Full name Dongfang Electric (Guangzhou) Heavy Machinery Co., Ltd.
Dongfang Electric (Guangzhou) Heavy Machinery Co., Ltd. (hereinafter referred to as "Dongfang Heavy Machinery") is the holding company of China Dongfang Electric Group Co., Ltd., the seaport base of the group company and the domestic manufacturing base of large-scale nuclear power equipment with world advanced level. The company was established on May, 2004 17, covering an area of * * * 400,000 square meters, and located in Nansha, Guangzhou, where the land and water transportation is very convenient, with more than 740 employees.
In September 2006, the first and second phases of Dongfang Heavy Machinery were fully completed and put into operation. At present, it has the hoisting capacity of 1400t, the internationally advanced heavy workshop and the 3000t-class wharf, and more than 1000 sets of world-class heavy machinery processing equipment, welding equipment and physical and chemical inspection equipment. The company's plant and equipment can fully meet the requirements of China's "second generation plus" nuclear power plant and the third generation. At the same time, the company has obtained ISO900 1 quality system certification, American ASME pressure vessels U, U2, N, NPT manufacturing steel seal and authorization certificate, A 1, A2 pressure vessel design and manufacturing qualification license, passed the qualification evaluation of the welder and welding operator training examination committee of civil nuclear pressure equipment, and became the only training base for welder and welding operator of civil nuclear pressure equipment in Central and South China.
The company took the lead in manufacturing the main equipment of nuclear island of nuclear power plant, such as 1000MW reactor pressure vessel and steam generator, and has now formed the manufacturing capacity of three sets of nuclear island equipment of 1000MW pressurized water reactor nuclear power plant. The first domestic 1000MW nuclear reactor pressure vessel manufactured by Dongfang Heavy Machinery Co., Ltd. was successfully delivered to Ling 'ao Phase II Nuclear Power Station on June 15, 2009, which was highly praised by national, provincial and municipal leaders. As of July 2009, Dongfang Heavy Machinery has successfully manufactured 6 steam generators, 1 reactor pressure vessels and 2 steam-water separation reheaters and delivered them to the installation site. The manufacturing progress and quality of the products have been well received by the owners.
In order to meet the needs of the rapid development of nuclear power in China, Dongfang Heavy Machinery has successively carried out the first phase reconstruction project and the third phase expansion project. In July 2009, the first phase improvement project was put into use, and the third phase project is planned to be put into use in the first half of 20 10. After the expansion is completed, Dongfang Heavy Machinery will reach the annual production capacity of four sets of nuclear island equipment in 1000MW PWR nuclear power plant.
Adhering to the corporate philosophy of "serving the country with dedication and leading the way with Excellence", Dongfang Heavy Machinery Co., Ltd. advocates and implements the employee principle of "everything is supervised, everything is responsible, everything is supervised and everything is well documented", and will, as always, take "China Equipment and Equipment China" as its own responsibility, produce nuclear power products with the best quality, the safest use and the most satisfactory users, continuously improve the independent innovation capability, and strive to improve the localization rate of nuclear power equipment.
Address: No.313, Lianxi Avenue, huangge town, Nansha District, Guangzhou, Guangdong.
Postal code: 5 1 1455
Tel: 020-3468305 1