Photovoltaic power generation application report

Photovoltaic power generation application report template

Photovoltaic power generation is a technology that directly converts light energy into electric energy by using photovoltaic effect of semiconductor interface. The following is a collection of photovoltaic power generation application report templates for everyone, welcome to read!

Sample of photovoltaic power generation application report (I) xxx Development and Reform Commission:

In order to implement the Renewable Energy Law and the strategic goal of energy saving and emission reduction in the State Council, and accelerate the application of solar photovoltaic technology in urban and rural buildings, after preliminary efforts, the photovoltaic power generation demonstration project of Suori New Energy Co., Ltd. 13.8MWp in our district was included in the second batch of national "Golden Sun" demonstration projects in 20XX. In order to speed up the construction progress of the project, the owner has entrusted Science and Technology Engineering Co., Ltd. of the 11th Design and Research Institute of Information Industry Electronics to compile and complete the feasibility study report of the project. The main contents are reported as follows:

I. Project Name

13.8MWp photovoltaic power generation application demonstration project.

Second, the project owner

Suori new energy co., ltd.

Third, the construction address

The construction address of the project is located in Taizhou metal resource recycling industrial base in Sanqing Sanshan soil block of Luqiao. The solar power generation project uses the roof construction of the workshops of Zhejiang Judong Group Co., Ltd. and Taizhou Chen Ou Metal Material Co., Ltd. in the base, and the project does not add land.

Four. Construction scale and access scheme

In this project, crystalline silicon solar cell modules are used to install and construct photovoltaic power generation devices, with an application demonstration area of about 94,345 square meters and an actual installed capacity of 13.8MWp (divided into two subprojects, which are installed on the roofs of workshops in Judong and Chen Ou respectively, including Judong Group 12MWp and Chen Ou Company 1.8MWp), and 55,230 modules are installed. Self-made SR- 156P-250 was used as the component, and the conversion rate was 15.27%. Four inverter rooms are newly built, each with a building area of 80 square meters, which is a single-story building with reinforced concrete frame structure, with fire resistance and waterproof grade II. 1 10KV distribution room with a building area of 200m2. It is a single-story building, reinforced concrete frame structure, and fire-resistant and waterproof grade II. This system plans to adopt 27 GSG-500KTT-TV inverters with a capacity of 500kW and * * 1 GSG-250KTT-TV inverters with a capacity of 250kW.

According to the distribution of buildings, grid-connected inverters are respectively connected, and the inverters are converted into alternating current, and then boosted to 10KV by a booster transformer, and connected to the intranet access point for grid connection. Set up four parallel points to access the user-side power grid, including three 10KV parallel points (for personal use, with excessive internet access) and 1 380V parallel points (for personal use, without internet access).

Verb (abbreviation of verb) project investment estimation and fund raising

The total investment of the project is 14 187 1.7 million yuan, of which the direct cost of the project is 1.27508 million yuan, other costs are 1.2006 million yuan, and the reserve fund is 1.387 million yuan. To raise funds, it is planned to apply for 75.9 million yuan of state subsidies, 28.3744 million yuan of self-financing by enterprises and 37.5973 million yuan of bank loans.

Sixth, the construction period

The construction period of this project is 5 months.

Seven. benefit analysis

After the project is completed, it is estimated that the average annual power generation will be about 6.5438+0.29282 million kWh. Compared with the thermal power plant with the same power generation, it can save 5024 tons of standard coal every year, reduce the emission of carbon dioxide (CO2) 107 13.5 tons, 370.8 tons of sulfur dioxide (SO2) and 35.2 tons of nitrogen oxides (nitrogen oxides), and also reduce the discharge of wastewater and the pollution to the water environment. At the same time, after the project is put into production for 25 years, the total sales amount reaches194.75 million yuan, and the net profit is about 56.78 million yuan, so the project has good social and economic benefits.

Now the relevant materials are submitted with the article, please review, if there is nothing wrong, please forward it to the provincial development and reform commission.

I hereby ask for instructions.

Applicant:

Xx,xx,XX,XX

Demonstration application report of photovoltaic power generation (II) xxx Development and Reform Commission:

In order to make full use of the clean and abundant solar energy resources, convenient traffic conditions and power access conditions in Tao Le, Pingluo Zhongdian Energy Co., Ltd. decided to invest and build a 30 MW photovoltaic power generation project in Pingluo County after full demonstration. The project is located in Gao Ren Township, Pingluo County, with the geographic center coordinates of 38 degrees 42 minutes 19 seconds north latitude and 0/06 degrees 4 1 minute 18 seconds east longitude. The construction scale of the project is 30MWp, a single 125040 polysilicon solar panel with a capacity of 240Wp is installed, and 60 500kW inverters are selected; The main buildings are high and low voltage distribution room, inverter room, control room, material warehouse and office building, which are scheduled to be completed and put into production in June 20XX. The estimated total investment of the project is 3065438+450,000 yuan, of which the static investment of the project is 293.55 million yuan and the loan interest during the construction period is 7.9 million yuan. After the completion of the project, the energy structure of Ningxia will be improved to a certain extent, environmental pollution will be reduced, and some jobs will be provided for the local area, which will promote the accelerated development of regional economy and have good environmental and social benefits.

At present, the preliminary work of land pre-examination, environmental assessment, soil and water conservation, power grid access and other aspects of the project has been completed, and all the preliminary work is fully prepared.

I sincerely ask you to approve this project.

Is it proper? Please show me.

Applicant:

Xx,xx,XX,XX

;