Implementation plan of river length system management

Implementation plan of river length system management

JUNG WOO ban fa [20 14]No. 15 1

Relevant township people's governments, sub-district offices, and relevant departments and units directly under the district:

In order to effectively speed up the comprehensive improvement of sluice water environment in Jin Dong, and comprehensively improve and improve the sluice water environment quality in Jin Dong, this implementation plan is formulated according to the spirit of the document "Implementation Plan for River Length Management in Shangyu District" (District Committee Office [2014] No.2) and the actual situation of Jin Dong sluice.

I. Scope of implementation

The drainage channel of Jindongmen starts from the west steep gate of Yiting and ends at Xindongmen, with a total length of 21.8km. Among them, Yiting Town is about 0.6km, Xiaoyue Town is about 4.5km, Xietang Town is about 3.9km, Guanbai Street is about 2.0km, Gaibei Town is about 2.2km, and Shangyu Economic and Technological Development Zone in Hangzhou Bay is about 8.6km..

II. Objectives and tasks

Through the full implementation of the "river length system" management of the Tokyo sluice drainage river, the comprehensive management of the Tokyo sluice drainage river environment will be strengthened, and the "five noes" goal of no debris floating, no illegal setting, no bank protection collapse, no sewage direct discharge and no sludge deposition within 200 meters on both sides of the main river and 500 meters upstream of the tributary coast will be realized, and efforts will be made to create a new environment of the Tokyo sluice drainage river with clear water and smooth shore and beautiful shore green scenery.

Third, the division of responsibilities

The drainage river of Dongjin sluice is implemented with "river length system", which is carried out according to the principle of territorial management and departmental coordination. The specific implementation units are Yiting Town, Xiaoyue Town, Xietang Town, Guanbai Street, Gaibei Town and Shangyu Economic and Technological Development Zone in Hangzhou Bay. District Science and Technology Bureau is the contact department, including District Agricultural Office, Water Conservancy Bureau, Environmental Protection Bureau, Agriculture, Forestry, Fisheries and Animal Husbandry Bureau, Finance Bureau, Land and Resources Bureau, Construction Bureau, Transportation Bureau, Urban Management and Law Enforcement Bureau, Water Group and other departments. Political Consultative Conference Office, Party School, Court, Procuratorate, People's Armed Forces Department, Construction Bureau, Planning Bureau, Transportation Bureau, Commerce Bureau, Culture and Broadcasting Bureau, Radio and Television General Station, Audit Bureau, Safety Supervision Bureau, Urban Management and Law Enforcement Bureau, Service Industry Development Bureau, Reclamation Bureau, Port Authority, Urban Reform Bureau, Provident Fund Center, Land and Resources Bureau, Power Supply Bureau, China Unicom, Minsheng Bank, PICC, etc.

The specific responsibilities of each member unit are as follows:

Six towns (streets, development zones) in Hangzhou Bay, such as Yiting Town, Xiaoyue Town, Xietang Town, Guanbai Street, Gaibei Town and Shangyu Economic and Technological Development Zone, are responsible for the environmental management of the drainage channel of Dongjin Gate in this area, and are responsible for the removal and interception of garbage, weeds and floating objects in the main channel and tributaries of Dongjin Gate. Responsible for the remediation of all kinds of pollution sources, illegal buildings (including pollution sources) and sewage outlets within 200m on both sides of the main channel and 500m on both sides of the tributaries of the drainage channel of Dongjin Gate, as well as the daily cleaning and wreck salvage of the riverbanks within 200m on both sides of the main channel and 500m on both sides of the tributaries of Dongjin Gate.

District Science and Technology Bureau is the work contact department, responsible for information release, information collection and submission and other contact work; In accordance with the overall work objectives and requirements, according to the plan submitted by the implementation unit, be responsible for the refinement, task decomposition and implementation of the implementation plan of the "river length system" for the drainage channel of Dongjin Gate, and conduct supervision and assessment.

3. The District Agricultural Office is responsible for the construction of rural domestic sewage pipe network and speeding up the treatment of domestic sewage in villages along the Dongjinzha drainage river; Responsible for guiding and supervising the treatment of rural domestic garbage; In accordance with the construction requirements of beautiful countryside, strengthen the overall construction of rural environment along the line.

4. The District Environmental Protection Bureau is responsible for the unified supervision and guidance of pollution prevention and control along the drainage channel of Dongjin Gate; Responsible for water quality monitoring and regular inspection; Do a good job in the preparation of pollution source control plan, focusing on industrial pollution control; Severely investigate and deal with all kinds of environmental violations.

