The first set of monitoring system is used for foundation pit monitoring.

Nanfang Daily 20 13-4-3 (reporter/Liu Huaiyu correspondent/Liu Xiangyu, Cheng Xiangwei) 20 13, 1 At the end of the year, the subway project of Kang Wang South Road in Guangzhou suddenly collapsed. In order to avoid similar accidents, recently, the underground engineering and deep foundation pit safety monitoring information management system developed by the Municipal Construction Committee was successfully put into trial operation. Once the project shows signs of potential safety hazards, the system can automatically alarm in real time. According to reports, the system is the first in China.

In recent years, collapse accidents caused by underground engineering or deep foundation pit excavation have occurred frequently in Guangdong Province and Guangzhou City. On June 28th this year, at 65438, the junction of Kang Wang South Road and Shanmulin Road near Cultural Park Station of Metro Line 6 suddenly collapsed, but fortunately no casualties were caused. On March 26th this year, the Jingzhou Building in Futian, Shenzhen collapsed and a security guard died. Many settlement accidents also occurred in Huizhou section of Guan Hui intercity railway.

The relevant person in charge of the Municipal Construction Committee said that in order to strengthen the safety monitoring of underground engineering and deep foundation pit in Guangzhou, realize the dynamic management of underground engineering and deep foundation pit monitoring in the whole city, and ensure the safety of engineering construction, the Municipal Construction Committee organized and developed the "Underground Engineering and Deep Foundation Pit Safety Monitoring Information Management System", which was designed and developed by Guangzhou Construction Engineering Quality and Safety Testing Center and developed by Guangzhou Jian Yue Sanhe Software Co., Ltd..

According to reports, the system can realize automatic collection and real-time transmission of monitoring data and establish an information management platform. Through data analysis, various curves and graphs are formed to make the monitoring results "visual". Because the system realizes the automatic acquisition of test data and the real-time transmission function by using wireless transmission technology or network transmission mode, the interference of human factors on monitoring data is reduced. At present, the system is the first in China.

According to the reporter, after more than a month of intense work, the management system has started trial operation. At present, the system has been put into trial operation in many key projects such as Datansha Station, Zhoutouzui Tunnel and the inpatient building of Tianhe Red Cross Hospital of Guangzhou Metro Line 6. "After the pilot is mature, this system will be promoted in the whole city," said the relevant person in charge of the Municipal Construction Committee.