Energy Development of Xinjiang Guanghui Industrial Investment (Group) Co., Ltd.

The energy development industry involves the whole process of energy resources investigation, exploration, planning and design, construction, mining and processing, and has gradually become a new leading industry of Guanghui Group. The Group takes listed company Guanghui Co., Ltd. as the bearing platform of clean energy industry, and makes full use of both domestic and foreign resources to form three major energy businesses: natural gas liquefaction, coal chemical industry and oil and gas exploration and development, with LNG, coal and petroleum as the core products and energy logistics as the support. Guanghui, a listed company under Guanghui, has successfully transformed into a listed company focusing on clean energy by investing heavily in the energy field, and has achieved extraordinary results in Shanghai.

Acquisition of internal structural resources and exploration results-Coal: The Group owns two coal mining areas, Hami and Altay, and five coal fields, namely Yiwu, Baishi Lake, Heidingshan, Naodong and Alandao, with accumulated exploration reserves exceeding 65.438+0.297 billion tons; Four major coal mines, Baishi Lake160,000 tons, Dingheishan 5 million tons, Longdong 30 million tons and Alian Road120,000 tons, are under construction.

Resource acquisition and exploration achievements-oil and natural gas: In September 2008, Guanghui Group cooperated with TBM Company of Kazakhstan to explore, develop and produce oil and natural gas resources. In April, 2009, it invested 5.706 billion yuan overseas to build a "Zhaisang Oil and Gas Comprehensive Development Project" to develop Zhaisang oil and gas block in Dongha area. The natural gas block is located in East Kazakhstan, Kazakhstan, adjacent to Jimunai County, with a contract area of 8,326 square kilometers. According to the NSAI evaluation results, the geological resources of crude oil in Zhaisan oil and gas area are165438+878 million tons, and the geological resources of natural gas are 96.4 billion cubic meters. The latest exploration work shows that the potential of Zhaisan swamp, shallow lake area and Maskaya area near Jimunai county is great, which is higher than the evaluation expectation.

Key Project-1, Shanshan LNG Company

In September, 2003, the LNG project with an annual output of 500 million cubic meters was built and successfully operated in Shanshan with an investment of 654.38+575 million yuan. The products are mainly used for peak shaving of urban gas pipeline network, urban transportation and special industrial users, and this clean energy is continuously sold to about 46 cities across the country. By the end of 2065.438+00, the associated gas source in Tuha Oilfield has accumulated to 2.086 billion cubic meters, which has now developed into clean energy.

Guanghui LNG transport fleet Guanghui currently has the largest LNG transport fleet in China, rich experience in LNG vehicle operation and management, and a perfect transportation and distribution system.

Key projects -2. Hami naomaohu coal chemical industry

In May 2007, the first phase of the LNG project with an annual output of 654.38+200,000 tons of methanol/850,000 tons of dimethyl ether and 500 million cubic meters was approved by the National Development and Reform Commission on March 26, 2065.438+00, and was listed as a large-scale coal-to-dimethyl ether demonstration project encouraged by the National Petrochemical Industry Adjustment and Revitalization Plan. The total investment of the first phase project has exceeded 654.38+05 billion yuan (including supporting coal, water resources projects and logistics projects), and the construction period is as long as 4 years. It is expected to be fully put into production in September 2065.438+065.438+0. The second phase of the project plans to continue to invest 28.75 billion yuan to build a liquefied natural gas plant with an annual output of 3 million tons of methanol/65.438+0 million tons of olefins and 65.438+0.52 billion cubic meters of coal. It is planned that the second phase of the project will start construction in the fourth quarter of 201/kloc-0. After the first and second phases are put into production, the annual sales income of * * * is about 2 10000 yuan, which solves the employment problem of 10000 people. After all the projects are completed, Naomaohu Lake in Yiwu County, Hami City will become one of the largest coal chemical production bases in China.

Key projects -3. Zhaisan oil and gas comprehensive development project.

