The summary of the development of river length system is conducive to enhancing the awareness of ecological civilization of the whole society. The following summary of the development of river length system is what I want to share with you. Welcome to browse.
Part I: Overview of the development of river length system I. Main viewpoints
Thoroughly implement the spirit of the Fifth Plenary Session of the Eighteenth CPC Central Committee, the Twelfth Plenary Session of the Thirteenth Provincial Party Committee and the meeting of provincial and municipal river chiefs, in accordance with the "Tonggu County? River length system? Implementation plan ",to? Three strictness and three realities? Work style, closely around the construction of ecological civilization? Bronze drum model? This theme, according to? Establish management and protection institutions, clarify management and protection responsibilities, unify management and protection standards, and strictly assess management and protection? Requirements, full implementation? River length system? Establish a comprehensive management system for rivers and lakes reservoirs with clear responsibilities, sound systems and efficient operation, and comprehensively rectify indiscriminate occupation, unauthorized construction, reclamation, excavation, dumping and dumping? Four chaos? Problems, fully realize that there is no garbage on the river surface, no obstruction in the river channel, no sedimentation at the river bottom, no turbidity in the river channel, no damage to the river bank, no direct sewage discharge, no damage to greening, no violation of regulations along the river, etc. In the county? Eight zero? Goal, comprehensive construction? Is the river flat, the water clear, the shore green and the scenery beautiful? Copper drums with beautiful mountains and rivers.
Second, the main work
(A) timely arrangements for deployment, improve the organizational system
1, township market issued in time? River length system? Has the implementation plan been established? River length system? Manage the work leading group and office, and implement full-time staff (2-3) and required working funds. Clear all levels? River chief? And rivers and reservoirs? Sheriff. , protect the river (lake), formulate "? River length system? Work assessment methods ",launched" 20xx work points "and? River length system? Work system ",and held a special meeting to arrange deployment, full implementation? River length system? . (Responsible unit: each township, completion time: 20xx April 10)
2. Set in a conspicuous position on the banks of rivers and lakes? The head of the river library? Public signs, instructions? The head of the river library? Name, responsibilities, rectification objectives, supervision telephone number, etc. Accept public supervision. (Responsible unit: each township, completion time: 20xx April 15)
3. Before April 10 of 20xx, each department shall issue the "Special" according to the division of responsibilities. River length system? Work plan ",clearly in charge of the leadership and specific cadres? River length system? Work. (Responsible unit: relevant departments, time limit for completion: 20xx April 10)
(two) a comprehensive investigation, the establishment of river reservoir files.
Led by relevant departments, each township farm is specifically responsible for the investigation, comprehensively grasping the water quality status of rivers and lakes and the planning objectives of water quality improvement, grasping the composition and distribution of the total amount of industrial point sources, agricultural non-point sources and domestic pollution sources of polluted water bodies, comprehensively registering river information, and establishing? One river and one gear? 、? A library and a file? . The summary of the investigation of the lead department shall be submitted before April 22, 20xx? County River Corporation? County water affairs bureau.
1. Comprehensively investigate the process or area of rivers and lakes, sediment thickness, number of dams and other information. , and register in the form of words, tables and pictures. , and create a dynamic file. (Lead unit: County Water Affairs Bureau, responsible unit: townships, completion time: 20xx April 22nd)
2, a comprehensive survey of rivers and lakes water quality, the number of sewage enterprises along the line, respectively, in the form of words, tables, pictures, etc. , register and create dynamic files. (Lead unit: County Environmental Protection Bureau, participating unit: County Industry and Information Committee and County Industrial Park, responsible unit: township, completion date: April 22, 20xx).
3, a comprehensive survey of the number of sewage outlets in rivers and lakes, in the form of words, tables, pictures and so on. To create a dynamic file. (Lead unit: County Urban Management Bureau, participating unit: County Water Affairs Bureau, responsible unit: township farms, completion date: 20xx April 22nd)
4, a comprehensive investigation of agricultural non-point source pollution, respectively, in the form of words, tables, pictures, etc. , register and create dynamic files. (Lead unit: county agricultural bureau, responsible unit: township farms, completion time: 20xx April 22nd)
5, to conduct a comprehensive investigation of livestock and poultry breeding along rivers and reservoirs, respectively, in the form of words, tables, pictures, etc. , register and create dynamic files. (Lead unit: County Animal Husbandry and Fisheries Bureau, responsible unit: township farms, completion date: 20xx April 22nd)
6. Investigate the environmental sanitation of rivers, reservoirs, water surfaces and dikes in an all-round way, register them in the form of words, tables and pictures, and establish dynamic files. (Lead unit: Agriculture and Industry Department of the county party committee (rural area), participating unit: county urban management bureau (county river bank), county water affairs bureau (county water area), responsible unit: township farm, completion date: April 22, 20xx).
