Does Hunan Investment Hengdong Gas Turbine have a high return on investment?
Tall man. Xiangtou International Hengdong Gas Power Generation Project is the first batch of heavy gas turbine peak shaving projects in our province. Located in Hengdong Economic Development Zone, with a total investment of 2.5 billion yuan. It is planned to build two 9F-class heavy-duty gas turbines with international advanced level, and simultaneously build auxiliary power generation facilities, flue gas denitration devices, wastewater treatment and other supporting facilities. After the project is completed and put into operation, the annual power generation is about 654.38+0.96 billion kWh, the estimated annual output value is more than 654.38+0 billion yuan, the annual tax revenue is more than 80 million yuan, and the annual consumption of standard coal is reduced by about 500,000 tons.