While building and producing, the whole Jiuyang is a big production workshop and a big construction site. Invest 600 million yuan to build a 654.38+500,000-ton medium and wide band steel production line. The project fills the market gap within the specification range of 550 mm-950 mm in the province, with an added output value of 5.4 billion yuan and an added profit and tax of 500 million yuan. The construction of special railway lines with an investment of 200 million yuan can reduce the transportation cost by 654.38+0 billion yuan every year after completion.
With the continuous expansion of the company's scale, the construction of Jiuyang Industrial Park has been put on the important agenda. Xu Qingkui, Party Secretary of Jiuyang Company, said: "Cities and towns provide a good environment for our development. There is no reason why we should not speed up development. Building Jiuyang Industrial Park is the only way for the company to improve its market competitiveness and build a high-quality steel production base. " At present, the park has achieved five connections and one leveling. In 2009, Jiuyang Company invested more than 2 billion yuan, built more than a dozen large projects, and realized the company's scale expansion.
As a large-scale enterprise with a production capacity of over 10 billion, Jiuyang Company continues to do a good job in circular economy and realize sustainable development. The company has successively built two TRT residual pressure power generation projects of blast furnace, two boiler residual pressure residual energy power generation projects and a 6000KW waste heat combustion power generation project. Four of the above five power generation projects have been designed, greatly increasing the company's benefits.