Meinan Water Control Project is located in the south of Meizhou City, and consists of four medium-sized reservoirs: Mimi, Lanxi, Meinan and Tianye * * *, with a total controlled catchment area of 1.36 55438+0 square kilometers and a total storage capacity of 5528+0.7 million cubic meters. At present, drinking water in Meizhou is mainly supplied by Qingliangshan Reservoir, and the annual water supply of Qingliangshan Reservoir is 65.335 million cubic meters. At present, the daily water demand in Meizhou is 6.5438+0.65 million cubic meters, which is close to the designed water supply capacity after the expansion of Qingliangshan Reservoir. It is predicted that by 2020, the population of Meizhou will reach 500,000 and the total water demand will reach 93.05 million cubic meters. The annual water demand of Shejiang Industrial New Town is 26.65 million cubic meters. Therefore, the planning and construction of new water sources in Meizhou urban area and industrial new city is imminent.
Water conservancy construction
From June 9, 2065438 to June 2, 2065438, Guangdong Provincial Water Resources Department held a provincial review meeting on the project proposal of Meinan Water Control Project in Meizhou City, which was presided over by He, a member of the party group and chief engineer of the Provincial Water Resources Department, the Planning Department of the Provincial Water Conservancy and Hydropower Technology Center, relevant leaders and experts from municipal water affairs, development and reform, finance, forestry and Meijiang District. Vice Mayor Li, Deputy Secretary General Zhang Hui met him.
Participants surveyed the project site, listened to the report of the provincial water conservancy and hydropower design institute on the design results, and discussed and considered the project proposal report in groups. The meeting held that the project proposal report of Meinan Water Control Project has reached the design depth requirement at this stage, and some contents need to be supplemented to form a preliminary review opinion. After the design unit improves the project proposal, it will be reported to the Pearl River Water Conservancy Commission of the Ministry of Water Resources for verification as soon as possible and submitted to the Provincial Development and Reform Commission for approval.
It is a major water conservancy infrastructure construction project in our city. It consists of four medium-sized reservoirs, including Tianye Reservoir, Meinan Reservoir, Lanxi Reservoir and Rice Reservoir, with a total investment of about 654.38+0.34 billion yuan. It is a water conservancy project combining comprehensive utilization of water supply and flood control with irrigation and power generation, with a total storage capacity of 57 million cubic meters. After the project is completed, it can protect the flood control safety of industrial enterprises in five towns in Meixian District and Meijiang District 1.8 million people and 1.0 households, and increase the irrigation area by 50,000 mu. At the same time, it can comprehensively improve the water supply guarantee rate of Meizhou City and Meizhou High-tech Development Zone, which plays a very important role in promoting the sustainable economic and social development of our city.