2. Analysis of engineering geological disasters after the second line of Turpan-Korla section of South Xinjiang Railway Reconstruction Project.
3. Comparative analysis of low strain reflected wave method and core drilling method for detecting pile integrity Dong Chengquan, Gu Mu, Yan,
4. The application of the construction technology of vertical membrane seepage-proof curtain in foundation pit seepage-proof engineering.
5. Discussion on soil squeezing effect of static pressure precast pile in silty sand area of Liu Jianfeng.
6. Laboratory experimental study on resistivity of lime-fly ash compacted clay
7. Construction method of large-diameter cast-in-place pile under geological conditions of coal gangue
8. Preliminary study on calculation model of resistivity of lime earthwork.
9. Present situation of domestic gas drilling technology Dou Jinyong Tian
10. Fine study on the structure of Shengtuo Oilfield 1 Member 2 of Shahejie Formation 1 ~ 3 sand group.
1 1. Application of Oilfield Development and Production Database in Shen Ming Reservoir Management
12. Buckling analysis of drill string Li Wei, Wang Guorong, Jian Zheng, Zhang Yuhong, Tao Huang, Li Wei, Wang Guorong, Jian Zheng, Zhang Yuhong and Huang Tao.
13. Some experiences of applying Topaze software and Song
14. Analysis of Rock Star Diamond Rope Core Drilling in Broken Strata
15. Analysis and research on water injection development of Tanjiaying Oilfield, Zhang Peng, Gaogang and Baiyanchang 2 reservoirs.
16. Successful application of latex cement slurry system in well GK 13H in Tahe Oilfield, Liu Yongsheng.
17. The development law of sedimentary facies in Carboniferous sandstone-mudstone profile in northern Tarim area, He Yun, Xu, Xu, and Xu.
18. Improvement and perfection of eccentric separate injection Y34 1 packer for directional well bridge, Ju Yafeng, Li Ming, Hao Bingying, Guan Yu.
19. Overall scheme design of hydraulic water injection pumps in Qu Rui, Zheng Zhijun and Wuchang.
20. Discussion on geological factors affecting coal seam gas content in Jinying Qinshui Basin, Zhao Yongjun.
2 1. Mechanical-chemical coupling study on wellbore stability of extended reach wells Liu Xinfeng, Liu Gao, Wang.
22. Zou real-time logging information service system and its implementation method analysis.
23. Detection and repair technology of casing damaged wells in deep wells in western Sichuan
24. Development course and present situation of gas drilling at home and abroad Dou Jinyong and Song Ruihong
25. Current situation of domestic gas drilling equipment
26. Analysis of Common Problems in Gas Drilling
27. The application of S56 rope coring drilling technology in the construction of medium and deep holes has been studied.
28. Preliminary study on improving ROP of deep wells and large holes by reaming while drilling technology Yuan Xiaorong, Liu Xuebin, Li Junbo, Li Shusheng.
29. Evaluation device and method of stratum bearing capacity, Huang Jinjun, Zhang Bin,,, Feng.
30. Application of PAB solid-free polymer flushing fluid in formation core drilling in fracture alteration zone of chloritization: Taimuli, Central, Jiang Yin.
3 1. Study on interpretation of edge test data of gas wells in Sebei No.2 gas field. Zhang Lu, Yu, Tian Yang, Huang.
32. Analysis and countermeasures of complex well kick in Changlingzhuang 606.
33. The application of diamond serrated bit in hard sliding stratum.
34. Drilling and Completion Technology of Ground Source Heat Pump Hot Water Well in Urumqi Feng Run, Wang Yong, Ma Hong
35. Development hole of splash joint of piston kelly, Zheng Ruiqiang, and Leo.
36. Analysis of reservoir characteristics and sedimentary structure of an oilfield in Sudan.
37. Analysis of exploration prospect of Wushi sag in Beibu Gulf Basin Zhu Jitian, Guo Minggang, Liu Zhihui
38. Application and field evaluation of screw pump oil recovery technology in Tian Yang, Liu Wenbo, Qinghai Oilfield
39. Research and application of cluster well rapid drilling technology in Tuha Oilfield.
40. Analysis of metallogenic geological characteristics and ore-controlling factors of Xibailugou gold deposit in Songxian County, Henan Province
4 1. Discussion on Jurassic coal-forming law and coal prospecting prospect in Chaoshui basin, Zhang Xiaojun
42. Design and implementation of geocoding system
43. Design of underground fresh water exploration work plan in Shaya County, Xinjiang, Ma, Anhaitang, Rong and Anhaitang.
