Documents on the establishment of safety production management institutions by construction enterprises.
Measures for the establishment of safety production management institutions and the staffing of full-time safety production management personnel in construction enterprises Article 1 In order to standardize the establishment of safety production management institutions and the staffing of full-time safety production management personnel in construction enterprises and construction projects, these measures are formulated in accordance with the Regulations on the Administration of Safety Production in Construction Projects. Article 2 These Measures shall apply to civil engineering, construction engineering, installation of lines, pipelines and equipment, and activities of new construction, reconstruction, expansion and demolition of decoration engineering. Article 3 Safety production management institutions refer to construction enterprises and their independent functional departments established in construction projects to be responsible for safety production management. Branches of large construction enterprises, such as branches and regional companies, shall independently set up safety production management institutions to be responsible for the safety production management of their own enterprises (branches). Construction enterprises and their subsidiaries, regional companies and other large branches must set up safety production management institutions in construction projects. The responsibilities of the safety production management organization mainly include: implementing the national laws, regulations and standards related to safety production, compiling and updating the safety production management system in time, and organizing activities such as safety education and training for all employees and safety inspection. Article 4 Full-time safety production management personnel refer to full-time personnel who have passed the safety production assessment by the competent construction department or other relevant departments and obtained the safety production assessment certificate, and are engaged in safety production management in enterprises, including the person in charge of the enterprise safety production management organization and its staff and full-time safety production management personnel at the construction site. The person in charge of the enterprise safety production management institution shall, according to the actual situation of enterprise safety production, revise the rules and regulations of enterprise safety production in time, deploy safety production management personnel at all levels, supervise, guide and evaluate the safety production management of various departments or branches of the enterprise, and cooperate with relevant departments to investigate and deal with accidents. The personnel of the enterprise safety production management organization are responsible for the statistics of safety production-related data, the equipment and inspection of safety protection and labor protection articles, and the safety supervision of the construction site. Full-time safety production management personnel on the construction site are responsible for the patrol inspection of safety production on the construction site and make records. When potential safety hazards are found on site, they should be reported to the enterprise safety production management organization and project manager in time; Should immediately stop illegal command and operation. Article 5 The full-time safety production management personnel in the safety production management organization of the general construction contracting enterprise shall be fully equipped according to the qualification category and grade of the enterprise. According to the production capacity or construction scale of the enterprise, the number of full-time safety production management personnel shall be at least: (1) group company-1 person/10,000 square meters (production capacity) or per billion building output value, and not less than 4 persons. (2) Engineering company (branch company, regional company)-1 employee/1 00000 square meters/year (production capacity) or every1100 million construction output value/year, with no less than 3 employees. (3) Professional company-1 person/100,000 square meters/year (production capacity) or per1100 million building output value/year, and no less than 3 people. (4) Labor service companies-1 workers /50 construction workers, and there are no less than 2 workers. Article 6 A construction project shall set up a safety production management team headed by the project manager, and its members shall include full-time safety production management personnel assigned by the enterprise to the project. The allocation of full-time safety production management personnel is as follows: (1) Construction projects and decoration projects are at least 1 person: projects with a square meter or less 1, 1 person; 2, 10000 ~ 50000 square meters project at least 2 people; 3, more than 50000 square meters of the project at least 3 people, should set up a safety supervisor, according to the civil engineering, mechanical and electrical equipment and other professional set up full-time safety production management personnel. (2) Total installation cost of civil works, lines, pipelines and equipment: at least 1 person for projects below 50 million yuan; 2, 50 million-65.438+0 billion yuan project at least 2 people; 3, 1 100 million project at least 3 people, should set up a safety supervisor, according to the civil engineering, mechanical and electrical equipment and other professional set up full-time safety production management personnel. Article 7 Where new technologies, new processes and new materials are adopted in the project or there are many harmful factors and the construction operation is difficult, the full-time safety production management personnel on the construction site shall be increased according to the actual construction situation