654.38 million tons/day tap water supply system has been built in the water supply park. An industrial water plant with a water supply capacity of 300,000 tons/day is under planning and construction.
A number of1110kv and 220KV substations have been built in the power supply park, all of which adopt double-circuit uninterrupted power supply, and a 500KV power supply system is being planned.
The steam park adopts centralized steam supply, and two thermal power plants have been built with a steam supply capacity of 490 tons/hour.
The natural gas park plans to build a high-pressure natural gas pipeline to provide high-quality natural gas with a design pressure of 4.0 MPa.
A sewage treatment plant with a daily processing capacity of 300,000 tons has been put into operation. The park also has supporting facilities such as solid waste incineration and landfill treatment.
There are telecom sub-bureaus and post sub-bureaus in the communication park, and fixed telephone, mobile communication, broadband and cable TV are all available.