Power Ranking of China Power Construction 16 Bureau

The strength ranking of China Power Construction 16 Bureau is as follows:

1. No.1 Hydropower Bureau was established in 1958 and its headquarters is in Changchun City, Jilin Province.

2. The Second Hydropower Bureau was established in 1958, formerly known as Yongdinghe Hydropower Engineering Bureau of the Ministry of Water Resources and Electric Power.

3. The Third Water Power Bureau was established in June, 1956, originally under the State Power Company.

4. 1958, 10 In June, in order to build Liujiaxia, the first hydropower station in China, the General Administration of Hydropower Construction of the Ministry of Water Resources and Electric Power issued a document to establish Liujiaxia Hydropower Engineering Bureau and Yanguoxia Engineering Bureau, referred to as Liujiaxia Engineering Bureau for short.

5. The Fifth Hydropower Bureau is one of the earliest and largest subordinate hydropower construction enterprises in China after the founding of New China. Its predecessor has successively gone through the Third Mechanical Engineering Corps of the General Administration of Engineering of the Ministry of Water Resources, Gangnan Reservoir Engineering Bureau, Yuecheng Reservoir Engineering Bureau of the Ministry of Water Resources and Electric Power, and Bailongjiang Hydropower Engineering Bureau of the Ministry of Water Resources and Electric Power.

6. The Sixth Hydropower Bureau was established in 1958. In the course of nearly 60 years, with the change of management system, the company changed its name many times.

7. The predecessor of the Seventh Hydropower Bureau was Guanting Reservoir Engineering Bureau of the Ministry of Water Resources, and 1955 was renamed as the First Mechanical Engineering Corps of the Ministry of Water Resources, which was subordinate to the Ministry of Water Resources.

8. The Eighth Hydropower Bureau, formerly known as the Engineering Corps of the Yangtze River Water Conservancy Commission, was founded in 1952, and 1992 was renamed as the Eighth Engineering Bureau of China Water Resources and Hydropower.

9. The Ninth Hydropower Bureau originated from Guizhou Plateau. To be exact, it originated from the development of maotiaohe Valley in Guizhou.

10, No.10 Hydropower Bureau was born in Changshou Lion Beach, the first hydropower station in New China, and grew up in Dujiangyan, a water conservancy project that has been praised for centuries. Its predecessor was 1950 Southwest Hydropower Engineering Office led by Southwest Military and Political Committee. 1954 changed to Shizitan Hydropower Engineering Bureau.

1 1. The 11th Hydropower Bureau, formerly known as Sanmenxia Engineering Bureau of the Yellow River, was established in 1955 and 65438+February. It is the first mechanized hydropower construction team approved by the State Council after the founding of New China, and is known as the cradle of hydropower construction in New China.

12. The 12th Hydropower Bureau was formerly known as Xin 'anjiang Hydropower Engineering Bureau of the Ministry of Electric Power Industry, and was established in March 1956.

13. The 13th Hydropower Bureau was formerly known as Majiahe Engineering Bureau of the Ministry of Water Resources and Electric Power, and was established in 1962.

14. XIV hydropower bureau was formerly known as Yunnan hydropower engineering bureau, which was founded in 1954.

15. The predecessor of China 15th Hydropower Bureau was Shaanxi Hydropower Engineering Bureau, which was established in 1952, and was incorporated into China Hydropower Group in 2005.

16. The 16th Hydropower Bureau was formerly known as China Minjiang Engineering Bureau, and was established on the basis of the former Ministry of Fuel Industry 1 0/957.

Brief introduction to the background of No.1 Hydropower Bureau

No.1 Hydropower Bureau was established in 1958. For more than 60 years, the company has established itself locally and served the whole world. Mainly engaged in investment, construction and operation in the fields of energy and electricity, infrastructure, water resources and environment at home and abroad.

The No.1 Hydropower Bureau has more than one professional contracting qualification 10, such as national water conservancy and hydropower engineering construction general contracting level, municipal public works construction general contracting level, building engineering construction general contracting level, electromechanical engineering construction general contracting level, highway engineering construction general contracting level, power engineering construction general contracting level, basic engineering professional contracting level, highway subgrade engineering professional contracting level, building decoration engineering professional contracting level, etc. ..

It also has Grade A qualification of engineering design in water conservancy industry, Grade A qualification of geotechnical engineering and Grade A qualification of concrete engineering for water conservancy engineering quality inspection.

Reference to the above contents: Brief introduction of official website-China First Engineering Bureau of Water Resources and Hydropower Co., Ltd.