Model essay on work summary of ordinary staff in steel structure

For those of us who have just come out of school, it is a trend to enter the society and it is inevitable to adapt to it. We must find a way to gain a foothold in society. The following is a summary essay on the work of ordinary steel structure employees compiled by me for your reference only. Welcome to reading.

Summary of the work of ordinary staff of steel structure fan in Wen Yi. In 20xx years, under the correct leadership of the manager, with the active support and great help of my colleagues, I was able to be strict with myself, better perform my duties as a supervisor and better complete my tasks. To sum up, I have gained a lot.

First, on-the-job study, and constantly improve their professional level.

As a supervisor, first of all, if you have a high professional level, you can win the support of your colleagues and take good care of the people below. I have too much to learn for a new employee. With the continuous expansion of the factory scale, new requirements are put forward for our supervision work. Through learning, I can always know all kinds of abilities in advance and give guidance to the following employees.

Second, the staff management

Du Zhi is not a great leader, but he also manages a lot of people. It is the trust of the leaders that makes me shoulder this heavy responsibility. Therefore, in my work, I always have strict requirements for them. No matter who violates discipline, I will not tolerate it. It is precisely because I can be strict with myself, manage boldly, and care about the employees below in my life that they all respect me.

Third, on-site management

This is a big concept and contains a lot of contents. I will summarize my work from the following small aspects:

1, on-site code of conduct, generally speaking, I don't think it is well controlled. Among them, gfd's words were not said by the company, which led to the opportunity for employees to make excuses, and I could not control this situation. I want to learn how to deal with and manage the on-site code of conduct of employees from my future work.

2. The first floor of the venue environment is the facade of the company. Usually, the flow of people is relatively large, and the hygiene is not bad. However, I don't think I can think of all the ways to deal with some emergencies. I don't think I can manage cleaning.

Cardiopulmonary bypass has lagged behind others in this link, and because I hurt all the managers on the first floor this time, I also learned a lot from this "tuition". I believe I will be more alert to these things after this incident.

4. I can't control the commodity management link led by the manager well. The general manager always asks us to check their products frequently. Of course, through these inspections, many problems can be found and reflected in time, and these problems can be nipped in the bud.

Fourth, do a good job at the first level and share worries with leaders.

As a supervisor, I will never bother my leader about problems that can be solved at the clerk level. I will report to my leader for instructions about major events in the mall.

Through the summary of 20xx, I have several feelings, which is also a plan for 20xx:

The first is to cultivate team spirit. Because company management is not an individual behavior, a person's ability is bound to be limited. If everyone is twisted into a rope, we can get twice the result with half the effort. But this must be based on the fact that every employee has a high professional quality, a sense of responsibility for work and a good moral quality, otherwise team spirit will become an empty talk. So how to actively carry forward team spirit? Specific to each employee, if your efforts and achievements are recognized by the leaders, it will inevitably affect your colleagues around you. Everyone follows your example, and your progress invisibly drives everyone's progress. On the contrary, the achievements of others will also become the driving force for your continuous progress, thus forming a chain reaction of a virtuous circle. Second, learn to communicate with departments, leaders and employees. The organizational distribution of a company is like a net, and each department seems to be independent, but in fact there is an inevitable connection between them. Take the field service department as an example. Every department has to deal with daily affairs. Keep in touch with all departments and ask them to cooperate with each other and correct problems in time when they are found. In this way, the supervision function is effectively played, and secondly, the information can be fed back to the leaders in time, so that the work can be changed from passive to active. The third is to have an enterprising heart to climb the peak forever. This puts higher demands on our grass-roots managers-sailing against the current, not advancing or retreating. If you want to develop your career, you must arm your mind to adapt to the market competition environment of survival of the fittest.

How many times in life? In the days to come, we should turn our thoughts into actions and paint the blueprint for the future with our diligence and wisdom.

Summary of the work of ordinary staff of steel structure: Fan began to participate in the apprenticeship of processing various components of steel structure in 20xx. Under the careful training and guidance of the master, I can work hard, be diligent, be rough and bear hardships.

I need to learn too much, because I am still young.

Basically mastered the basic skills of processing technology, and made good progress in marking, bending and welding technology.

20xx years: there is no end to learning and no end to skills.

After receiving a large number of steel structure workshops and new prisons from Lubao Company, the company worked overtime to produce girders and process various accessories.

For half a month in a row, I finished the production task as scheduled, and I also felt the improvement of my skills and technology.

20xx year: Starting from today, due to the machining accuracy and technical requirements.

In the study and review of construction drawings, we have conducted a comprehensive study and mastery, especially for the machining accuracy of C2 standardized workshop in xx Development Zone, and solved many technical difficulties by using the learned technology.

All the processed parts meet the requirements, which further enhances my passion and desire for future study and work.

20xx: During my participation in the processing of xx modern thoroughbred cattle breeding base, xx bioengineering, xx factory equipment renovation and other factories, several new technologies that I have never been exposed to before have been successfully completed after repeated rework and data modification.

Although this complicated and troublesome task makes people feel very tired mentally and physically, it is a greater test and gain in business.