Exploration and development plan: the annual output of crude oil in 20 15 is 5 million tons/year, and natural gas 10 billion cubic meters/year; In 2020, the production capacity will reach crude oil100000 tons/year, and natural gas will reach 3 billion cubic meters/year;

Natural gas capacity planning: 500 million cubic meters of natural gas will be put into production in August of 20 1 1 year; 20 15 annual natural gas production capacity 10 billion m3/ year; In 2020, the natural gas production capacity will be 3 billion cubic meters per year;

Heavy oil productivity planning: shallow layer: average well depth 1300m, successful steam huff and puff test production, initial production of 40t/d; 200,000 tons in 20 1 1 year, 2 million tons in 20 15 year, and keep stable production; Deep layer: the range of well depth is1700-3000m; 20/kloc-2 million tons in 0/5 years and 5 million tons in 2020; Expansion of rolling exploration: 1 1 The exploration area strives for exploration breakthrough, increases reserves and strengthens development; It will reach 1 10,000 tons in 20 15 years and 3 million tons in 2020.

Key projects-4. Jimunai LNG project

Progress in the construction of Jimunai LNG Project The annual output of Jimunai LNG Project is 500 million cubic meters, with an investment of 220 million yuan, 90% of the project design is completed, 70% of LNG storage tanks are installed, and 60% of auxiliary projects such as fire fighting are completed. 20 10 the national development and reform commission approved the cross-border natural gas pipeline, and 20 1 1 completed the gas pipeline construction;

Jimunai LNG Project plans to install long-term equipment in May of 20 1 1 year; Single machine commissioning started at the end of August, and1end of October 1 1 was officially put into production. 20 1 1 It is planned to continue to invest 400 million yuan.

Key projects-5. Fuyun coal comprehensive development project

Guanghui Group uses the rich coal resources in Kamsite area of Fuyun county in Altay region and the water resources of Wulungu River to carry out comprehensive transformation and deep processing of coal. The construction of supporting water conservancy projects and infrastructure construction of living quarters have been fully started. 2011April,10.8 million tons/year coal-to-oil and 4 billion cubic meters/year coal-to-gas projects started in an all-round way; Because of the particularity of coal-to-gas products, it mainly depends on pipeline transportation, and the project construction progress should match the pipeline construction. Guanghui determined that the project construction should be "oil before gas". The coal-to-oil project was completed in August 20 14, and the coal-to-gas project was completed in June 20 15.

Key projects -6. Energy logistics project

20 10 naoliu highway was officially started on may 1 day and officially opened to traffic on September 28th. The newly-built Liugou-Naomaohu Highway is located in Guazhou County, Subei County, Gansu Province and Yiwu County, Xinjiang. The total length of the highway is 479.88 kilometers, including 258.86 kilometers in Hami and 22 1.2 kilometers in Gansu. The total cost is 750 million yuan (including supporting facilities and gas filling stations along the way), and the annual transportation volume is1500-25 million tons. This is the first "Xinjiang Coal Transportation to the East" highway dedicated line put into operation in Xinjiang. At the same time, it also greatly shortens the transportation distance of local agricultural and sideline products through this road, and the transportation advantage is very obvious. In 20 1 1 year, the total coal transportation capacity of Naoliu Highway is planned to be 6 million tons, and in 20 12 year, the total coal transportation capacity will be150,000 tons, which will make the development of Xinjiang Naomaohu coalfield enter a substantive stage.

The energy logistics project around coal transportation and marketing has been launched in an all-round way to prepare for the "big logistics" of Xinjiang coal sold to Hexi Corridor and the national market. "Naohong Railway" has been included in the Twelfth Five-Year Plan, and it is planned to start on 20 1 1 and be completed on 20 13.

It is planned to build coal transit logistics nodes in Gansu and Liugou in Ningxia, and an energy transit terminal in Qidong in Jiangsu. Liugou Logistics Park is expected to be completed in June 20 1 1 year; Qidong Energy Transfer Terminal has preliminarily demarcated 1995 mu of port land and 1050 m coastline, and LNG filling station has been built locally.

Xinjiang Guanghui Group and Shanghai Shenneng Group will spend 37.3 billion yuan to build a comprehensive project of "Guangshen Industrial City" in Zhongwei, Ningxia, with a planned total investment of 37.3 billion yuan, which mainly includes six sub-projects: coal logistics distribution center with 50 million tons in the early stage of construction, ultra-supercritical air-cooled generator set with one million kilowatts, liquefied natural gas transshipment and distribution center with 250,000 cubic meters, and liquefied natural gas compression with 60 million tons in the later stage.

