1953 12 which steel company held the groundbreaking ceremony for the three major projects?

1953 12 groundbreaking ceremony for three major projects in Angang was held.

Anshan Iron and Steel Group Co., Ltd. was established on July 9, 1949. Since the first five-year plan 1953, the state has concentrated on the construction of Angang. Angang expanded its production scale, built a large state-owned joint production enterprise, and completed the reconstruction and expansion of 48 major projects on the basis of the original production scale, reaching 2.5 million tons of iron, 3.2 million tons of steel and 2.5 million tons of steel.

During the First Five-Year Plan period, Angang realized 37 key projects such as large-scale steel rolling, seamless steel pipe and ironmaking blast furnace. By the time the first five-year plan 1957 was completed, Angang had been completely transformed and expanded, and its production capacity had exceeded the original planned target. During this period, Wang Chonglun appeared, and he was called a man in advance.

The development course of Anshan Iron and Steel Company;

Anshan Iron and Steel Group, the largest regional subsidiary of Anshan Iron and Steel Group, was established in 19 16, formerly known as Anshan Iron and Steel Works and Showa Steel Works. Angang was established on July 9, 1949. It is the first large-scale integrated iron and steel enterprise and the earliest iron and steel production base in New China, and is known as the cradle of iron and steel industry in New China. As a leader in the development direction of bridge steel in China, Angang has helped New China realize its dream of becoming a bridge power.

1956, New China made a decision to build the Yangtze River Bridge in Nanjing, Jiangsu, connecting the beijing-shanghai railway Line. However, the steel used for bridges that met the design requirements at that time was still blank in China, and the State Council handed over the heavy responsibility of producing and building the steel needed for bridges to Angang. With the development of the times, Angang Manufacturing is also constantly supporting bridges. In the Hong Kong-Zhuhai-Macao Bridge project, the longest sea-crossing bridge in the world, all the 6,543,800 tons of bridge steel provided by Angang were applied to the main body of the bridge project, which once again supported the major engineering construction in China with high quality.

Reference to the above content: Baidu Encyclopedia-Anshan Iron and Steel Group Co., Ltd.