According to the spirit of huadian power international's Notice on Carrying out 20XX Autumn Safety Inspection and the requirements of the Safety Committee of Engineering Construction Management Committee of Sichuan Liangshan Shuiluohe Electric Power Development Co., Ltd. (Notice No.2005), this scheme is formulated in combination with the actual situation of our department's safety production and construction.
I. Organizational structure
The project department shall set up a leading group for autumn safety inspection, and relevant departments shall be responsible for implementing relevant regulations and requirements for autumn safety inspection.
Team leader: Yang Jianke
Deputy Team Leaders: Wang Dengshu, Hu Chuan and Qiu Zhengdong
Members: Li Hai, Shi Yingdong, Shen Junfeng, Liu, Hu Chuanhong, Wu Guofeng, Hu Xiangfu and Hu Yingping.
Second, check the key points and main contents
This autumn safety inspection focuses on fully implementing the relevant national safety policies, the owner's relevant safety production management regulations and our recent safety production work, highlighting accident prevention and control, focusing on safety flood control, engineering construction safety, traffic safety, holiday safety, autumn and winter safety, and focusing on management, hidden dangers, measures, rectification and implementation of rules and regulations. Focus on strengthening the safety management of construction, traffic safety and personnel operation safety in our department, implement two votes and strengthen the inspection of safety supervision and management of important facilities. The key points and main contents of this autumn safety inspection are as follows:
1, learning situation of superior safety documents. Whether the project department timely organizes all construction personnel to learn the safety learning documents issued by the owner's safety production department and the completion of our company's key safety work and measures this year, with the focus on the implementation of "no violation of regulations", "three treatments" and autumn inspection.
2, improve and implement the responsibility system for production safety. Focus on checking whether all kinds of personnel at all levels take the safety production policy as the first premise.
(1) Check the implementation of 20XX safety target responsibility guarantee measures, the implementation of "three-level control" by various departments and teams, the development of routine safety work, and the management and assessment of the whole process of safety production.
(2) All departments and teams shall participate in safety study and thoroughly check the implementation of the safety system.
③ Operation safety risk control, operation discipline, labor discipline and standardization implementation.
(4) Investigation and assessment of production safety responsibility.
3, the construction site safety control. Whether there are safety management personnel to monitor the whole process during the construction, and whether they comply with the safety operation regulations and other relevant on-site safety regulations.
4. The implementation of illegal prevention, whether to study and carry out illegal prevention according to the owner's inspection standards for illegal prevention, the completion of special rectification tasks, equipment accidents and personal injuries, the prevention of various misoperation accidents, the safety management of key areas, the construction safety management, and the management of flammable and explosive materials. Fireproof, explosion-proof and antifreeze; Traffic safety management, hidden danger investigation and management and safety supervision.
5. Safety management of outsourced projects, whether the outsourced projects have signed contracts and safety agreements, whether they have passed the qualification examination, and whether the personnel involved in the work, including temporary workers, have received safety training and passed the examination. Whether the labor protection measures are in place and whether there are cases of "escrow by package" or "escrow by penalty".
6, in view of the weak links, pay special attention to the implementation of measures to prevent personal injury. Focusing on traffic management, check whether the traffic safety responsibility system is perfect, whether the driver's safety activities are carried out regularly, whether there are records, whether there are regular inspections and maintenance, whether there are vehicles running with diseases, and whether there are countermeasures for special climatic conditions, so as to improve the ability of accident prevention and control.
7, National Day, Mid-Autumn Festival and other important holidays and during the 18th National Congress of the Communist Party of China, to ensure the safe and reliable operation of equipment, safe and stable work; Safety supervision and management of inflammable and explosive articles and important facilities.
8. Safety education and training. Mainly check the training records, new temporary workers information registration, leaders at all levels to participate in safety education and training, various departments and safety management personnel and special types of workers according to the relevant provisions of the certificates.
9. Formulation and implementation of supporting rules for accident supervision. In accordance with the principle of "four don't let go" and the requirements of "following the rules according to law, seeking truth from facts and paying attention to practical results", we will seriously investigate and deal with unsafe incidents such as attempts, anomalies, obstacles and accidents, strictly investigate the responsibilities, learn lessons and implement rectification measures.
10, personal casualty management. The focus is on the formulation and implementation of preventive measures such as personal mechanical injury, electric shock, falling from a height, object strike, collapse, soup burning injury and poisoning injury.
1. Deeply learn from the accident lessons of brother units, strengthen the emergency management of production safety, improve the plan, improve the working mechanism for preventing accidents caused by natural disasters, and implement emergency equipment and materials.
Third, the timing.
1, organization and mobilization stage:
/kloc-From September to September 20th, 0/5, according to the requirements of the notice, combined with the actual production safety of our department, we carefully organized and arranged the implementation work, and completed the preparation of this plan required by the owner.
2, check the rectification stage:
10 September 22 to 10 October 20, our department will organize inspection according to the inspection points and inspection outline, combined with the actual production situation on site, and immediately rectify the problems and unsafe hidden dangers found during the inspection. For projects that cannot be rectified, effective preventive measures should be taken, emergency plans for accidents and detailed plans for rectification measures should be formulated and implemented in stages. At the same time, the self-inspection and rectification shall be completed before June 20th 10, and a Report on Self-inspection and Self-correction of Autumn Safety Inspection shall be submitted to the Owner (the report materials shall mainly reflect the problems found in the inspection, the rectification measures and the implementation of the rectification, etc. ).
3. Summary report stage
After the safety inspection in autumn, our department will summarize the safety inspection work and report the summary to the owner as required by the notice.