44. The design and construction technology of upward cross-layer drilling with grid format is brilliant.
45. Geological characteristics and prospecting direction of bentonite deposits in Ningming County, Guangxi: Hou Dongzhuang, Wu, Ge Liping, Dongzhuang, Wu Xiangbin and Ge Liping.
46. Characteristics and prospecting direction of Tianhe stratabound copper deposit in Xinjiang.
47. Geological route selection of valley terrace in Edick-Kangcun section of Hou-E railway.
48. Geological characteristics and genesis of Balabach Braque iron deposits in Wei Jun, Wang Mei and Li Xiaojun.
49. Economically feasible natural ecological environment control methods for small coal mines Cao and Li Huayong
50. Research on structural design of flameproof shell of underground microseismic monitor Li, Sun Wenbiao, Gao Xinchun, Wang
5 1. Significance of logging analysis of sedimentary environment in Jinbaotun coalfield
52. The application of double well orientation in Jiang Bin Tianfa Coal Mine.
53. Wang Yusheng, Hebi Coal Company No.9 Mine Reconstruction and Expansion Project Design Optimization
54. Structural superposition and metallogenic tectonic evolution model of Xushan tungsten deposit in fengcheng city, Jiangxi Province.
55. Analysis of hydrogeological characteristics and water filling factors in permafrost regions in Narigongma mining area, Qinghai, Zhao, Wang Jun, Guo Hongye, Tian Chengcheng.
56. Analysis of ore-controlling geological conditions of Xiemaling gold deposit in Tongbai, Henan Province.
57. Construction Technology of Fault Broken Zone in Wangbao Zhenbao Tunnel
58. Re-evaluation and dynamic management of adverse geological risks of Wang Jinzhi Taining Railway Tunnel
59. Slope reinforcement scheme design of the entrance section of 5# highway tunnel on the right bank of Goupitan Power Station
60. Ren Liang, Yuan Tao, Lu Dongmei, Ren Liang, Tang Yuan and Lu Dongmei participated in the construction of soft rock tunnel.
6 1. Cracking reasons and preventive measures of concrete perforated brick wall Zhang Zongjun, Gao Yong
62. Research on the Application of GIS Technology in Road Route Selection
63. Design and construction of bridge-building machine MZ64/3200 of Baimahe Bridge, Ren Xuchu.
64. Characteristics and engineering prevention of snow damage on Ha Jiangmen Line
65. Demolition of Yuan Tao, Ren Liang and Lu Dongmei by directional blasting with thick lining chimneys.
66. Design and Analysis of Variable Stiffness Leveling for Pile Raft Foundation of Gansu High-rise Building
67. Inspection and application of hydraulic concrete curing method in Song Lide
68. Landslide treatment of 3K+992 ~ 4K+036 section of Hefei-Wuhu Expressway
69. Demolition of thin-walled reinforced concrete chimneys in Li Hongfei, Yinghaijian, Zheng Fei and Wang Junhai by blasting.
70. The calculation method of the coordinates of the center line point and the outer vector point of the curve Qu Peng Yun
7 1. Research progress of pollutant migration in landfill. Zhang Shilin, Li Zekai
72. Several problems that the contractor should pay attention to in the claim of Han Zhihua Huai project cost.
73. Talking about the cost management of drilling construction project Zhang Liu
74. Week, the risk control of construction enterprises bidding
75. Talking about the construction and management of urban underground pipeline information systems in Wang Qiang, Yang Huan, Wang Qiang and Yang Huan.