Historical evolution of Wuhu Xinxing Casting Pipe Co., Ltd.

Wuhu Xinxing Casting Pipe Co., Ltd. was jointly funded by Xinxing Jihua Group and Xinxing Casting Pipe Co., Ltd., and was reorganized by Wuhu Iron and Steel Plant and Wuhu Coking Gas Co., Ltd. The company was officially listed on April 27, 2003 with a registered capital of 500 million yuan.

Wuhu Xinxing Casting Pipe Co., Ltd. is located on the Qingyi River in the southeast of Wuhu City, with obvious geographical advantages. The factory railway can connect Beijing-Guangzhou line, Beijing-Kowloon line and Beijing-Shanghai line; Expressway goes directly to Nanjing, Shanghai, Hefei, Hangzhou and other cities; Wuhu Port is a good deep-water port of the Yangtze River, and it is also a transit distribution center for raw fuel. Water can enter Sichuan along the Yangtze River, be sent to Suzhou and Shanghai, and be transported all over the world by sea. The company covers an area of 850,000 square meters and employs more than 2,500 people. After the reorganization of WISCO, the company plans to invest 654.38+0.2-654.38+0.3 billion yuan in three to four years, and build Wuhu into an annual production capacity of 6.5438+0.2 million tons of pig iron, 800,000 tons of special steel and 350,000-400,000 tons of ductile cast pipes. Sales revenue exceeds 3.5 billion, and profits and taxes exceed 600 million.

After the establishment of the company, a three-step development strategy has been formulated: the first step is to transform the ironmaking blast furnace and ironmaking front-end system, and the environmental treatment will meet the standards. A series of technical reforms have been carried out in blast furnace, sintering, coking, power supply system, public supporting projects and comprehensive ironmaking projects. The annual output of pig iron increased from 330,000 tons to 6.5438+200,000 tons, sinter from 600,000 tons to 6.5438+500,000 tons, and coke from 6.5438+300,000 tons to 560,000 tons. All economic and technical indicators have reached the advanced level of similar enterprises. The investment in the treatment of "three wastes" is 65.438+0.4 billion yuan, accounting for 654.38+0.9% of the total investment. The environmental protection "three simultaneities" project of the first-phase technical transformation project passed the evaluation and acceptance of the Municipal Environmental Protection Bureau, and the main pollutants of flue gas (dust), SO2 and wastewater reached the standard. The second step is to develop centrifugal ductile iron pipes. On July 1 day, 2004, a newly-built ductile iron pipe workshop with an annual output of 400,000 tons was put into operation in just nine months. It is the largest and most advanced single ductile iron pipe workshop in the world. The product specification is DN 80 mm- 1400 mm, and the whole production line is controlled by computer. The total investment in the first and second phases of technical transformation is 769 million yuan. 10 On June 8th, the completion ceremony of Wuhu Xinxing Casting Pipe Project and the commissioning ceremony of Xinxing Casting Pipe Co., Ltd.' s million-ton project were held in Wuhu, marking that Xinxing Casting Pipe Co., Ltd. has formed a production capacity of more than one million tons of cast pipes, ranking first in China and first in the same industry in the world. The third step is to develop large-diameter thick-walled seamless steel pipes. The research on centrifugal casting tube blank-radial forging large-diameter seamless steel tube casting process and other related production processes and equipment is being carried out to replace the traditional production process of seamless steel tube and fill the blank of industrial production of large-diameter thick-walled seamless steel tube in China. The project has been included in the second batch of key scientific and technological projects in the second phase of the Tenth Five-Year Plan in Anhui Province, and has been officially approved by the state.