(2)165438+ in March, 1996 to165438+ in February, 1998, completed the information system for the ground construction of Daqing Oilfield of China Petroleum and Natural Gas Corporation;
(3) From August1996 to February 1998, the database file format of Daqing Oilfield Surface Construction Information System was completed by Daqing Petroleum Administration Bureau, bureau level and moderator;
(4) From 1996 to 10 to 1997 to 12, Daqing Oilfield Graphic Management Information System, Daqing Petroleum Administration Bureau, bureau level and participants have been completed;
(5) From June1June to February, 19971June, 1999, Daqing Petroleum Administration Bureau, bureau level and participants completed the analysis and research on the adaptability of the surface facilities built in the oilfield to tertiary infilling wells;
(6)1March 1997 to 65438+1February 1998, completed Daqing Oilfield Surface Construction Attribute Data Collector selected by Daqing Oilfield Design Institute;
(7) From 1998 1 to 1999 65438+2 months, Daqing Oilfield Electric Power Geographic Information System, Daqing Petroleum Administration Bureau, bureau level, participant, has been completed;
(8)1March, 1999 to August, 200 1 year, Daqing Petroleum Administration Bureau, bureau level and moderator completed the popularization and application of Daqing Oilfield surface construction information system;
(9) From March 2000 to September 2000, the Tenth Five-year Plan for the Development of Oilfield Surface Engineering Science and Technology, 2006-20 10, 201-2020 Science and Technology Development Ideas have been completed, and Daqing Petroleum Administration Bureau has participated in it;
(10) From May 2000 to August 2006, 5438+0, the research on simulation and optimization software of surface engineering in Daqing Oilfield was completed by Daqing Petroleum Administration Bureau, with bureau level and participants;
(11) From June 2000 10 to August 2006, the optimization research of 5438+0 multiphase transportation process parameters was completed by Daqing Petroleum Administration Bureau, with the director at the bureau level;
(12) From 1 in 2002 to 12 in 2003, the research and development of the virtual geographical environment system (200 135 130) was completed by the Ministry of Science and Technology, with provincial and ministerial level.
(1 3) From 20021to 2004 12, the virtual regulation experiment of groundwater exploitation and land subsidence in the Yangtze River Delta (40 17 1075) was completed by the National Natural Science Foundation of China, a national participant;
(14)2003 1 to 2005 12, Geographic Information System for Field Archaeological Excavation, Nanjing Normal University, bureau level, participant, completed;
(15) From 1 in 2005 to 12 in 2007, the research on multi-source data fusion of urban underground three-dimensional space (4047110/) was completed by the National Natural Science Foundation of China, a national participant;
(16) From April 2005 to April 2006, the research on intelligent spatial data mining method oriented to vector graphic features (2005037743) funded by China Postdoctoral Fund Committee was completed;
(17) From April 2005 to April 2006, the research on intelligent spatial data mining method for vector graphic features (05010/9b) funded by Jiangsu Postdoctoral Fund Committee was completed;
(18) From June 2005 to February 2007, the Education Department of Jiangsu Province completed "Research on Multi-source Spatial Data Mining Method of Settlement Archaeology Based on Time Series" (05KJD 170 109).
(19) Research on 3D modeling and simulation of prehistoric settlement sites from February 65438, 2006 to February 65438, 2009, Jiangsu Provincial Department of Education, bureau level (blue plan), moderator, ongoing;
(20) From June 2006 1 1 to June 2009 1, Jiangsu Provincial Department of Education completed "Research on Three-dimensional Modeling and Simulation Method of Jiangzhai Phase I Settlement", bureau level;
(21) From August 2007 to February 2008, the overall design scheme of data mining in Xinjiang Oilfield was completed by Xinjiang Oilfield Co., Ltd., with the director at the bureau level;
(22) 65438+From February 2007 to May 2008, the enterprise horizontal project Taiya Technology Co., Ltd. and the mainframe completed the development of meteorological disaster early warning information publishing platform;
(23) From March 2007 to June 5438+February 2009, Nanjing Normal University completed the Research on Mining Method of Terrain Elements of Prehistoric Settlement Sites in Remote Sensing Images.
(24) From September to June, 2008, on 20 1 1, the Organization Department of Jiangsu Province and the provincial and ministerial level (6 people) were conducting the Research on Meteorological Information Fusion Method of Rainstorm Weather Early Warning;
(25) From June 10 to September 20, 200811,Research on Evaluation Methods and Technologies of Meteorological Services, China Meteorological Bureau, provincial and ministerial level (industry special);
(26) From June 5438+0, 2009 to February 2009 1, the time series EMD analysis and prediction system of science and technology popularization projects of China Meteorological Bureau, with the provincial and ministerial level as the second moderator, is under way.
(27) On June 20th, 20091KLOC-0/65438+February, the cooperation project "Network Vulnerability Mining and Analysis" of Beijing University of Posts and Telecommunications was completed.
(28) From April 38+February, June 5, 2009 to April 38+February, June 2000, the development of lightning disaster risk assessment system hosted by Chongqing Schet Research Institute was completed.
(29) From February 65438, 2009 to March 2000, 2065438+ completed the overall design scheme of the guidance system of Pudong Exhibition Hall, a cooperative project of Shanghai Huabo Company.
(30) From March 30)20 10/0 to September 2065 438+00, the guidance system of Pudong Exhibition Hall, a cooperative project of Shanghai Huabo Company, was developed.
(3 1)20 10 September to 201/kloc-0 March, completed the maintenance service of the guidance system of Pudong Exhibition Hall, a cooperative project of Shanghai Huabo Company.
(32) From 2011to 20 13, 65438+February, the National Natural Science Foundation project "Research on the Spatio-temporal Evolution of Settlement Sites", with the project number of 4 107 1253, has been completed.