Naohong Railway is designed as a double-track heavy rail electrified railway, which leads from Hongliuhe Station of Lan Xin Railway at the junction of Gan Xin, turns to the northwest, and goes west along the edge of East Tianshan Mountain to Naohaohu Town, Yiwu County, with a total length of 325.26 kilometers. The main line120.25km of coal special railway in Naomaohu mining area has 8 stations.

Key projects -7. The gasification project of Altay in north and south Xinjiang benefiting the people.

On August 20 10, entrusted by the national energy administration, Guanghui distributed LNG energy supply mode and PetroChina pipeline natural gas energy supply mode were both used to solve the problem of gas consumption for residents in southern Xinjiang. According to the Notice of the National Energy Administration on Printing and Distributing the Implementation Opinions on Accelerating the Solution of Energy Supply in Southern Xinjiang (No.2010125), Guanghui Company undertakes gasification projects in Kashgar, Hotan and Zhou Ke, and is specifically responsible for the construction and operation of LNG production and transportation, distributed natural gas filling stations and other facilities; At the same time, take the initiative to undertake gasification projects to benefit the people of Altay region in northern Xinjiang and the people of all ethnic groups in Xinjiang.

Guanghui Gasification Project 2065438+On September 6, 2000, the demonstration project of Guanghui Stock Gasification South Xinjiang Project started; 65438+February 1, the county ignition ceremony was held in the gasification Altay project of Guanghui shares; On February 29th, 65438, Guanghui Co., Ltd. held the foundation stone laying ceremony of gasification in Zhouqu County, Gansu Province, which suffered from the catastrophic mudslide disaster.

20 10 10 The gasification demonstration project in Kashgar, southern Xinjiang was successfully ventilated and ignited.

Key projects -8. Popularize the national "863" automobile gas

In 2009, it undertook the national "863 Key Science and Technology Plan", established independent intellectual property rights through cooperation with scientific research institutions of well-known domestic manufacturers, and invested 654.38+0.5 billion yuan to promote the "863 Vehicle Gas" project in Xinjiang and Hexi Corridor, thus forming the industrialization promotion path of medium and heavy-duty vehicles fueled by LNG. It is planned to build 300 LNG filling stations in 20 10-20 12, and the number of LNG fuel vehicles will reach 10000. It is estimated that 600-800 million cubic meters of LNG will be consumed each year, and 430,000 tons of carbon dioxide can be reduced each year.

Guanghui drafted and formulated the following four enterprise standards:

Standard for Design and Construction of LPG Vehicle Filling Stations Q/XJGH00 1.2009

Technical specification for skid-mounted liquefied natural gas vehicle filling station Q/XJGH 1002.2009

Code for Design and Construction of LPG Vehicle Filling Station Q/XJG H 1003.2009

Technical specification for skid-mounted liquefied compressed natural gas vehicle filling station Q/XJGH 1008+00.

The Twelfth Five-Year Development Plan of Xinjiang was officially released, and the Outline of the Twelfth Five-Year Plan for National Economic and Social Development of Xinjiang Uygur Autonomous Region was released, which planned oil, natural gas, coal, coal chemical industry, railways and pipelines.

Twelfth Five-Year Plan

By 20 15, the crude oil output will reach 33 million tons, the natural gas will reach 45 billion cubic meters, and the oil-gas equivalent will exceed 65 million tons; The crude oil processing capacity is 38 million tons, and the oil reserve capacity is130,000 cubic meters.

By 20 15, Xinjiang's coal production capacity will reach more than 400 million tons, and 50 million tons will be transported abroad.

By 20 15, 2.6 million tons of urea, 800,000 tons of dimethyl ether, 60 billion cubic meters of natural gas, 3.6 million tons of oil, 6.5438 million tons of olefins and 6.5438 million tons of ethylene glycol will be built. During the "Twelfth Five-Year Plan" period, the new coal coking capacity was 8 million tons.