Huisheng Energy's Huisheng Energy Project

The first phase of the clean coal joint plant built by Huisheng Energy in Nanjing Chemical Industrial Park was put into commercial operation in April 2007, with a daily processing capacity of 1.7 million tons. Carbon monoxide 300,000 tons/year; Methanol 200,000 tons/year; In 2009, the operating rate reached 98%; Sulfide emissions are almost zero.

The second phase of the project was successfully put into operation in September 2009, with a daily processing capacity of 1.7 million tons of coal; Carbon monoxide 300,000 tons/year; Hydrogen 21000 nm3/h; /h; Syngas11000 nm3/h; 654.38 million tons/year of methanol; The actual operating rate of 20 10 is 99.5%; Sulfide emissions are almost zero.

After just two years' development, Huisheng Energy Clean Coal Device, as the leader, has jointly developed a number of high value-added industrial chains with downstream customers of Nanjing Chemical Industry Park, and Huisheng Energy Clean Coal Device has become a model for implementing "circular economy".

20 1 1 year, Huisheng Energy has started three projects, including: 300,000 tons/year MTO capacity expansion project, new coal gasification demonstration project in cooperation with Shell, 250,000 tons/year butyl octanol project and 35,000 tons/year coal hydrogen production project; It is expected to be put into production on 20 13.