The heating period in Changchun in winter is nearly five months. In recent years, with the gradual increase of water loss in heating pipe network, in order to ensure the safe and stable operation of heating, effectively reduce water loss and achieve the purpose of energy saving and consumption reduction, Changre Group Company decided to organize a comprehensive water inspection activity.
Since the beginning of the heating period of 20 16-20 17, the daily water loss of Changre Group alone is as high as 10000 tons, which not only increases the heating cost, but also seriously affects the heating quality.
By then, Changre Group will cooperate with Longtai Thermal Power, Yatai Thermal Power, Tongxin Thermal Power and other companies to comprehensively carry out water loss survey and energy conservation and consumption reduction activities. The four enterprises will arrange 30 technicians to form a 10 inspection team, with 3 people in each group, to conduct joint inspection on 535 heat exchange stations in the heating network.
Liu Changchun, chairman of Changre Group, said that the water loss inspection is not only about water loss, but is arranged according to the arrangement of national energy conservation and emission reduction and the actual situation of enterprises. As a local state-owned enterprise in Changchun, it is impossible to unilaterally pursue long-term economic benefits at the expense of the happiness index of ordinary people. No matter how good the service is, the price will not go up. The economic benefits of long heat can only be realized by saving money and extending the industrial chain. Therefore, this time, checking the water to fill the leak involves the long-term development of the enterprise, and even the life and death of the heating enterprise.
(Source:)