I need a complete set of accounts such as cost accounting statements and cost statements of industrial enterprises, thank you.

monthly report

First of all, the bladder garage

Production line output (only) Direct materials Direct labor manufacturing expenses Total waste loss last month (yuan)

Direct materials 1

Direct labor 2

Manufacturing cost 3

Irreparable reduction

Waste loss 4

Transfer to the waste network

Loss 5

Qualified products this month

Enter the library 6

Unit cost 7

8 Second, the Chinese gallbladder bank.

9. Total loss of direct materials, direct labor costs and waste products for output (parts)

Direct material 10

Direct labor 1 1

Manufacturing cost 12

Irreparable reduction

Waste loss 13

Transfer to the waste network

Loss 14

Qualified products this month

Enter the library 15

Unit cost 16

17 three. Basketball garage

18 Total direct labor cost and waste loss of production (pieces) direct materials.

Direct materials 19

Direct labor 20

Manufacturing cost 2 1

Irreparable reduction

Waste loss 22

Transfer to the waste network

Loss 23

Qualified products this month

Library entry 24

Unit cost 25

The total production cost is 26.

Date of completion of general issuance: year month day.

Product production cost calculation table

expense

At the beginning of the project, the product cost at the beginning of the month, the production cost of this month, the cumulative cost distribution rate of production costs, the cost of finished products at the end of the month, and the product cost.

Quota actual quota actual

1 2 3 4=2+3 5=4/6+8 6 7=5*6 8 9=5*8

direct material

direct labor

production cost

Combination plan

Scrap loss calculation table

Workshop unit: yuan

The total direct labor manufacturing cost of the project output (only) direct materials.

end product

expense

Cost allocation rate

Waste cost

Net loss of waste products

Summary of raw material consumption

Product name scale quantity unit price amount

Summary of manufacturing expenses

unit

Product name fee

Total score ratio bladder

Workshop tire workshop blue ball workshop general plan

Employee compensation

enterprise administrative expenses

depreciation cost

water rate

electricity bill

fuel

repair charge

Labor protection expenses

Machine material consumption

hardware fitting

Combination plan