7, a comprehensive investigation of illegal sand mining in rivers and reservoirs, respectively, in the form of words, tables, pictures, etc., registration, the establishment of dynamic files. (Lead unit: County Water Affairs Bureau, participating units: County Environmental Protection Bureau, County Forestry Bureau and County Land and Resources Bureau, responsible unit: villages and towns, completion date: 20xx April 22nd)
8, a comprehensive investigation of rivers, reservoirs, illegal land occupation and construction behavior, respectively, in the form of words, tables, pictures, etc. , register and create dynamic files. (Lead unit: County Urban Construction Bureau, participating units: County Water Affairs Bureau, County Urban Management Bureau and County Land and Resources Bureau, responsible unit: villages and towns, completion date: 20xx April 22)
9, a comprehensive investigation of the behavior of blocking around the river, respectively, in the form of words, tables, pictures, registration, the establishment of dynamic files. (Lead unit: County Water Affairs Bureau, responsible unit: townships, completion time: 20xx April 22nd)
10, comprehensively investigate the greening and wetlands along rivers and reservoirs, register records in the form of words, forms and pictures, and establish dynamic files. (Lead unit: County Forestry Bureau, responsible unit: township, completion time: 20xx April 22nd)
(3) Carry out centralized rectification and optimize the ecological environment.
According to the work requirements, the leading departments and township farms will study and determine the specific measures and progress of comprehensive management of rivers and lakes. One river and one policy? 、? One library and one policy? . Focus on water quality standard testing, industrial enterprise management, sewage interception into pipes and direct discharge port plugging, agricultural pollution control, livestock and poultry breeding norms, waterfront cleaning, illegal sand mining regulation, illegal land occupation construction investigation, chaotic containment regulation, and river bank greening? Ten renovation projects? . Who will the leading departments and towns report to? County River Corporation? (County Water Affairs Bureau) shall submit the Work Plan for Special Renovation, and submit the Summary of Special Renovation Work before May 3 1 20xx.
1, the overall water quality of rivers and reservoirs reaches the standard, and the test results are regularly announced to the public, and the rivers and reservoirs with substandard water quality are specially rectified. (Lead unit: county environmental protection bureau, responsible unit: township, completion time: 20xx May 3 1)
2, on both sides of the river and around the reservoir enterprise wastewater discharge standards, special rectification of enterprises that do not meet the discharge standards. (Lead unit: county environmental protection bureau, participating unit: county industrial and information committee and county industrial park, responsible unit: township, completion time: 20xx May 3 1).
3. All the sewage along the river and reservoirs will be intercepted, and all the sewage will be put into the pipe, and the sewage outlet will be specially rectified. (Lead unit: County Urban Management Bureau, participating units: County Urban Construction Bureau, County Committee Ministry of Agriculture and Industry, County Environmental Protection Bureau, County Agriculture Bureau, County Animal Husbandry and Fisheries Bureau and County Public Security Bureau, responsible unit: township farm, completion date: May 3, 20xx1day)
4. Strengthen the control of agricultural non-point source pollution, prohibit the use of high-toxic and high-residue pesticides such as methamidophos, actively promote high-efficiency and low-residue pesticides, and carry out special rectification of zero growth of agricultural fertilizers and pesticides. (Lead unit: county agricultural bureau, responsible unit: township farms, completion time: 20xx May 3 1)
5 to regulate the livestock and poultry breeding on both sides of the river and around the reservoir, and carry out special rectification of fishery resources protection and livestock and poultry breeding pollution. (Lead unit: County Animal Husbandry and Fisheries Bureau, responsible unit: township farms, completion time: 20xx May 3 1)
6 rivers, reservoirs, rivers and banks will no longer accumulate garbage, and special rectification will be carried out for the treatment of domestic garbage in rural rivers and lakes. (Lead unit: Ministry of Agriculture and Industry of the county party committee, responsible unit: villages and towns, completion time: 20xx May 3 1)
7, prohibit illegal sand mining in rivers and reservoirs, and carry out special rectification of illegal sand mining. (Lead unit: County Water Affairs Bureau; participating units: County Environmental Protection Bureau, County Forestry Bureau, County Land and Resources Bureau, County Public Security Bureau, etc.). , responsible unit: township, completion time: 20xx May 3 1)
8. Unauthorized construction of rivers and reservoirs is prohibited, and special rectification of unauthorized construction is carried out. (Lead unit: County Urban Construction Bureau, participating units: County Water Affairs Bureau, County Urban Management Bureau, County Land and Resources Bureau, County Transportation Bureau, County Forestry Bureau, County Agricultural Bureau, County Local Maritime Bureau and County Public Security Bureau, responsible unit: township, completion time: May 3, 20xx1).
