The old reconstruction project of Hezheng Baoyuan Village has a total land area of about 57,000 square meters, a construction land area of about 45,234.98 square meters, a plot ratio of 4.95, and a total construction area (excluding the overhead floor area) of about 33 1520 square meters, including about169,450 square meters for residential buildings and about 70,000 square meters for commercial buildings. Part of the residential construction area ranges from small-sized units of about 44 square meters to large-sized units.
The project plans to complete the pile foundation project before the end of September 2009, complete the basement construction in mid-February of 20 10, and complete the acceptance in early March of 20 12. On the morning of March 8, 2009 10: 00, the old city reconstruction project of Baoyuan Village and Zhengbaoyuan Village in Baoan District of Shenzhen started. Relevant leaders and employees of China Nuclear Industry Construction Group Corporation, Shenzhen Baoyuan Joint-stock Cooperation Company and Shenzhen Hezheng Real Estate Group Co., Ltd. attended the groundbreaking ceremony. Architectural design: Hong Kong Wangdong International Co., Ltd. and Huasen Architectural Engineering Design Consulting Co., Ltd. Landscape design: Shenzhen Huayuxin Practice International Landscape Design Co., Ltd.