5. District Agriculture, Forestry, Fisheries and Animal Husbandry Bureau is responsible for leading and guiding relevant towns (streets) to carry out agricultural non-point source and aquaculture pollution control within 200 meters on both sides of the main channel and 500 meters on both sides of tributaries along the river, do a good job in fishery marketing management, and () guide livestock and poultry pollution control and policy formulation; Responsible for the water surface cleaning of the former state-owned farm.

[6] The District Water Conservancy Bureau is responsible for taking the lead in guiding relevant towns (streets) to carry out illegal river construction cleaning, river dredging and remediation work within 200m on both sides of the main channel of Dongjin sluice drainage river and 500m on both sides of the river along tributaries, and coordinating the water surface cleaning work of relevant departments and towns; Responsible for water body replacement.

7. The District Transportation Bureau shall, in accordance with its responsibilities, cooperate with Dongjin Gate to carry out comprehensive management of drainage river environment.

8. The District Finance Bureau shall, according to its responsibilities, cooperate with Jin Dong Gate to comprehensively manage the drainage river environment.

9. The District Urban Management Law Enforcement Bureau cooperates with the comprehensive management of the drainage river environment of Dongjin Gate according to its own responsibilities.

10. The District Bureau of Land and Resources cooperated to carry out the comprehensive management of water environment in the drainage channel of Dongjin Gate according to its own responsibilities.

1 1. Water Group cooperated with the Construction Bureau and related towns (streets) to carry out the sewage interception project for the drainage river of Dongjin Gate.

Other relevant departments and units at the district level, according to the spirit of the document "Implementation Plan for the Management of" River Length System "in Shangyu District" (District Committee Office [2014] No.2), carry out their duties and coordinate with each other to promote the implementation of "River Length System". Section liaison departments should strengthen daily liaison support to ensure the management efficiency of Jin Dong sluice drainage channel.

Four. Contents and measures

1. Strengthen the law enforcement and supervision of industrial pollution sources. Conscientiously implement the environmental protection examination and approval of construction projects and strictly control water pollution projects. Continue to implement industrial transformation and upgrading, carry out quantitative assessment, comprehensive ranking and sorting by industry for industrial transformation and upgrading of heavily polluting industries, and implement comprehensive measures such as reducing emission rights indicators and rectifying within a time limit for enterprises with lower rankings according to law, forcing transformation and upgrading. Organize various special actions for environmental protection. Strict measures such as high fines, recovery of excessive sewage charges, suspension of production and rectification, media exposure, and detention of personnel were taken according to law, and the crackdown on water environmental violations along the drainage channel of Dongjin Gate was continuously intensified, and the sewage outlets along the line were cleaned up in time.

3. Accelerate the collection and treatment of industrial sewage. Accelerate the construction of industrial sewage collection pipe network in Yiting Town, Xiaoyue Town, Xietang Town, Guanbai Street, Gaibei Town and Shangyu Economic and Technological Development Zone in Hangzhou Bay area, and effectively improve the sewage acceptance rate.

13. Clean up and rectify livestock and poultry breeding and aquaculture sites along the line. Clean up and close the livestock and poultry farms and aquaculture sites in the livestock and poultry breeding forbidden area on both sides of the main channel of the Jin Dong sluice drainage river within a time limit, and rectify the livestock and poultry farms and aquaculture sites within 200 meters on both sides of the main channel and 500 meters on both sides of the tributaries in the forbidden area. Comprehensive management of pig farms with more than 200 storage columns in restricted areas, supporting agricultural and animal husbandry recycling facilities, and implementing ecological farming; Pig farms with less than 200 heads on hand should be gradually closed in combination with the special rectification of "three reforms and one demolition".

4. Accelerate the collection and treatment of domestic sewage. Accelerate the construction of sewage pipe network in Guanbai Street, Yiting Town, Xiaoyue Town, Xietang Town and Gaibei Town, strengthen the sewage treatment of "six small industries", and strive to improve the sewage collection and treatment rate of market towns. In accordance with the principle of adjusting measures to local conditions, we will promote the construction of centralized treatment facilities for village-level domestic sewage in an orderly manner and strengthen the collection and treatment of rural domestic sewage.

5. Comprehensively clean up and rectify the river environment on both sides of the Jin Dong sluice drainage river. Comprehensively clean up and rectify all kinds of illegal buildings, melon sheds along the river, illegal fishery breeding facilities, centralized garbage collection points and toilets, and timely clean up garbage dumps salvaged from the river.

