With the strengthening of people's legal awareness, there are more and more occasions where contracts can be used, and it is also very necessary to sign contracts. So what are the common contracts? The following is a simple sand contract model (usually 7) that I have carefully compiled. Welcome to share.
Simple sand contract 1 supplier of party a:
Demand side of Party B:
According to the Contract Law of People's Republic of China (PRC) and relevant laws and regulations, in order to ensure the legitimate rights and interests of both parties, Party A and Party B sign this contract on the basis of equality, voluntariness, honesty and trustworthiness, and jointly abide by the following clauses and strictly perform them.
Article 1: Product Name, Specification and Unit Price
Remarks: (Due to factors such as rising oil price and floor materials, Party A and Party B will negotiate the price separately)
Article 2: Quality Requirements and Technical Standards
The products listed in this contract provided by Party A conform to the Interim Provisions on Durability of Concrete Structures and the Quality Acceptance Standard of Concrete Engineering.
Article 3: Mode of Supply and Acceptance Criteria
Party A is responsible for transporting the materials to the place (mixing station) designated by Party B. After Party B's on-site inspection is qualified, the materials shall be discharged according to Party B's actual receipt or weighing (measured according to national conversion standards or laboratory packaging density).
Article 4: Method of Settlement
Party A shall take100000 yuan as the advance payment. After the advance payment of100000 yuan, Party A shall go to Party B for reconciliation before 25th of each month, and Party B shall pay off all the payment for last month before 5th of the following month.
Article 5: Other Agreements
Party A shall fully bear all expenses (freight, tolls, bridge tolls, etc.). ) and traffic safety during transportation. Party A is mainly responsible for supplying what Party B needs. If Party A cannot guarantee the normal demand of Party B, Party B shall notify Party A in writing, and Party B may temporarily purchase outside after three days after Party A receives Party B's written notice, and Party A shall bear all the responsibilities for the part higher than the contract price (except that Party A cannot guarantee the normal demand of Party B due to irresistible factors). Before the flood season comes, Party A shall prepare sufficient goods. If the expenses increase due to insufficient goods, Party A shall be responsible, and the specific compensation for both parties shall be subject to negotiation.
Article 6: Term of Contract
This contract shall come into effect as of the date of signature, in triplicate, and shall come into effect after being signed or sealed. The term of the contract is one year.
Party A:
ID number:
Party B:
Signature of person in charge:
date month year
Simple sand contract II Party A (buyer):
Party B (Seller):
In view of Party B's willingness to provide Party A with sand from Chengdu, in order to improve the benefit of the project, this contract is hereby concluded through negotiation between both parties for mutual compliance.
1. Destination and delivery method of sand materials sent by Party B:
1, and the destination is Party A's construction yard.
2. Party A shall inform Party B of the required sand quantity one day in advance. After receiving the notice from Party A, Party B shall transport the materials to the designated place of Party A's construction site within the days agreed in the contract ... and provide the specifications, quantity and required delivery time in strict accordance with Party A's plan.
Two. Specifications and prices of supplied materials:
1. Party B shall ensure that the transported sand materials are qualified, and shall not cheat, and deliver them to the construction site with good quality and quantity as required by Party A..
2. The prices of sand materials supplied by both parties through negotiation are as follows:
Sand yuan/square. (If the above prices change, they will increase or decrease according to the increase or decrease of market prices. )
Third, the settlement materials:
1. The actual settlement quantity shall be subject to the quantity approved by the special person after Party A's preliminary quantity acceptance.
2. After the sand is delivered to the site through negotiation between both parties, Party A shall pay the total price of the sand to Party B. ..
Four. Terms agreed by both parties:
1. According to the construction progress, Party A puts forward the supply demand to Party B in advance, and the notice includes written, oral and telephone calls.
2. After Party B delivers the materials on time, Party A shall conduct preliminary inspection in time, confirm the qualified materials in time, and notify Party B to return or replace the unqualified materials.
3. Party B shall supply materials with good quality and quantity on time according to the contract requirements.
4. Party B shall not be responsible for the early or late delivery due to force majeure or natural factors.
5. Other matters:
Verb (abbreviation of verb) Matters not covered in the above contract shall be settled by both parties through consultation.
6. This contract is made in duplicate, with each party holding one copy, which shall come into effect after being signed by both parties.
Signature of Party A:
Signature of Party B:
Date: Year Month Day
Supplier of Simple Sand Contract 3: (hereinafter referred to as Party A)
Demander: (hereinafter referred to as Party B)
According to the Contract Law of People's Republic of China (PRC), Party A and Party B, based on the principle of equality and mutual benefit, have reached the following contract terms on the supply and marketing of products for both parties to strictly abide by:
General situation of sanitary ware and water heating equipment. Sanitary ware and piping equipment, models and settings.
