What is the largest nuclear power plant in China? Which power station has the largest annual output?

Shenzhen Daya Bay Nuclear Power Station is the largest nuclear power station in China at present.

Daya Bay Nuclear Power Station started construction on August 7th, 1987/KLOC-0, which is the first large-scale commercial nuclear power station in Chinese mainland. Prior to this, 19821February, the state officially approved the construction of Daya bay nuclear power plant. Based on the principle of "loan construction, electricity sales and repayment, and joint venture", Guangdong Nuclear Power Investment Co., Ltd., a subsidiary of China Guangdong Nuclear Power Group Co., Ltd., and Hong Kong Nuclear Power Investment Co., Ltd., a subsidiary of Hong Kong China Light and Power Co., Ltd., set up a joint venture company to be responsible for the construction and operation of Daya Bay Nuclear Power Station.

1985 1 month 19, the chief architect of reform and opening up met with Lord Jia Luo, chairman of China Light and Power Company Limited, and his party in the Great Hall of the People. During the meeting, he pointed out that the Daya Bay Nuclear Power Station jointly built by Guangdong and Hong Kong is "of great significance to maintaining the prosperity and stability of Hong Kong and enhancing the confidence of Hong Kong people" and "it is necessary to pay close attention to the construction and achieve early results".

1In August, 1987, the main project of Daya Bay Nuclear Power Station was officially started. After nearly seven years of construction,1May 6, 1994, Daya Bay Nuclear Power Station with two PWR nuclear power units with an installed capacity of 984,000 kilowatts was fully built and put into commercial operation. 70% of the electricity produced was sold to Hong Kong and the rest to Guangdong. Since then, a steady stream of powerful current has lit up thousands of lights on both sides of Xiangjiang River.

Daya Bay Nuclear Power Station has maintained safe and stable operation since it was put into operation for thirteen years, which not only created good economic benefits, but also produced good environmental protection benefits. If the 1 20 billion kwh of electricity transported to Hong Kong is produced by coal-fired power plants, it will consume about 44 million tons of standard coal and emit about1100 million tons of carbon dioxide and 370,000 tons of sulfur dioxide.

Of course, the Three Gorges has the largest output power.

Three Gorges Left Bank Power Station 14 units have all been put into operation, with a total installed capacity of 9.8 million kilowatts. The right bank power station is expected to complete the installation of all 12 units in 2007-2008. The commissioning of the left bank power station unit is as follows:

Zuo 'an 1 unit, with an installed capacity of 700,000 kilowatts, was put into production on 22 October 2003/KLOC-0.

Unit 2 on the left bank has an installed capacity of 700,000 kilowatts and was put into operation on July, 2003 10.

Unit 3 on the left bank has an installed capacity of 700,000 kilowatts and was put into operation on August 18, 2003.

Unit 4 on the left bank has an installed capacity of 700,000 kilowatts, which was put into operation on October 28th, 2003/KLOC-0.

Unit 5 on the left bank has an installed capacity of 700,000 kilowatts and was put into operation on July 16, 2003.

Unit 6 on the left bank has an installed capacity of 700,000 kilowatts, and was put into operation on August 3, 20031day.

Unit 7 on the left bank has an installed capacity of 700,000 kilowatts and was put into operation on April 20, 2004.

Unit 8 on the left bank has an installed capacity of 700,000 kilowatts and was put into production on August 24th, 2004.

Unit 9 on the left bank has an installed capacity of 700,000 kilowatts and was put into operation on September 7, 2005.

The left bank 10 unit has an installed capacity of 700,000 kilowatts and was put into production on April 7, 2004.

Zuo 'an 1 1 unit with an installed capacity of 700,000 kilowatts was put into production on July 26th, 2004.

Zuo 'an 12 unit has an installed capacity of 700,000 kilowatts, which was put into operation on October 22nd, 2004.

The left bank 13 unit has an installed capacity of 700,000 kilowatts and was put into production on April 24th, 2005.

The left bank 14 unit has an installed capacity of 700,000 kilowatts and was put into production on July 2, 2005.