20xx: Many tasks in XX Group, Power Plant, Bole Cement Plant and other projects are waiting to be overcome step by step. This year is a whole year, a year in which the technical requirements of production projects are innovative and the manufacturers are reformed.

Study harder with more confidence.

Summary of the work of ordinary staff in steel structure Model essay III. Supervision institutions, supervisors and invested supervision facilities.

Our unit undertakes the supervision of the construction stage of this project (sub-projects such as building water supply, drainage, heating, building electricity, lightning protection and grounding of building electricity, fire retardant coating of steel structure, etc.). Not within the scope of the supervision contract), the project supervision institution shall supervise the project according to the supervision contract and design documents, construction contract, national laws, regulations, construction standards and construction acceptance specifications entrusted by the construction unit.

According to the structural characteristics of the project, the complexity of the project structure and the importance of the project, the project supervision organization adopts the organizational form of linear functional supervision organization. Under the direct leadership of the chief supervision engineer, three professional supervisors, a steel structure supervision engineer, a civil engineering supervision engineer and a supervisor are arranged for this project.

In order to facilitate the timely and effective communication of engineering information, the project supervision department is equipped with 1 full-time document management personnel, who are responsible for the collection, transmission, processing, sorting and distribution of engineering information under the leadership and guidance of the chief supervision engineer, and equipped with a computer and a printer. In order to control the engineering quality, according to the characteristics of this project, the project supervision department is equipped with testing tools such as rebound hammer, test hammer and measuring instrument, which can be used by professional supervision engineers and supervisors of the project supervision department for daily inspection, inspection and parallel inspection of the engineering process quality.

Second, the performance of the supervision contract

During the performance of the supervision contract, in view of the quality and schedule deviation during the construction of this project, the project supervision department, while doing a good job in information management, timely adjusted the supervision target control measures according to the characteristics of the existing problems in the project, and timely communicated and coordinated with the owner and the construction unit. In the supervision work of the project construction stage, the project supervision department adopts practical and effective organizational measures and methods to control the project quality and progress objectives, and mainly adopts special meeting measures, phased supervision work summary measures, on-site investigation methods, and all-round tracking supervision and management methods to supervise the project, thus ensuring the effective performance of the project contract.

The investment control of this project is controlled by the owner; The construction period of this project is delayed, and the actual construction period is 4 months longer than the contract.

Thirdly, the effectiveness of supervision.

Since our company undertook the supervision work in the construction stage of this project, we have always adhered to the professional ethics of supervision work, and carried out supervision work with a scientific, fair, independent and orderly work style and a rigorous and serious work attitude.

After the implementation of this project supervision, the project supervision department will strictly control the project quality together with the project quality management department of New Yangzi Shipbuilding Co., Ltd., and mainly take measures to supervise and manage the project quality by special personnel in view of the key parts and key working procedures of this project. In the process of project supervision, the project supervision department actively communicates with the owner and the construction unit. In view of the quality problems existing in the construction process, the project supervision department has taken organizational measures, economic measures, technical measures and other measures and methods. , strengthen the project quality, under the premise of ensuring the project quality, strictly grasp the construction progress of the project.

Among them, the processing of steel members is supervised by the owner (Yixing Saite Steel Structure Co., Ltd.), the quality of steel members processed by steel subcontractors is randomly sampled by the project supervision department, and the material witness of the project supervision department is responsible for the sampling and re-inspection of raw materials quality of steel members. The project supervision department urges the general contractor to improve the quality inspection system and strengthen the quality management of subcontractors' on-site construction in view of the quality problems found in the sampling inspection of steel structure processing and production, and requires the quality inspector of the general contractor to track and supervise the subcontractor's rectification process and results of existing quality problems on the spot.

The quality inspection and acceptance of steel members entering the construction site shall be carried out by the project supervision department in conjunction with the site owner's representative and the steel structure quality inspector of the construction unit. For the steel members found in the inspection that do not meet the quality requirements, the project supervision department should communicate with the owner's representative and agree that the construction unit should carry out rectification and construction on the construction site according to the actual situation of the project. For steel members with quality problems, in the process of rectification construction, the project supervision department mainly adopts the working method of on-site supervision to strengthen the supervision and management of the quality of the engineering process, requiring the construction unit to apply for inspection in strict accordance with the supervision procedures, and professional supervisors and owners' representatives to accept the rectification construction results.

In view of the quality and progress problems existing in the process of processing, fabrication, installation and construction of steel members, the project supervision department and the engineering quality department of the construction unit respectively require the construction unit to rectify within a time limit in the form of oral notice, written notice and special meeting, and submit them for inspection according to the supervision procedures.

Through the above methods and measures, the quality and safety of the project were ensured, and the driving test was successfully carried out under the auspices of the owner on xx, xx, XX.

