What thermal power plants are there in Yunnan?

1, Qujing Power Plant

The construction scale is 4×300MW coal-fired thermal generator set, which will be constructed in two phases. The 2×300MW units of the first phase project were put into operation in February 1998 and February 12 respectively. In the second phase of the project, 2×300MW units were expanded, and the two units were put into operation in June 2003 +2003 10 and May 2004 respectively.

2. Yunnan Xuanwei

Established in 1958, the first 25MW unit was put into operation in 1960. After the fourth phase of construction, four 25MW units and two 50MW units will be built in 1978, with a total installed capacity of 200MW. In March 2000, Yunnan Xuanwei Power Plant was transformed into Yunnan Xuanwei Power Generation Co., Ltd., and in June 2002, it was transformed into Guodian Xuanwei Power Generation Co., Ltd., which was controlled by Guodian Power Development Co., Ltd.

3. Yunnan Yangzonghai Power Plant

The total installed capacity of the old plant is 60 MW, which consists of 5 12 MW units. 1955 After the Bandung Conference, Premier Zhou Enlai listened to the report on the local coal and water resources when passing through Yangzonghai, and immediately instructed to develop and utilize them as soon as possible. Yangzonghai Power Plant started construction on 1959, and all five units were installed and put into operation on 1960.

4. Kaiyuan Power Plant

The 2× 300,000 kW project of Kaiyuan Power Plant is one of the key thermal power construction projects in the strategic deployment of "Power Transmission from West to East", the Tenth Five-Year Plan of Yunnan Electric Power Development and the 20 15 long-term plan, and it is also the first 300,000 kW circulating fluidized bed boiler project in China determined by the National Development and Reform Commission. This project is the first thermal power project controlled by Datang International Power Generation Co., Ltd. in Yunnan Province.

5. Kunming Power Plant

Kunming Power Plant in Yunnan Province, which belongs to Yunnan Electric Power Group Co., Ltd., is a national first-class thermal power generation enterprise. /kloc-0 was completed in August, 1956, and power was generated in February, 1957. After three phases of reconstruction and expansion in 46 years, the installed capacity is 2× 100MW, which is the backbone power supply point of Kunming Load Center of Yunnan Power Grid.

Baidu Baike SDIC Qujing Power Generation Co., Ltd.

Baidu Baike Guodian Xuanwei Power Generation Co., Ltd.

Baidu Baike Guodian Yangzonghai Power Generation Co., Ltd

Baidu Encyclopedia Yunnan Datang International Honghe Power Generation Co., Ltd.

Baidu Baike Kunming Power Plant