and the equipment standards stipulated in Article 6. Article 8 If there are less than 50 construction workers in the construction project of a labor subcontracting enterprise, it shall set up 1 full-time safety production management personnel; 50 -200 people, should set up two full-time safety management personnel; More than 200 people, should according to the actual situation of partial project construction risk, not less than 5‰ of the total number of enterprises. Article 9 The construction team shall have a part-time safety inspector to supervise and inspect the safety of the construction team's workplace. Tenth the State Council railway, transportation, water conservancy and other relevant departments and localities may formulate detailed rules for implementation according to these measures. The relevant departments have provisions, from its provisions. Eleventh approach by the Ministry of construction is responsible for the interpretation of. Measures for the compilation of special construction schemes for high-risk projects and the examination of expert argumentation Article 1 In order to strengthen the safety and technical management of construction projects, prevent construction safety accidents and ensure personal and property safety, these measures are formulated in accordance with the Regulations on the Administration of Work Safety in Construction Projects. Article 2 These Measures shall apply to civil engineering, construction engineering, installation of lines, pipelines and equipment, and activities of new construction, reconstruction, expansion and demolition of decoration engineering. Article 3 Projects with greater risks refer to the seven subprojects mentioned in Article 26 of the Regulations on the Administration of Work Safety in Construction Projects, and a special safety construction plan shall be prepared separately before construction. (1) Foundation pit support and dewatering engineering Foundation pit support engineering refers to the excavation of a foundation pit (groove) with a depth of more than 5m (including 5m) and the construction of the supporting structure; Or the foundation pit is less than 5m, but the geological conditions and surrounding environment are complex, and the groundwater level is above the pit bottom. (2) Earthwork excavation refers to the earthwork excavation of foundation pits and troughs with excavation depth exceeding 5m (including 5m). (3) Formwork engineering: formwork engineering for various tools, including slipform, climbing formwork and large formwork; Formwork support system for horizontal concrete members and formwork engineering for special structures. (4) Lifting and hoisting works (5) Scaffolding works 1, floor-standing steel pipe scaffolding with a height exceeding 24m; 2. Attach lifting scaffolding, including integral lifting and sectional lifting; 3. Cantilever scaffolding; 4. Portal scaffolding; 5, hang scaffolding; 6, hanging basket scaffolding; 7. Unload the platform. (6) Demolition blasting engineering adopts manual and mechanical demolition or blasting demolition engineering. (seven) other dangerous projects 1, the installation and construction of building curtain wall; 2. Tension construction of prestressed structure; 3. Tunnel construction; 4, bridge engineering construction (including bridging); 5, special equipment construction; 6, grid and cable-membrane structure construction; 7, more than 6m slope construction; 8. River diversion and closure construction; 9, port engineering, waterway engineering; 10, the adoption of new technologies, new processes and new materials may affect the quality and safety of construction projects, and administrative permission has been obtained without technical standards. Article 4 The compilation and review of special safety construction schemes prepared by professional engineers and technicians of construction enterprises shall be reviewed by professional technicians of technical departments of construction enterprises and professional supervision engineers of supervision units, and signed by technical leaders of construction enterprises and chief supervision engineers of supervision units. Article 5 A construction enterprise shall organize an expert group to demonstrate and review the project (1) A deep foundation pit project with an excavation depth of more than 5m (including 5m) or a basement with more than three floors, or a project with extremely complicated geological conditions, surrounding environment and underground pipelines, although the depth is not more than 5m (including 5m). (2) Underground excavation engineering Underground excavation and tunnel engineering with complicated geology such as karst caves, underground rivers, gas, rockburst, mud gushing and faults. (3) The height of formwork support system of horizontal concrete members in tall formwork engineering exceeds 8m, or the span exceeds18m, and the total construction load is greater than 10kN/m2, or the concentrated line load is greater than 15kn/m .. (4) Aerial work projects of 30m and above (5) Deep-water work projects of great rivers (6) (2) The expert group of safety special construction scheme must submit a written demonstration review report, which can be improved by the construction enterprise according to the demonstration review report, and can only be implemented after being signed by the technical director and chief supervision engineer of the construction enterprise. (3) The written demonstration review report of the expert group is taken as the attachment of the special safety construction scheme. In the process of implementation, the construction enterprise shall organize the construction in strict accordance with the special safety plan. Seventh the State Council railway, transportation, water conservancy and other relevant departments and localities may formulate detailed rules for implementation according to these measures. Article 8 The Ministry of Construction shall be responsible for the interpretation of these Measures.