9. It is forbidden for all rivers and reservoirs to be blocked in disorder, and special rectification shall be carried out. (Lead unit: County Water Affairs Bureau, responsible unit: each township, completion time: 20xx May 3 1)
10. All rivers and reservoirs will promote coastal greening and wetland restoration and protection, and carry out special rectification of rivers and lakes' ecological environment. Each township farm should build 1-2 high-level demonstration sites of water ecological civilization (including 2 towns, 1 township and farm). (Lead unit: County Forestry Bureau, participating unit: County Water Affairs Bureau, responsible unit: township, completion time: 20xx May 3 1)
(4) Strengthen capacity building and lay a solid foundation for work.
1, develop the monitoring network of water quality, water quantity and water environment of rivers and reservoirs. Strengthen the monitoring of water quality, water quantity and water environment in cross-border sections, major intersections, key waters and key reservoirs of rivers. (county environmental protection bureau, county water affairs bureau, county hydrological station, townships)
2, the establishment of water quality deterioration investigation, pollution source traceability mechanism. (County Environmental Protection Bureau, County Water Affairs Bureau, etc. , each township)
3, docking provinces and cities river and lake management geographic information system platform construction, and gradually realize the basic data, river-related projects, waterfront management, water quality monitoring and other information, digital. Establish county and township levels? River chief? Instant communication platform, including daily inspection, complaint reporting, problem supervision, situation notification, responsibility implementation, problem handling, etc. Information and integrated management. (County Water Affairs Bureau, County Environmental Protection Bureau, County Industry and Information Committee, County Land and Resources Bureau, County Transportation Bureau, County Local Maritime Bureau, County Urban Construction Bureau, County Urban Management Bureau, County Agricultural Bureau, County Animal Husbandry and Fisheries Bureau, County Forestry Bureau, County Committee Ministry of Agriculture and Industry, etc. , all towns and villages)
4. Establish a joint law enforcement mechanism for river and reservoir protection and management led by Xianweiban and County Government Office with the participation of relevant departments. Centralized office, unified management and coordinated law enforcement? Mode, overall planning involves the administrative law enforcement functions of river and reservoir protection and management. (county office, county government office, county office, county water affairs bureau, county environmental protection bureau, county market supervision and management bureau, county forestry bureau, county land and resources bureau, county urban construction bureau, county agricultural bureau, county animal husbandry and fisheries bureau, county transportation bureau, county local maritime bureau, county urban management bureau, county public security bureau, county legal bureau, county power supply company, etc.). , all towns and villages)
5, to carry out the pilot work of leading cadres in waters, beaches, coastlines and other natural resources assets audit. (County Audit Bureau)
6. implementation? Six are the most beautiful? Selection activities? And commend and reward the units and individuals that have made outstanding achievements and made remarkable achievements. (Organization Department of the county party committee, county water affairs bureau, etc. And various township farms)
(5) Strengthen publicity and create a strong atmosphere.