Two. Conditions for Party A to be responsible for quality: national standard.
3. Place and method of delivery: After signing the contract, Party A shall deliver the goods to the designated place as required by Party B. ..
Four. Mode of transportation and expenses: Party A is responsible for the transportation of vehicles and expenses.
Verb (abbreviation of verb) settlement method: Party B shall pay all the contract money by transfer or other means (RMB settlement) within the contract period.
6. Payment time: after delivery, payment will be made within 15 days according to the delivery confirmation number. In case of special circumstances, both parties shall settle it through consultation.
Validity of the contract: valid within 50 days after the contract is signed.
Eight. Liability for breach of contract: If either party breaches the contract, the breaching party shall pay liquidated damages to the observant party in 500 yuan every day.
Nine, other non-human factors caused by special circumstances, the two sides according to the actual situation through consultation, consultation is not consistent, can bring a lawsuit to the people's court of Suzhou Industrial Park.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Simple Sand Contract 4 Party A: (Buyer)
Party B:
According to the Contract Law of People's Republic of China (PRC) and other relevant laws and regulations, Party A and Party B enter into this Contract through friendly negotiation on the basis of voluntariness and equality, and abide by it jointly.
1. Name, quantity, unit of measurement, unit price and amount:
Second, the quality requirements:
1. The supplied sand shall be natural river sand;
2. The silt content is less than 3%, the silt content is less than 1%, and the pebbles and pebbles are less than 2%.
Three. Place and time of delivery: the place of delivery is in the factory area of Gansu Hongliang Leather Co., Ltd., and the delivery time is as required by Party A. ..
Four. Mode of transportation and expenses: Party B shall be responsible for transporting the goods to the place designated by Party A, and the freight and commodity loading and unloading expenses shall be borne by Party B, as well as all safety accidents caused by transportation.
Verb (abbreviation of verb) acceptance method:
1. Party A shall formulate specific acceptance criteria according to industry regulations, and conduct acceptance and measurement accordingly.
2. The quantity stated by Party A shall prevail, but it shall be verified by both parties. Party B has the right to randomly check the weighing at any time. If there is any objection, it must be settled by both parties through consultation.
3. After each batch of goods is delivered to Party A, Party A passes the spot check. However, in the actual use process, if unqualified goods are found, Party B shall replace them and bear all the liabilities for breach of contract.
Settlement method and invoice of intransitive verbs: Party B provides duty-paid invoices, and Party A handles payment procedures for suppliers.
Seven. responsibility for breach of contract
(I) Party B's liability for breach of contract
1. If the quality of the goods delivered by Party B does not meet the requirements, Party B shall be responsible for replacement or return, and all economic losses caused by quality problems shall be borne by Party B, and Party B shall bear the penalty of 10% of the payment.
2. If Party B fails to deliver the goods according to the time notified by Party A, or fails to deliver the goods in time, the penalty for late delivery is 65,438+00% of the current payment.
(II) Party A's liability for breach of contract
1. If the goods are returned midway, Party B shall pay a penalty of 10% of the returned amount.
2. Party A shall take delivery of the goods in time and guarantee the payment. If Party A fails to pay according to the agreement, Party B has the right to stop supplying sand.
Eight. Dispute resolution method
In case of any dispute or dispute during the execution of this contract, Party A and Party B shall settle it through consultation. If negotiation fails, both parties may bring a lawsuit to the people's court where the contract is signed.
Nine. This contract is made in duplicate, one for each party, and shall come into effect after being signed and sealed by both parties.
X. information of both parties.
Party A:
Party B:
date month year
Five sellers of simple sand contract: (hereinafter referred to as Party A)
Buyer: (hereinafter referred to as Party B)
In order to clarify the rights and obligations of both parties, Party B has reached the following terms and conditions through equal and friendly negotiation due to the need of building iron tower foundation production.
1. The quality of sand and gravel required for production provided by Party A to Party B shall meet Party B's quality requirements, and the quantity shall be subject to Party B's on-site receipt, otherwise Party B has the right to terminate the contract.
2. Party B shall purchase the required sand and gravel from Party A in stages according to the production needs. When Party B needs goods, it shall inform Party A of the type, model and quantity of sand and gravel one day in advance. After Party A confirms it, Party A shall deliver the sand and gravel to the place designated by Party B within the next day. During transportation, Party A consciously abides by all traffic laws and regulations. In case of any safety and traffic accidents, all responsibilities shall be borne by Party A, and Party B shall not bear any responsibilities.
3. price; According to the price negotiated by both parties ..
