Property name: Hangzhou, Shanghai, Shanghai, Shanghai
Bus lines: Wangjiadou: No.389, No.8 section of B branch road and No.8 section of B branch road.
Lijiajiao: No.389, Section 8 of Branch B, Section 8 of Branch B..
Daijiatang: No.389 Road, No.8 Section of Branch B, No.8 Road of Branch B..
Subway: The project is about 680 meters away from Gouzhuang Station (Jindu North Road Station) where Metro Line 2 and Line 4 meet, and about 500 meters away from Baiyang Station in the north.
Other modes of transportation: Drive 780m along Yugu Road from the west of the city, go straight into Xueyuan Road for 2.5km, go straight into Xueyuan North Road for about 4km, turn left into the auxiliary road of Sixiang West Road for 700m, turn right into Gudun Road for 3.6km, turn right into Jinhui South Road for 330m, and turn right into 430m to reach the project site.
Planning information: It covers an area of 59,640 square meters, with a plot ratio and greening rate of 30%, 22 buildings and 1.460 parking spaces.
Surrounding facilities: Shopping malls: Jindi Plaza Commercial (expected to open in June 20 17), AEON Meng Le City, Xitiancheng, Sandun Xintiandi, Century Lianhua Supermarket, Metro Supermarket, Gangcheng Pedestrian Street and Sandun Food Street.
Banks: China Construction Bank, China Bank, etc.
School: The first phase of the project will be constructed simultaneously 12 class kindergarten, and the north side is separated by the Greentown Yuhua Qinqin School (public) Gudun Road Branch, which officially started in September 20 17.
Hospitals: Xinhua Hospital Branch, Zhejiang Hospital Branch and Zhejiang University Hospital.
(Other) The east side of the project is adjacent to Baiyanggang Natural Lake, the most precious and scarce natural ecological waterscape resource in the north of Hangzhou, and the lakeside is planned as a park land.
(The information contained is for reference only, subject to the information in the sales office. )
Comprehensive and timely real estate information, click to view.