Give full play to the functions of mainstream media such as Tonggu TV station, Tonggu newspaper, Tonggu government website, mobile newspaper and WeChat platform, carry out multi-form, multi-directional and continuous in-depth publicity activities, and actively create a good atmosphere for all sectors of society and the people to care, support, participate and supervise the protection and management of rivers and reservoirs. One is propaganda? River length system? Publicize the new measures, new practices, major decisions and arrangements of the party Committee and government to protect the ecological environment of rivers and reservoirs. The second is to carry out follow-up publicity of special rectification actions to create momentum and promote the rectification effect. The third is to do well? River length system? Related information release. Fourth, based on raising the awareness of ecological civilization of the whole society, carry out the work of river length? Into the countryside, into the enterprise, into the community, into the campus, into the office? Activities, condense the knowledge and resultant force of ecological civilization construction. Fifth, increase the exposure of illegal cases, give full play to the supervisory role of news media and public opinion, strive to guide enterprises and individuals to consciously fulfill their social responsibilities, consciously prevent and control pollution, and vigorously develop a green circular economy. Sixth, establish a water-saving mechanism in love the water, tap advanced models of water-saving work in love the water, and hire? Obligatory supervisor? In other forms, fully mobilize the public to actively participate, and actively create a strong public opinion atmosphere in which the whole people care, support and supervise the governance of rivers and lakes.
Chapter 2: Overview of the development of river length system 1. Strengthen leadership and improve institutions.
In order to do a good job in the prevention and control of water pollution in major rivers in the whole region, the district government set up a leading group for the prevention and control of water pollution in major rivers, with the district head as the leader, seven deputy heads involved in related work as the deputy heads, and the heads of relevant departments at the district level 13 as members, and established a system of environmental protection work contact meetings. At the same time, it is required that 19 related towns and seven district-level departments set up corresponding leading bodies, clearly define the leaders in charge and part-time environmental protection personnel, strengthen the leadership over the prevention and control of water pollution in major rivers at all levels, and ensure that all work is implemented. And issued a series of documents such as "Notice on Doing a Good Job in the Prevention and Control of Water Pollution in Major Rivers in 20xx", which clarified the target responsibilities of relevant towns and departments, and required to formulate specific work plans, refine tasks, and ensure the effectiveness of all work.
Second, the completion of the objectives and tasks
Our district actively organized and implemented the prevention and control of water pollution in major rivers, and completed 12 township domestic sewage treatment tasks, with a completion rate of100%; 5 domestic waste treatment projects, with a completion rate of100%; 2 livestock and poultry farm management projects, with completion rate of100%; 2 slaughterhouse treatment projects, with a completion rate of100%; There are 1946 biogas digesters built in rural areas, and the completion rate is100%; Completed all the objectives and tasks in 20xx. * * * The total investment is 26.778 million yuan.
1, domestic sewage treatment. This year, the city gave four towns and villages in our district the task of centralized treatment of domestic sewage. Our district has treated the domestic sewage in five towns, such as Gaoliang Town, Tai 'an Township, Tongfu Township, Sujia Township and Xindian Township, and built centralized treatment facilities for domestic sewage in towns by combining anaerobic purification with constructed wetlands. It is estimated that the total investment is about160,000 yuan, and the civil construction of the main project is under way.
2. Domestic garbage disposal. This year, our district has treated the domestic garbage of five towns and villages, including Cross Town. There are 5 villages and towns with annual garbage collection pools 12, 5 garbage stations, 86 garbage bins, 4 new garbage transfer vehicles and 3,654 tons of garbage, with a total investment of 2.063 million yuan, which has completed 100% of the 20xx target task.
3, livestock and poultry farms and livestock and poultry slaughter management. Livestock and poultry farm management, this year, the city issued the target task of 2 households in our district, and actually completed 2 households, including management 1 household and natural shutdown 1 household, with a total investment of 32,000 yuan, which completed100% of the target task in 20xx; The management of livestock and poultry slaughterhouses, this year the city issued two objectives and tasks to our district, and actually completed two households with a total investment of 38,000 yuan. 20xx target task completed 100%.
4. Construction of biogas digesters in rural areas. This year, the city issued 1425 rural biogas digesters in our district, and completed 1946, with an investment of 8.757 million yuan, accounting for 1.36% of the annual target task.
5. Salvage floating objects in rivers. This year, a total of river drift 1.386, water hyacinth 28,536 square meters, river course 26.8 kilometers, garbage 1.254 tons and silt 3,482 cubic meters were salvaged in our district, and the investment was about 485,000 yuan. All towns and villages have salvaged the floating objects in the river, and some towns and villages have fixed personnel to regularly salvage and clean the river surface to ensure that the river surface is clean and free of floating objects.
The third is to strengthen measures and pay close attention to implementation.
?
;