4. Sand and gravel acceptance method: Party B shall inspect the goods before use. If there is any quality problem, it shall notify Party A in writing within 2 days from the date of receiving the goods. After both parties confirm that the sand and gravel are indeed unqualified, Party A shall transport the unqualified sand and gravel back, and bear the freight. Meanwhile, Party A shall replace the qualified sand and gravel within 2 days.
5. During the performance of the contract, Party A has no quality problems and liability for breach of contract, and Party B shall pay Party A the final payment of sand and gravel within one month after both parties terminate the agreement.
6. Party B shall make rolling payment and settle the account at the end of the month. Party B shall also pay Party A the sand and gravel payment of last month before 10 of the following month.
7. After receiving Party A's gravel, Party B shall sign to confirm the quantity, and the receipt issued by Party B's designated personnel shall be used as the settlement basis.
8. Both parties shall strictly abide by this contract. If there is any dispute between the two parties, it should be settled through consultation first. If negotiation fails, it shall be submitted to the people's court for ruling.
9. This contract is made in duplicate, one for each party, and shall come into effect after being signed by both parties.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Simple gravel contract 6 Party A: "hereinafter referred to as Party A"
Party B: hereinafter referred to as Party B.
1. When Party A builds a 3.2km cement road in Xinzhailiang Village, xx Township, it needs to transport sand and gravel. Party B has a large double-bridge car for Party A's gravel transportation. After many negotiations, Party A and Party B reached an agreement that all the 3.2 km cement road required by Party A will be transported by Party B's vehicles. The agreement is as follows.
Two. The specific negotiation details are as follows:
1. The river sand that Party A needs is Wangjiasha. Party A settles the bill for Party B, and Party B transports it to Party A for use.
2. The stone materials used by Party A shall be settled by Party B, per cubic meter 1 10 yuan.
3. Payment method: Party A will pay 50% of the materials and freight paid by Party B to Party A on the spot.
Four. Party A must pay Party B more than 50% of the amount owed by Party A on the 3.2km cement road transported by Party A within 20_ _ _+February 3 1.
5. Party A invites Party B to transport the sand and gravel on the 3.2km road in Xinliang Village, xx Township, and Party B shall not delay Party A's construction materials for any reason, otherwise Party B shall bear the responsibility of shutdown.
6. When Party B starts Party A's normal construction, Party B shall undertake all the gravel transportation business of Party A, and Party A shall not arrange any other vehicles to haul materials into the site (except long-distance gravel). If Party A drives into the site with materials, Party B has no right to interfere. In addition, when Party A breaches the contract, it must settle all the materials and freight at one time.
Seven. The above contract was reached by both parties after careful consideration, and neither party may break the contract or go back on its word for any reason. If either party breaches the contract, it shall bear the penalty of 20% of the total transportation price.
8. This contract is made in triplicate and shall come into effect as of the date of signature.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Simple gravel contract 7 Party A: (hereinafter referred to as Party A)
Party B: (hereinafter referred to as Party B)
In accordance with relevant national laws and administrative regulations, following the principles of equality, voluntariness, fairness, honesty and credibility, after full consultation between Party A and Party B, Party A purchases sand and gravel from Party B for the needs of project construction, and in order to clarify the rights and obligations of both parties, this contract is hereby signed by both parties through equal and friendly consultation for mutual compliance.
1. All the sand required for Party A's engineering construction is purchased from Party B. If Party B's sand cannot meet Party A's engineering needs, Party A can purchase sand from other channels.
2. Content and place of supply:
3. Supply unit price:
Sand: RMB (in words) /m3.
4. Quality requirements and acceptance criteria:
After receiving the goods, Party A shall inspect them before using them. If there are any quality problems, the quality of sand shall be considered as completely qualified from the date of receiving the goods. After both parties confirm that the quality of sand is indeed unqualified, Party B shall transport the unqualified sand back and bear the freight arising therefrom, but Party A shall not bear other responsibilities, and Party B shall replace the qualified sand within days.
Verb (abbreviation for verb) delivery cycle:
Party B shall provide the cubic meters of materials required by Party A to the designated place of Party A every day from the date when Party A issues the material demand form. Supply and demand are 10,000 cubic meters.
The intransitive verb transportation expenses and expenses burden:
The transportation fee and unloading fee shall be borne by Party B. ..
7. Payment and settlement of project funds:
1. The project payment shall be paid in advance at 70% of the total monthly sand supply price. The balance payment shall be paid within months after the completion of the project.
2. After the materials arrive at the site, Party A shall arrange relevant personnel for acceptance in time, and send the delivery note back to Party B after acceptance, so that Party B can settle accounts.
3. Party B shall provide a valid material sales invoice and an account opening bank, and Party A shall remit the payment to the bank account designated by Party B. ..
This contract is made in duplicate and shall come into effect after being sealed and signed by both parties.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
;