Four, the quality problems in the process of construction and its treatment and suggestions

1, the quality of the main structure

(1), the steel structure of the main structure of the workshop is composed of columns, trusses, roof trusses, supporting systems and enclosure structures, and the external wall is composed of porous masonry and steel plates; In the process of steel structure production of subcontractors, the construction unit sends people into the factory to check the construction quality of the project (Yixing Saite Steel Structure Company), and the project supervision department sends people into the factory from time to time to conduct spot checks on the project quality, and puts forward some rectification requirements for the quality problems existing in the construction of steel members in the aspects of shot blasting, rust removal, welding, assembly, pre-assembly and painting. Under the inspection and acceptance of the supervisor and the owner's personnel, the rectification results basically meet the requirements; During site installation, the supervisor followed the construction process of steel pipe column hoisting, trapezoidal roof truss hoisting, crane beam installation and high-strength bolt connection. In view of the quality problems in the process of steel structure installation and construction, the project supervision department mainly adopts the working method of on-site supervision to urge the construction unit to carry out on-site rectification of unqualified projects, and the project supervision department and the owner's representative jointly check and accept the rectification results.

(2) In the process of installation and construction of steel structure main body, there are mainly deviations of installation dimensions beyond the requirements of acceptance specifications and suspected hollowing of concrete filled steel tubular columns. In view of the above problems, the professional supervisors of the project supervision department will measure the parts with installation deviation one by one, clearly identify the suspected empty drum parts in the concrete of steel tube columns, and ask the construction team to carry out drilling inspection on the steel tube columns, and the project supervision department will report the inspection results of the above problems to the owner in time. After the project supervision department communicated with the owner and the construction unit, the owner and the project supervision department asked the general contractor to contact the design institute and invite the designer to visit the site. The design unit shall, according to the results of on-site investigation and inspection by the project supervision department, issue a design technical treatment plan. On-site supervision personnel and owner's personnel witnessed the rectification process of the construction unit according to the design technical treatment plan. 13 On April 28th, the project supervision department, the engineering quality department of the construction unit, the design institute and the construction unit conducted a comprehensive inspection and acceptance of the rectification results of the quality problems existing in the installation and construction of the steel structure main body, and the inspection and acceptance results met the design requirements. 1May 14 The Engineering Quality Department of New Yangzi Shipyard carried out operation inspection on the engineering quality, and the inspection results met the design requirements normally.

(3) Strength grade of concrete filled steel tubular columns: The strength grade of concrete filled steel tubular columns was originally designed as xx, but it was changed to xx according to the owner's instructions. According to the strength evaluation of the test block, the evaluation results all meet the requirements.

Through the engineering inspection and process acceptance of the main structure division, the self-evaluation of the construction unit is qualified, and the acceptance of the supervision unit meets the requirements of the design documents and acceptance standards.

Xx, a model worker who summarized the work of ordinary staff in steel structure, graduated from xx University in XX and successfully obtained a bachelor's degree in industrial engineering. I worked as an intern in the workshop of No.2 Factory of xx Company, and was transferred to the quality management department of the company in 20xx because of my excellent work performance. In the quality management department, I was transferred to xx Company in XX month due to my active and serious working ability, and I have been working ever since.

I graduated from xx University in 20xx 10, and became a formal employee of xx Company. In the following work, I always abide by the discipline and laws, abide by the company's rules and regulations, strive to demand myself in all aspects, improve the level of ideological consciousness, love my job, conscientiously do every task assigned by the leaders, and have achieved relatively optimistic results.

During my work in the quality management department, I worked hard to learn professional and technical knowledge, and combined what I learned with my work practice, so that my work could be carried out better. During this period, I have participated in the quality control and production guidance of xx and other projects, so that all projects can be completed on time with good quality and quantity.

During my work in xx, I participated in the work of xx Company. In order to cooperate with the long-term progress and development of enterprises, I participated in the preparation of patent projects of seven companies.

Through more than one year's work and study, I have mastered a lot of knowledge, and have a comprehensive understanding of the quality control and production guidance of engineering projects, further improving my technical level and comprehensive management and coordination ability. At the same time, I have a comprehensive understanding of the production, process planning and technical scheme of box-section members, section steel members, circular steel members, circular steel truss steel members, square tube truss steel members and H-beam composite members in steel structures, which further improves my working ability. While completing my own work, I also actively completed various tasks assigned by the leaders.

Looking back on the work in the past year, although some progress and achievements have been made, there are still some shortcomings in some aspects. For example, there are not many creative work ideas, and individual work is not perfect enough, which needs to be improved in future work. Strive to make ideological consciousness and work efficiency reach a new level in an all-round way, enrich their own construction management experience, strengthen the study of new technology application in their spare time, strengthen the management of on-site production management and technical quality management, so as to adapt to the development trend of the construction processing market environment, adopt advanced scientific management concepts, and combine advanced technology and management experience with advanced management technologies at home and abroad to form their own independent technical advantages. Make more and more contributions to the development of the company.

The competition in the construction market is becoming more and more fierce, and the requirements for project management and quality are getting higher and higher, which requires us to regulate ourselves with higher requirements and standards. As production technicians, we should consciously integrate modern scientific and technological knowledge and improve our own knowledge system. In order to generate greater economic benefits, enhance the competitiveness of construction enterprises, and enable enterprises to obtain a better living environment in the increasingly fierce competition.

No, no, no, we should constantly enrich ourselves, study hard and work hard in order to keep up with the ever-changing changes of the times and be invincible in the fierce market competition environment.