First of all, the bladder garage
Production line output (only) Direct materials Direct labor manufacturing expenses Total waste loss last month (yuan)
Direct materials 1
Direct labor 2
Manufacturing cost 3
Irreparable reduction
Waste loss 4
Transfer to the waste network
Loss 5
Qualified products this month
Enter the library 6
Unit cost 7
8 Second, the Chinese gallbladder bank.
9. Total loss of direct materials, direct labor costs and waste products for output (parts)
Direct material 10
Direct labor 1 1
Manufacturing cost 12
Irreparable reduction
Waste loss 13
Transfer to the waste network
Loss 14
Qualified products this month
Enter the library 15
Unit cost 16
17 three. Basketball garage
18 Total direct labor cost and waste loss of production (pieces) direct materials.
Direct materials 19
Direct labor 20
Manufacturing cost 2 1
Irreparable reduction
Waste loss 22
Transfer to the waste network
Loss 23
Qualified products this month
Library entry 24
Unit cost 25
The total production cost is 26.
Date of completion of general issuance: year month day.
Product production cost calculation table
expense
At the beginning of the project, the product cost at the beginning of the month, the production cost of this month, the cumulative cost distribution rate of production costs, the cost of finished products at the end of the month, and the product cost.
Quota actual quota actual
1 2 3 4=2+3 5=4/6+8 6 7=5*6 8 9=5*8
direct material
direct labor
production cost
Combination plan
Scrap loss calculation table
Workshop unit: yuan
The total direct labor manufacturing cost of the project output (only) direct materials.
end product
expense
Cost allocation rate
Waste cost
Net loss of waste products
Summary of raw material consumption
Product name scale quantity unit price amount
Summary of manufacturing expenses
unit
Product name fee
Total score ratio bladder
Workshop tire workshop blue ball workshop general plan
Employee compensation
enterprise administrative expenses
depreciation cost
water rate
electricity bill
fuel
repair charge
Labor protection expenses
Machine material consumption
hardware fitting
Combination plan