Project Overview of Shanxi International Energy Group Hong Guang Power Generation Co., Ltd.
For Liansheng coal gangue power generation project, the Provincial Development and Reform Commission submitted the application report of Liansheng 2× 135MW coal gangue power generation project to the National Development and Reform Commission with the documentNo. [2005] 15. According to the Reply of the General Office of the National Development and Reform Commission on the Construction of Coal Gangue Power Plant Project of Shanxi Liansheng Energy Co., Ltd., and the demonstration of China International Consulting Company, the single unit capacity of this project is changed from 2× 135MW to 1×300MW domestic circulating fluidized bed boiler unit. As a national demonstration project of 300MW circulating fluidized bed boiler power station, the planned capacity is considered as 2×300MW, and 65438+ will be built first in this phase. The National Development and Reform Commission identified our company's 1×300MW unit as the national planned construction project in the document Energy [2007] 1985. On April 13, 2008, Shanxi Power Grid Corporation completed the review of the access system of our 2×300MW coal gangue power generation project, and agreed that our 500,000 lines should be connected to the 500,000 booster station of Shanxi International Huaguang Power Generation Co., Ltd. In June, 2008165438+1October, 65438+September, State Grid Corporation agreed to connect our company to the North China power grid, and after the project was put into production, it could digest 2965438+ ten thousand tons of coal gangue, coal slime and 65438+ten thousand tons of limestone every year. The water source is mine drainage, and 85% of the water source can be saved by direct air cooling steam turbine with subcritical parameters. Environmental protection facilities such as limestone desulfurization circulating fluidized bed boiler and high-efficiency bag dust collector are adopted to make SO2 emission concentration less than 200㎎/m3, soot emission concentration less than 53.5㎎/m3 and NOX emission concentration less than 350㎎/m3, which meets the national environmental protection requirements. This project was built by the general contractor. The total investment of the project is about 2.8 billion yuan. After the project starts, the first phase of construction will last for 24 months. After the first and second phases are completed and put into operation, the annual power generation is 3.6 billion kWh, the sales income is 870 million yuan, the profit is 654.38+82 billion yuan, and the profits and taxes are paid to 270 million yuan, providing employment opportunities for the local labor force. The project has completed the EPC general contracting bidding, signed a general contracting agreement with Zhongnan Electric Power Design Institute and signed three main supply contracts with Dongfang Electric Group. Complete the bidding for the first to fifth batches of auxiliary machines; And in June 20 10, 2 1 year, the first batch of concrete was poured. The planned construction period of this project is 19 months, of which 1 # unit is planned to be put into trial operation in February 2065, with 438+065,438+0, and it is planned to be put into production with two units in February 2065, with 438+02.