Hope building. Located at the intersection of Zhongshan Road and Wu Hui Road, it is invested and built by Hyundai Comprehensive Commercial Co., Ltd. (50%), Hyundai Construction Co., Ltd. (25%) and Hyundai Merchant Shipping Co., Ltd. (25%). The project covers an area of 765,438+000 square meters, with a construction area of about 90,000 square meters. The building has 38 floors above ground and 3 floors underground, and its main functions are writing room and shopping center. The "Hope Building" project won the bid in February 1996 and started in July of the same year. When 60% of the project was completed, the ventilation and fire-fighting equipment projects for exterior decoration and interior decoration were completed after the main body was completed, which coincided with the Asian financial turmoil and was forced to stop work from June1999+1October due to financial difficulties.
At present, Hyundai Group has decided to transfer the "Hope Building" as a whole and is now negotiating with a Dutch company. In order to solve the problem as soon as possible, the municipal government is studying to give them policy support. The "Leading Group" is also actively coordinating relevant departments to help them solve some specific problems, such as opening another exit on the side of the building facing Zhongshan Road.
Beijing Zhu Hua Building Components Co., Ltd.
Engineering tasks of steel bar processing and prefabrication and installation of prefabricated components.