☆ 1996, the first blank production line and machining production line were completed, and the production scale and product quality were greatly improved.
★ 1998, tool factory was established, and tools were processed by themselves.
☆ In 2000, three processing plants in the second plant area were completed and put into operation, with a production scale of 4 million pieces/year; In the same year, it passed the ISO9000 quality system certification.
★ The second edition in 2003 passed the ISO900 1:2000: 2000 quality system certification.
☆ In 2004, the production scale rose to 7 million tablets/year.
★ The third factory was completed and put into operation in 2006, specializing in casting low-pressure products; At the same time, the third factory added three special plane production lines. At this point, the annual production capacity of the enterprise has reached 10 million.
☆ In 2007, the third factory was technically reformed, which greatly improved the production scale and product quality of the factory and laid a solid foundation for exporting high-quality domestic products.
★ In 2008, with the approval of relevant departments of Chongqing Municipal People's Government, Chongqing Zhicheng Machinery Factory was transformed into Chongqing Zhicheng Machinery Co., Ltd. 。