Chongqing Datang International Pengshui Hydropower Development Co., Ltd. is controlled by Datang International Power Generation Co., Ltd. and jointly funded by Chongqing Construction Investment Company, Chongqing Tai Ding Energy Group Co., Ltd., Chongqing Tuoyuan Industrial Co., Ltd., Guizhou Development Investment Company and Guizhou Wujiang Hydropower Development Co., Ltd. The company was formally registered in August 2003. Chongqing Datang has 68 full-time employees, 44 of whom are from tertiary industry companies and labor agreements.
Pengshui Hydropower Station on Wujiang River in Chongqing, which was developed and constructed by the company, is the tenth cascade hydropower station approved by the State Planning Commission to be included in the planning of the mainstream of Wujiang River, and is a key energy project in Chongqing during the Tenth Five-Year Plan. On September 6, 2005, with the approval of the National Development and Reform Commission, construction was officially started. Pengshui Hydropower Station is located in the lower reaches of Wujiang River, and the dam site is located at 1 1km in the upper reaches of Pengshui County in Chongqing, with a linear distance of about 180km from Fuling in Hekou. It is the first 10 step of hydropower development in the mainstream of Wujiang River. This project mainly focuses on power generation, followed by comprehensive utilization of shipping and flood control. The power station is equipped with five large-scale Francis turbine generator sets with a single unit capacity of 350MW, with a total installed capacity of1750 MW; ; The annual average power generation is 6.35 1 100 million kw/h; The total dynamic investment of the project is 2 1.5 1 100 million yuan. It is the second largest project in Chongqing after the founding of the People's Republic of China. Peng hydropower station is the only large hydropower station in Chongqing power grid with annual regulation capacity and scale exceeding one million kilowatts. The power station is close to the load center and has a good geographical location. After the project is completed, it will undertake the tasks of peak shaving, frequency modulation and emergency standby of Chongqing power grid, and play an important role in enhancing the economic and safe operation of power grid and improving the quality of power supply. The construction conditions of the project are very superior, and it has good benefits in power generation, flood control and shipping. It is the backbone power supply to solve the power shortage in Chongqing and its surrounding areas, improve the power structure of Chongqing power grid and solve the problem of peak shaving. At the same time, the power station can not only provide a lot of high-quality electric energy for Chongqing, but also drive the downstream cascade development one after another, and further rationally utilize the Wujiang River hydropower resources.
In September 2005, under the leadership of Datang International Power Generation Co., Ltd., Chongqing Datang International Pengshui Hydropower Development Co., Ltd. realized unified management with Yinpan Hydropower Station under construction (with a total installed capacity of 600,000 yuan and an investment of 6.7 billion yuan) and Shizhu Power Plant Preparation Office of Chongqing Datang Wulong Hydropower Development Co., Ltd. (with a total installed capacity of 600,000 yuan and an investment of 2.7 billion yuan).