6. Strengthen the management of river cleaning. Further improve the long-term cleaning mechanism of the drainage channel of Dongjin Gate, and the daily cleaning within the water area of the drainage channel of Dongjin Gate and within 200 meters on both sides of the main channel is specifically responsible for the township (street, development zone) where the region is located. According to the annual assessment score, the district finance will give subsidies in the form of "awards on behalf of subsidies". The specific subsidy standard is 3,000 yuan/km per year, and the insufficient part is supported by the town (street, development zone) [see Annex 3 for the summary table of cleaning length of township streets in Dongjin sluice drainage river].

7. Ensure the safe and smooth drainage of the river. According to the plan, the normalized management of Jin Dong sluice drainage channel dredging will be strengthened, and the task of salvaging sunken ships, fishing rafts, fishing nets (fish foils) and boathouses will be implemented to ensure smooth drainage of the river.

8. Strengthen water quality monitoring of Jin Dong sluice. Set up fixed monitoring points in towns and streets along the drainage channel of Dongjin sluice, strengthen water quality monitoring, grasp the dynamic changes of water quality, and strive to improve the water quality of the section year by year.

Verb (short for verb) timing

Investigation stage (65438+1October 6-April 24). Complete the distribution of industrial pollution sources, agricultural pollution sources, domestic pollution sources and river environment investigation within 200 meters on both sides of the main channel and 500 meters along the tributaries of the Dongjin sluice drainage river.

2. Mobilization and deployment stage (February1-February 15). Hold a mobilization meeting to start the rectification work plan.

3. Overall promotion stage (after April 25th). According to the implementation plan of "one river and one policy" for the regulation of the drainage channel of Dongjin sluice, in accordance with the requirements of responsibility and division of labor, the comprehensive regulation of the water environment of the drainage channel of Dongjin sluice will be carried out year by year, and the industrial pollution sources, agricultural pollution sources, domestic pollution sources and river environment along the river will be completed as planned.

Work requirements of intransitive verbs

1. Strengthen leadership and form a joint force. A leading group for the "river length system" management of Dongjin sluice drainage river was established with Standing Committee Hu as the team leader and the main leaders of relevant units as members. The office is located in the Science and Technology Bureau, and Director Chen Rongrong is also the director of the office. The office set up corresponding working groups to formulate practical implementation plans, list remediation plans year by year, and promote the implementation on schedule. All member units should strengthen communication, support and cooperation, form a joint management force, and promote the smooth progress of the "river length system" management.

2. Strictly enforce the law and create an atmosphere. It is necessary to further strengthen law enforcement, resolutely investigate and deal with all kinds of environmental pollution violations, adhere to the principle of "laws must be strictly enforced and violators must be prosecuted", consolidate the achievements of comprehensive river regulation, and reduce pollution while managing. It is necessary to make full use of newspapers, radio, television, internet and other media and publicity platforms to publicize the "river length system" of the Dongjin sluice drainage river, enhance the awareness of the whole people to protect the water environment, and enable the people to truly understand and participate in supporting the rectification of the Dongjin sluice drainage river and form a good atmosphere.

3. Standardize the system and strengthen the assessment. The office of the leading group is responsible for assessing the implementation of the "river length system" in the area under the jurisdiction of the Dongjin sluice drainage channel, strengthening the supervision of the work progress, the implementation of remediation measures and the main problems existing in the work in the form of unannounced visits, regularly reporting and supervising the implementation, and establishing the "river length system" joint meeting system. All units should implement the target responsibility system, do a good job of implementation step by step, and report the work to the office of the leading group at the end of each month. The assessment results are linked with funds and cadres' achievements, and as an important basis for the comprehensive assessment and evaluation of leading bodies and leading cadres, the units and "river chiefs" who have made outstanding achievements and achieved remarkable results in the "river length system" of Dongjin sluice drainage river will be rewarded. Units and "river chiefs" who fail to pass the examination and rectification are not in place, and "one-vote veto" is implemented to cancel the qualification of pingxian Pingyou.

Attachment: 1 Breakdown table of management responsibility for implementing "river length system" in the drainage channel of Dongjin sluice

2. List of pollution sources in the sections of villages and towns (streets, development zones) of Dongjin sluice drainage river

3. Jin Dong sluice drainage river township (street, development zone) cleaning river length summary table.

4.20 14 to 20 16 dongjin sluice drainage river water environment control plan.

5. 20 14 annual work task list for environmental improvement of Dongmen drainage river.

Shaoxing Shangyu District People's Government Office

June 20 14 10