Consolidate the basic management of safety, strengthen the awareness of red line and strive to create standardization.
Operate the railway to achieve the overall goal of annual safety
—— Report at the company's 20 1X safety work conference.
Shaanxi yuheng railway co., ltd
20 1X year 65438+1October 23rd.
Leaders and comrades: Since 20 1X, the company has conscientiously implemented the spirit of the annual work conference of Shaanxi Railway Group Corporation, and promoted the construction of the "six-in-one" management system with the implementation of safety and quality standardization as the starting point. In the management of safety production, we should pay attention to strengthening the standardized management of construction production site, strictly control the "three non-activities" and "three violations" in the field of safety production, severely investigate and deal with illegal acts such as illegal employment, unlicensed employment, illegal contracting and subcontracting, and improve the safety risk management mechanism. Strengthen the construction of safety culture, constantly improve the safety management level of Chongqing-Hengyang Railway, and strive to build quality projects and safety projects, and achieved initial results. There were no serious injuries and major accidents in the whole year, and the safety goal of "zero casualties" was achieved, and the goals of safety basic management and safety production standardization were also successfully achieved. The safety work of the company in 20 1X is now reported as follows:
I. Completion of key safety work
(a) actively promote the standardization work, and strive to create a safety and quality standardization demonstration site.
According to the arrangement of Shaanxi Railway Group, the company was identified as the founder of 20 1X safety and quality standardization demonstration site. In order to carry out this activity in an all-round way, combined with the characteristics of the project under construction and the actual situation that the first phase is about to enter the formal operation, an operable implementation plan and implementation rules for safety and quality standardization work are compiled, the responsibility objectives are decomposed, and the safety and quality standards of each unit are simultaneously
Work carried out in the annual assessment. Through participating units and entrusted operating units, we will actively carry out the activities of establishing standardization demonstration sites and conduct regular inspections and assessments on standardization work. This year's standardization work is as follows:
1. Standardization of management system
In order to fully implement the spirit of "Provisions of Shaanxi Coal Group Company on Further Standardizing Safety Management and Strengthening the Construction of Safety Supervision and Management System (Provisional)", the company and all participating units have continuously improved the safety management system and safety supervision system through comprehensive investigation and improvement of various safety management systems. Combined with the characteristics of the project under construction and the operation management mode, 44 safety management systems, such as "Safety Production Standardization Management Manual" and "20 1X Year Standardization Management Implementation Plan", have been compiled successively, providing a solid system guarantee for safety and quality management.
2. Standardization of staffing
All contractors are required to supplement site management personnel in time, review the qualifications of special operations personnel, establish a special operations personnel account and conduct on-site assessment of operation skills to ensure that special operations personnel are certified and qualified.
3. Standardization of process control
Take the investigation and management of hidden dangers as an important part of daily safety management and bring them into the assessment of the company's basic safety management to realize the' normal management' of safety production. Set up a headquarters at the construction site of the second phase project, strengthen on-site safety inspection, and delineate the key points of safety and quality monitoring at each construction stage; The operation management unit is required to conduct a comprehensive investigation on line quality and operational safety and implement rectification measures in a timely manner. Strengthen the combination of daily inspection and regular assessment, so as to achieve rectification measures, responsibilities, time limit and
The "four in place" review ensured that the problem was completely rectified and all kinds of hidden dangers on the spot were eliminated in time. This year, * * * Company conducted 47 comprehensive evaluations and special inspections, issued 32 rectification notices for various problems, issued 10 circulars, investigated and dealt with hidden dangers 192, and imposed a cumulative penalty of125,000 yuan on all responsible units.
4. Standardization of site management
Work in strict accordance with the construction organization design, construction and safety technical disclosure, strict process management, standardized operation procedures, and implementation of process standards; Work in accordance with work instructions and operating procedures, standardize work behavior and reduce illegal operations. By carrying out special rectification activities for subgrade filling and quality common faults of bridge and culvert structures, the spread of various quality common faults has been effectively curbed; The implementation of the "one penalty for one incident" system has effectively reduced the phenomenon of "three violations" in the construction site.
5. Consolidate basic safety management and strive for advanced safety units.
In order to comprehensively promote the establishment of standardized demonstration sites, the company paid close attention to system construction and process control, and successfully passed the semi-annual and annual assessments organized by Shaanxi Coal Chemical Group. 165438+1October 27th, the company successfully passed the annual assessment of safety basic management, environmental protection basic management and safety quality standardization of Shaanxi Coal Chemical Group, and was highly praised by the two-level group companies.
(two) always adhere to the prevention, highlighting the prevention in advance.
1. Conduct safety risk management in an all-round way.
Combined with the characteristics of Yuheng Phase II project and the actual situation of Yuheng Phase I project, the major risk sources existing in the project and operation process are identified and evaluated.
Evaluate and establish the management files of major hazard sources, define the monitoring and management objectives for major hazard sources, and establish a hidden danger investigation and management account.
2. Full extraction of safety special expenses, establish a clear account for the use of expenses, and ensure safety investment.
Formulated the "Measures for the Extraction of Special Expenses for Work Safety", which was distributed synchronously with the progress payment; At the same time, all construction units are required to make clear and well-documented use of production expenses and establish a good expense account; The use of the expenses of each unit was inspected to ensure that the special expenses for safety production were fully extracted, earmarked and implemented. This year, the accumulated special safety production expenses of all projects under construction are 2.004 million yuan, and the safety production expenses are 246110 million yuan.
(3) Pay close attention to the "three implementations" and implement the responsibility for production safety.
Sign safety production responsibility letters with contractors and operation units, actively publicize safety production guidelines, policies, rules and regulations, and urge the implementation and enforcement of various safety production management systems; Conduct irregular inspections on the daily safety management of each unit to ensure that safety management personnel at all levels are aware of the on-site safety situation and strengthen the monitoring of key parts and hidden dangers of accidents. Work hard on "strict, detailed and practical". For each work goal of safety management, a complete and thorough implementation plan and specific scheme are formulated, which are decomposed layer by layer and implemented item by item.
(four) to carry out special rectification, strengthen safety and quality management
It has successively carried out special rectification of bridge construction and aerial work, special rectification of special operations, special rectification of the use and management of large equipment, and rectification of subgrade filling quality.