for all brick molds of this project.
2. Quality
(1) According to the current building and acceptance standards, the qualified rate of inspection quality is required to reach _ _ _ _%.
(2) In the construction process of this project, if it is not due to Party A, all the fines for "quality problems and progress problems" caused by Party B in the operation process shall be borne by Party B. ..
(3), all construction sites must be civilized construction. The team leader of Party B shall obey the arrangement and command of Party A's management personnel and the company. The management of Party A has the right to impose a fine of _ _ _ _ _ _ _ _ _ yuan on Party B who fails to comply with the arrangement, and the team or individual will be removed from the field if the circumstances are serious.
3. Unit price and payment method
(1), concrete pouring and maintenance * * * _ _ _ _ _ Yuan /m2 (no repeated pricing). Off-floor pickup boards are not priced. The final settlement should be based on the quota of _ _ _ _.
(2), brick tire mold unit price is _ _ _ _ yuan/cubic meter. Including plastering.
(3), after the completion of the basement+/-zero pouring, pay _ _ _% of the completed project to the top of the second floor. After the completion acceptance, the final accounts for completion shall be paid to _ _ _ _% of the total project payment, before payment. For other low-rise commercial and residential buildings with more than two floors, the unit price of more than two floors shall be calculated and settled at _ _ _ _ yuan per square meter. The balance of _ _ _% of the project payment shall be paid by Nike Power Shift Room.
(4) Party B shall not make other demands on Party A alone.
(5) Party B fully understands the contract conditions between Party A and the construction unit, and Party A will not pay any fees during the construction.
Note: Before the construction unit pays, all labor costs shall be borne by Party B, and Party B shall ensure that all the workers of the team are paid monthly. If the wages of workers are not paid in full on a monthly basis, there will be riots, damage and bear all losses caused thereby, and all losses will be deducted from the project payment.
4. Payment method of service fee
Every time Party B collects the service fee, it shall report the salary table to Party A according to the names of the workers in the team, the working days of the workers and the daily wage standard, and actually pay the salary. Party A will take the salary table provided by Party B as one of the bases for paying wages to Party B. ..
Step 5 manage
(1). Party B shall provide a list of migrant workers to Party A within two days after entering the site. The roster shall truthfully register the name, age, type of work, home address and ID number of the laborer, and attach a copy of the ID card. When workers leave or increase, Party B shall report to Party A for cancellation or increase of registration. When collecting service fees, the personnel listed in the attached payroll are consistent with the roster of migrant workers. In case of inconsistency, Party A has the right not to pay the wages of unqualified personnel, and Party B shall be responsible for social security issues.
(2) Personnel organization and management: Strictly employ old, weak, sick and disabled migrant workers. Slippers and non-slip shoes are prohibited from entering the construction site. It is forbidden to employ child labor in all kinds of work of construction site management. It is forbidden to take in fugitives and outsiders for the night. If all the accidents and expenses arising therefrom are borne by Party B, the punishment of law enforcement departments and other relevant departments shall also be borne by Party B. ..
(3) Party B's operators must consciously abide by Party A's rules and regulations, obey the command of Party A's management personnel, cooperate with the competent authorities in the inspection and acceptance of the construction site, and obey Party A's arrangement ... Party B's workers must wear safety helmets when entering the construction site and use safety protection articles correctly. If it is not used correctly, Party A has the right to impose a fine of RMB/time on Party B according to the seriousness of the case. In case of safety accident, Party B shall bear all responsibilities.
(4) Party B fully understands the engineering drawings, comprehensively analyzes the management measures of the supervision unit, and strictly implements them, and is responsible for all the concrete pouring work of this project and completes it on time.
(5) Party B must comply with the requirements of the project department's construction schedule, and all fines caused by the delay shall be borne by Party B. If Party A fails to keep up with the schedule, Party A has the right to ask Party B to leave, and all consequences shall be borne by Party B. ..
(6) In case of a major fight on the construction site, the personnel on duty will be fined RMB per person, and the punishment will be doubled in case of a major accident.
(7) Party B's operators must abide by Party A's regulations on safety management on the construction site. In case of violation, Party A has the right to punish Party B. ..
(8) Party B shall clean up the site after work every time and reach the civilized construction standard. Party B must clean up all materials and machinery every time, so that the materials and machinery are neatly stacked and the site is not messy. Otherwise, Party A has the right to impose a fine of RMB/time on Party B. ..
(9) Party B must organize the construction according to the requirements and standards of the design and relevant specifications. If Party B's construction quality fails to meet the agreed standards, Party B must unconditionally rework until it reaches the agreed quality standards, and bear the material losses caused by rework, and at the same time bear the liquidated damages of _ _% of the completed project cost.
(10), Party B must ensure that there is enough labor force for normal construction (Party A requires Party B's equipment and workers according to the progress of the project, and Party B must organize its own equipment and personnel to arrive within _ _ _ hours after the number required by Party A). If Party B's equipment and personnel can't meet the production needs, Party A has the right to arrange other institutions for settlement after completion, and Party B promises to pay the completed work to Party A as compensation.
(1 1). All safety accidents caused by Party B's violation of safety operation regulations shall be borne by Party B. ..
(12), every time concrete is poured, concrete cannot overflow at the site. If one place is found, Party A has the right to impose a fine of RMB on Party B according to the seriousness of the case.
6. This agreement is made in triplicate, with Party A and Party B and labor management personnel holding one copy respectively.
7. This contract has the same legal effect, and shall come into force after being signed by the legal representatives or entrusted agents of both parties, and automatically become invalid after the obligations of both parties are fulfilled.
Party A (seal): _ _ _ _ _ Party B (seal): _ _ _ _ _ _
Representative (signature): _ _ _ _ Representative (signature): _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
;